0618-02 - Barge Shock Test - DWG 5038599 EASU Assembly.pdf
PDF 488 KB Posted
- Attached to
- Barge Shock Test Federal contract opportunity
- Solicitation number
- N0017821Q6998
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF18 Extended.pdf | ||
| 0618-02 - Barge Shock Test - Fixed Site AVCAD 901E Barge Matrix 06JUN2021.xlsx | XLSX spreadsheet | |
| 0618-02 - Barge Shock Test - DWG 5038598 CDU Assembly.pdf | ||
| SF18 Released.pdf | ||
| SOW - Redacted.pdf | ||
| 0618-02 - Barge Shock Test - DWG 5038597 Detection Unit Assembly.pdf | ||
| 0618-02 - Barge Shock Test - DID DI-MISC-80508B.pdf | ||
| 0618-02 - Barge Shock Test - Terminal Box Assembly 404-525-REV-A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
1.
3.
4.
5.
6.
UNLESS OTHERWISE SPECIFIED ALL DIMENSIONS ARE IN INCHES.
LOCATION TO BE DETERMINED AT INSTALLATION.
DENOTES CENTER OF GRAVITY AND IS A CALCULATED LOCATION.
DIMENSIONS ARE REFERENCE UNLESS TOLERANCE IS SPECIFIED.
UNIT HULL FOUNDATION SHALL BE DESIGNED, MANUFACTURED, AND
BONDING AND GROUNDING SHALL BE IN ACCORDANCE WITH MIL-STD-1310.
INSTALLED TO COMPLY WITH SHOCK AND VIBRATION REQUIREMENTS
LISTED IN DATA TABULATION TABLE.
7. LENGTH TO BE DETERMINED BY INSTALLING ACTIVITY.
8. THIS EQUIPMENT SHALL BE MOUNTED IN A LOCATION EXPOSED TO
THE WEATHER.
9.
2.
THERE ARE NO CRITICAL REQUIREMENTS FOR LEVELING OF THE EQUIPMENT
OR FOUNDATION. FLATNESS AND STANDARD PRACTICES OF THE INSTALLING
ACTIVITY SHALL BE USED.
DAHLGREN, VA., CBR DEFENSE DIVISION.
REFERENCES:
DRAWING 5038596.
1.
2.
DRAWING LIST - SEE DRAWING 5038593.
IPDS-LR
EXTERNAL AIR SAMPLING UNIT ASSEMBLY
OUTLINE AND INSTALLATION
DATA TABULATION
WEIGHT
DIMENSIONS
VOLUME
CRATED
INSTALLED
CRATED
INSTALLED
CRATED
INSTALLED
SHIPPING CONTAINERS
MANUFACTURER'S PART No.
POWER REQUIREMENTS - MIL-STD-1399 SECTION 300
SOURCE
TYPE
POWER
VOLTS
FREQUENCY
CURRENT
PHASE
POWER FACTOR
HEAT DISSIPATION
OPERATING TEMP.
STORAGE TEMP.
RELATIVE HUMIDITY
SHOCK REQT.
VIBRATION REQT.
ENCLOSURE MATERIAL
MOUNTING SURFACE
GROUND SURFACE
NOTE 13
11.133
MIL-S-901D, GRADE A, CLASS I
MIL-STD-167-1, TYPE I
TABLE I
DENOTES MAINTENANCE AND/OR OPERATIONAL CLEARANCES.
N/A
THIS EQUIPMENT IS DESIGNED TO WITHSTAND GRADE A SHOCK, IAW MIL-STD-810E,
MIL-STD-901D AND MEETS THE VIBRATION REQUIREMENTS OF MIL-STD-167/1 (TYPE).
10.
ENSURE ALL SERVICES AREAS ARE MAINTAINED AND EQUIPMENT IS MOUNTED
TO MEET GRADE "A" SHOCK REQUIREMENTS.
11.
NOTE 13
18.00" X 7.992" X 6.513"
NOTE 13
0.054 CU FT
NOTE 13
271120
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
0 C TO 50 C
LEGEND:
TBD - TO BE DETERMINED
EMI - ELECTROMAGNETIC INTERFERENCE
IAW - IN ACCORDANCE WITH
C - DEGREES CELSIUS
12. INTERPRET DRAWING IAW ASME Y14.100, AND MIL-D-23140D (NAVY).
DENOTES BULKHEAD CUTOUT.
DENOTES SHIPS BULKHEAD.
-20 C TO 52 C
5% TO 95%
13.
THE IPDS-LR SYSTEM COMPONENTS ARE CRATED IN ONE PACKAGE. THE SYSTEM
CRATE SPECIFICATIONS ARE AS FOLLOWS:
WEIGHT: 450 LBS
DIMENSIONS: 46" X 45" X 32"
VOLUME: 38.33 CU FT
TABLE II
QTY
NAME
MOUNTING HARDWARE TABULATION
PART No.
GASKET, EASU
BULKHEAD MOUNT, EASU
HEXHDMS - HEX HEAD MACHINE SCREW
STAINLESS STEEL
NOTE 14
N/A
14. THE IPDS-LR SYSTEM COMPONENTS MOUNTING MATERIALS ARE AS FOLLOWS:
1. EASU ASSEMBLY - STAINLESS STEEL ALLOY
2. EASU GASKET - AUTOMOTIVE RUBBER PER ASTM D 2000 M1BF607
3. EASU MOUNTING PLATE - ALUMINUM / MAGNESIUM ALLOY
15.
AIR INLET AND OUTLET LINES THAT CONNECT EASU WITH DETECTOR UNIT ARE
72 INCHES. EASU IS TO BE MOUNTED ABOVE DETECTOR UNIT, WITHIN A
DISTANCE THAT ALLOWS CONNECTION OF AIR INLET AND OUTLET LINES.
A. NEW SHIP CONSTRUCTION: THIS CONFIGURATION TO BE USED FOR SHIPS
THAT DO NOT HAVE A WEATHER DECK SO THE EASU'S CAN BE ACCESSED
FROM INTERIOR OF SHIP FOR MAINTENANCE.
B. NEW SHIP CONSTRUCTION: IPDS-LR EASU INLET SHALL BE LOCATED WITHIN
FOUR FEET OF DU INLET.
C. FOR INSTALLATIONS WHERE IPDS-LR IS REPLACING EXISTING IPDS: THE
DISTANCE BETWEEN EASU INLET AND DU INLET MAY BE UP TO SIX FEET TO
ACCOMODATE POSSIBLE REUSE OF EXISTING FOUNDATIONS.
AT NSWCDD, DAHLGREN, VA., CBR DEFENSE DIVISION.
3.
DRAWING REVIEWED BY SYSTEM LEAD
DRAWING APPROVED BY PROGRAM ENGR
DRAWING APPROVED FOR COMNAVSEA
WASHER, FLAT 3/8 - CRES
MYLON-INSERT LOCKNUTS, 3/8"-16 - CRES
16.
EASU INLET & OUTLET SUBASSEMBLIES SHOWN ON SHEET 3.
NOTES:
1.
3.
4.
5.
6.
UNLESS OTHERWISE SPECIFIED ALL DIMENSIONS ARE IN INCHES.
LOCATION TO BE DETERMINED AT INSTALLATION.
DENOTES CENTER OF GRAVITY AND IS A CALCULATED LOCATION.
DIMENSIONS ARE REFERENCE UNLESS TOLERANCE IS SPECIFIED.
UNIT HULL FOUNDATION SHALL BE DESIGNED, MANUFACTURED, AND
BONDING AND GROUNDING SHALL BE IN ACCORDANCE WITH MIL-STD-1310.
INSTALLED TO COMPLY WITH SHOCK AND VIBRATION REQUIREMENTS
LISTED IN DATA TABULATION TABLE.
7. THIS EQUIPMENT SHALL BE MOUNTED IN A LOCATION EXPOSED TO
THE WEATHER.
8.
2.
THERE ARE NO CRITICAL REQUIREMENTS FOR LEVELING OF THE EQUIPMENT
OR FOUNDATION. FLATNESS AND STANDARD PRACTICES OF THE INSTALLING
ACTIVITY SHALL BE USED.
DAHLGREN, VA., CBR DEFENCE DIVISION.
REFERENCES:
DRAWING 5038596.
1.
2.
DRAWING LIST - SEE DRAWING 5038593.
IPDS-LR
EXTERNAL AIR SAMPLING UNIT ASSEMBLY
OUTLINE AND INSTALLATION
DENOTES MAINTENANCE AND/OR OPERATIONAL CLEARANCES.
THIS EQUIPMENT IS DESIGNED TO WITHSTAND GRADE A SHOCK, IAW MIL-STD-810E,
MIL-STD-901D AND MEETS THE VIBRATION REQUIREMENTS OF MIL-STD-167/1 (TYPE).
9.
ENSURE ALL SERVICES AREAS ARE MAINTAINED AND EQUIPMENT IS MOUNTED
TO MEET GRADE "A" SHOCK REQUIREMENTS.
10.
LEGEND:
TBD - TO BE DETERMINED
EMI - ELECTROMAGNETIC INTERFERENCE
IAW - IN ACCORDANCE WITH
C - DEGREES CELSIUS
11. INTERPRET DRAWING IAW ASME Y14.100, AND MIL-D-23140D (NAVY).
DENOTES BULKHEAD CUTOUT.
DENOTES SHIPS BULKHEAD.
12. ITEMS 45, 46, 47 ARE ONLY SUPPLIED WHEN SHIPS CONFIGURATION REQUIRES
INSTALLATION AS SHOWN ON SHEET 1.
A) WHEN CONFIGURATION IS REQUIRED, ITEM 5 & 6 FROM REF 2 WILL BE
DELIVERED ASSEMBLED ON ITEM 45 USING ITEMS 46 & 47.
TABLE I
QTY
NAME
MOUNTING HARDWARE TABULATION
PART No.
5975-12-400-3459
HEXHDMS - HEX HEAD MACHINE SCREW
AT NSWCDD, DAHLGREN, VA., CBR DEFENCE DIVISION.
3.
5340-12-400-3642
5340-12-400-3369
5330-01-464-1864
45330-12-400-4850
5305-12-400-3218
5310-12-390-3805
6665-12-389-0803
6665-12-389-0889
4720-12-389-1119
4720-12-389-0526
5340-12-389-0820
5305-12-400-3217
5310-12-390-3805
13.
ITEMS 39, 40, 35, 38, 34, 37 MAKE UP EASU INLET ASSEMBLY, ITEM 5 ON REF2.
THESE WILL BE DELIVERED PRE-ASSEMBLED.
14.
ITEMS 39, 40, 36, 38, 34, 37 MAKE UP EASU OUTLET ASSEMBLY, ITEM 6 ON REF 2.
THESE WILL BE DELIVERED PRE-ASSEMBLED.
| 2016-01-26T10:47:04-0500 | |
| SMITH.JEFFERY.ERIC.1180380945 |
| 2016-01-26T11:28:36-0500 | |
| BARA.CHRISTOPHER.E.1386907966 |
| 2016-08-15T15:50:59-0400 | |
| COFIELD.JON.WILLIAM.1180815666 |
File details come from the government source that posted it. Updated .