059pricing_GeoSpec.xlsx

XLSX spreadsheet 83 KB Posted

Attached to
Competitive Selection OH|DOT05924-3
Contract number
DOT05924-3
Issued by
Ohio

About this file

This document is a state-level pricing document for Geohazard Maintenance (Contract 059-24) issued by the Ohio Department of Transportation (ODOT), with GeoSpecialties of Nicholasville, Kentucky as the vendor. The document is dated 11/1/23 and provides detailed pricing for geotechnical and infrastructure stabilization services across all 12 ODOT districts.

The contract covers six primary service categories: Launched Soil Nail, Drilled Soil Nail, Self-Drilling Soil Nail, Plate Piles, Plug Piles/Drilled Shafts, Scaling, and Trim Blasting. Pricing varies based on project scale, with tiered rates for different quantities (e.g., 50 nails or less vs. 51 or more). Additional services include mobilization, traffic control, excavation, grading, seeding, and material handling, with specific hourly and unit rates for each. The contract includes provisions for travel compensation between sites, with rates of $150 within a county and $250 between counties, plus mileage reimbursement. Mobilization and traffic control costs are listed by district, ranging from $5,000 to $12,500, with flagger rates at $115 per hour.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR INFORMATION

059-24 Pricing Geohazard Maintenance 11/1/23
Vendor Name:GeoSpecialties

Vendor Location: 1060 Elizabeth Street, Unit 8, Nicholasville, KY 40356

Contact Person: Justin Anderson

Telephone Number: Office (859) 361-2465 Mobile (859) 583-0732

Fax Number:

Email Address: justin.anderson@geospecialties.com

READ THE INFORMATION BELOW BEFORE PROCEEDING

UTILIZE THE LINK ON THE FRONT PAGE OF THE SPECIFICATIONS TO SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID

1 COMPLETE ALL VENDOR INFORMATION ABOVE

2 FOR EACH ITEM YOU WISH TO BID, PROVIDE PRICING

3 FOR ITEMS THAT YOU DO NOT WISH TO PROVIDE A BID FOR, PLEASE LEAVE BLANK.

4DO NOT INCLUDE CONDITIONAL INFORMATION WITH YOUR BID THAT WILL CHANGE THE TERMS OF THE BID
** DOING SO MAY RESULT IN REJECTION OF YOUR BID.

5 SEE ADDITIONAL NOTES/INFORMATION AT THE TOP OF EACH PRICING PAGE

6 ……..AND DO NOT DELETE/REMOVE PAGES, TABS OR COLUMNS FROM THIS BID SHEET.

Launched Soil Nail

059-24 Pricing Geohazard Maintenance 11/1/23ITEM A - Launched Soil Nail
Vendor NameGeoSpecialties
NOTE
(1)The Launched soil nail shall meet the requirement of Section 6.
(2)Bid shall be the final in-place position of a Launched Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

UNIT OF MEASURE50 Nails or Less51 or more Nails
ITEM ALaunched Soil NailEACH
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1District 7Flagger
District 2District 8
District 3District 9
District 4District 10
District 5District 11
District 6District 12

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
ExcavationHRExcludes hauling and wasting

Grading HR Restore site to stable grade

Seeding SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock FillHRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and WastingHRRemoval of excess from site and wasting it.
Hauling and WastingTNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ANY ADDITION OF ITEMS BELOW WILL BE ADDRESSED PRIOR TO THE PROJECT START.

ITEM Price Unit of Measure Description

Drilled Soil Nail

059-24 Pricing Geohazard Maintenance 11/1/23ITEM B - Drilled Soil Nail
Vendor NameGeoSpecialties
NOTE
(1)The Drilled soil nail shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

750 LF or Less751 LF or more
ITEM BDrilled Soil NailLinear Feet$34.00$28.50
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,000.00Flagger(s)$115.00
District 2$7,500.00District 8$5,000.00
District 3$7,000.00District 9$6,000.00
District 4$7,000.00District 10$7,000.00
District 5$7,000.00District 11$7,000.00
District 6$7,000.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $1.25 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$150.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$165.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$42.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.
ITEMPriceUnit of MeasureDescription
SF$17.50Wire Mesh Surface Treatment, Tecco G65 3mm (or equivalent)Wire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface Treatment
SF$39.508 in Shotcrete per ODOT Standard Specifications, Section 5208 in Shotcrete8 in Shotcrete8 in Shotcrete8 in Shotcrete8 in Shotcrete8 in Shotcrete
SF$52.0012 in Shotcrete per ODOT Standard Specifications, Section 52012 in Shotcrete12 in Shotcrete12 in Shotcrete12 in Shotcrete12 in Shotcrete12 in Shotcrete
LF$200.00Casing Installation, per API Standard Specifications (2019)Casing InstallationCasing InstallationCasing InstallationCasing InstallationCasing InstallationCasing Installation
CF$22.25Cementitious Grout per ODOT Standard Specifications, Section 701Cementitious GroutCementitious GroutCementitious GroutCementitious GroutCementitious GroutCementitious Grout
CY$250.00Flowable Fill per ODOT Standard Specifications, Section 613

SELF - Drilling Soil Nail

059-24 Pricing Geohazard Maintenance 11/1/23ITEM C - Self Drilling Soil Nail
Vendor NameGeoSpecialties
NOTE
(1)The Drilled soil nail shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Self-Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

750 LF or Less751 LF or more
ITEM CSelf Drilling Soil NailLinear Feet$37.50$35.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,000.00Flagger(s)$115.00
District 2$7,500.00District 8$5,000.00
District 3$7,000.00District 9$6,000.00
District 4$7,000.00District 10$7,000.00
District 5$7,000.00District 11$7,000.00
District 6$7,000.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $1.25 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$150.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$165.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$42.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.
ITEMPriceUnit of MeasureDescription
$72.00SFSheet Piling: PZ 27 or Equiv. up to 30 ft long per ASTM A325Sheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft long
$38.00LFHorizontal Drains, ASTM D2729Horizontal DrainsHorizontal DrainsHorizontal DrainsHorizontal DrainsHorizontal DrainsHorizontal Drains
$46.00SFGRS Wall Construction (Up to 8ft deep) per FHWA-HRT-17-080GRS Wall Construction (Up to 8ft deep)GRS Wall Construction (Up to 8ft deep)GRS Wall Construction (Up to 8ft deep)GRS Wall Construction (Up to 8ft deep)GRS Wall Construction (Up to 8ft deep)GRS Wall Construction (Up to 8ft deep)
$38.00TONFree Draining Backfill Material per ODOT Standard Specifications, Section 520Free Draining Backfill MaterialFree Draining Backfill MaterialFree Draining Backfill MaterialFree Draining Backfill MaterialFree Draining Backfill MaterialFree Draining Backfill Material

Plate Piles

059-24 Pricing Geohazard Maintenance 11/1/23ITEM D - Plate Piles
Vendor NameGeoSpecialties
NOTE
(1)The Plate Piles shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Plate Pile. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

250 SQYD or Less251 SQYD or Greater
ITEM DPlate PilesSQYD$372.00$350.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,000.00Flagger(s)$115.00
District 2$7,500.00District 8$5,000.00
District 3$7,000.00District 9$6,000.00
District 4$7,000.00District 10$7,000.00
District 5$7,000.00District 11$7,000.00
District 6$7,000.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$725.00HRExcludes hauling and wasting

Grading $625.00 HR Restore site to stable grade

Seeding $1.25 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$625.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$180.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$40.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Plug Piles Drilled Shafts

059-24 Pricing Geohazard Maintenance 11/1/23ITEM E - Plug Piles/Drilled Shafts
Vendor NameGeoSpecialties
NOTE
(1)The Plug Piles/Drilled Shafts shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Plug Piles/Drilled Shafts. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

WALL LENGTH
Less than 60 FT61 FT or Greater ** Upper Length of contract is approximately 100 FT
ITEM EPlug Piles/Drilled Shafts
Drilled Shafts, 24" Diameter, Above Bedroack, As per PlanLNFT$260.00$260.00
Drilled Shafts, 24" Diameter, Into Bedrock, As Per PlanLNFT$350.00$350.00
Drilled Shafts, Misc,: Plug Pile, 24” Diameter, UnreinforcedLNFT$240.00$240.00
Steel Piles, Misc.: W16x31 Steel BeamLNFT$60.00$60.00
Steel Piles, Misc.: W10x42 Steel BeamLNFT$72.00$72.00
Steel Piles, Misc.: W12x53 Steel BeamLNFT$80.00$80.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,000.00Flagger(s)$115.00
District 2$7,500.00District 8$5,000.00
District 3$7,000.00District 9$6,000.00
District 4$7,000.00District 10$7,000.00
District 5$7,000.00District 11$7,000.00
District 6$7,000.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$725.00HRExcludes hauling and wasting

Grading $625.00 HR Restore site to stable grade

Seeding $1.25 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$625.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$180.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$40.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Scaling

059-24 Pricing Geohazard Maintenance 11/1/23ITEM F - Scaling
Vendor NameGeoSpecialties
NOTE
(1)The Scaling shall meet the requirements of Section 6
(2)Bid shall be provided for the time lines provided.
(3)Hauling and removal of all materials.
(4)Mobilization is to any location within a District.
(5)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

Hourly
ITEM FScalingTime$725.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,000.00Flagger(s)$115.00
District 2$7,500.00District 8$5,000.00
District 3$7,000.00District 9$6,500.00
District 4$7,000.00District 10$7,000.00
District 5$7,000.00District 11$7,000.00
District 6$7,000.00District 12$12,500.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $1.25 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$600.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$165.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$40.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Trim Blasting

059-24 Pricing Geohazard Maintenance 11/1/23ITEM G - Trim Blasting
Vendor NameGeoSpecialties
NOTE
(1)The Scaling shall meet the requirements of Section 6
(2)Provide pricing for the time lines listed
(3)Hauling and removal of all materials.
(4)Mobilization is to any location within a District.
(5)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

250 SQFT or Less251 SQFT or Greater
ITEM GTrim BlastingSQFT$25.00$20.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,000.00Flagger(s)$115.00
District 2$7,500.00District 8$5,000.00
District 3$7,000.00District 9$6,500.00
District 4$7,000.00District 10$7,000.00
District 5$7,000.00District 11$7,000.00
District 6$7,000.00District 12$12,500.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation600HRExcludes hauling and wasting

Grading 600 HR Restore site to stable grade

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill150HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting165HRRemoval of excess from site and wasting it.
Hauling and Wasting42TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.
ITEMPriceUnit of MeasureDescription
$130.00LFRock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (<200LF) per ODOT Supplemental Spec 862 (2009)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (<200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (<200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (<200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (<200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (<200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (<200LF)
$99.00LFRock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (>=200LF) per ODOT Supplemental Spec 862 (2009)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (>=200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (>=200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (>=200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (>=200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (>=200LF)Rock Dowel - #8 Grade 75 All-Thread Bar (Galvanized) (>=200LF)
$29.00SFRock Mesh - Type II (Diamond Mesh) per ODOT Supplemental Spec 862 (2009)Rock Mesh - Type II (Diamond Mesh)Rock Mesh - Type II (Diamond Mesh)Rock Mesh - Type II (Diamond Mesh)Rock Mesh - Type II (Diamond Mesh)Rock Mesh - Type II (Diamond Mesh)Rock Mesh - Type II (Diamond Mesh)
$30.00SFRock Mesh - Type III (Cable Nets) per ODOT Supplemental Spec 862 (2009)Rock Mesh - Type III (Cable Nets)Rock Mesh - Type III (Cable Nets)Rock Mesh - Type III (Cable Nets)Rock Mesh - Type III (Cable Nets)Rock Mesh - Type III (Cable Nets)Rock Mesh - Type III (Cable Nets)
$348.00LFTemporary Rockfall per ODOT Supplemental Spec 862 (2009)Temporary Rockfall BarrierTemporary Rockfall BarrierTemporary Rockfall BarrierTemporary Rockfall BarrierTemporary Rockfall BarrierTemporary Rockfall Barrier

MOT

059-24 Pricing Geohazard Maintenance 11/1/23MAINTENANCE OF TRAFFIC
Vendor NameGeoSpecialties

MAINTENANCE OF TRAFFIC

PriceUnit of Measure
M.O.T. / No Lane Closure$4,500.00Lump Sum(When requested)Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone.
M.O.T. w/Single Lane Closure$8,500.00Lump Sum(When requested)Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone.
PCB (M.O.T.)$55.00Linear Ft.(When requested)A separate charge for approved temporary portable concrete barrier has been provided.
End Treatment (M.O.T)$4,500.00Each(When requested)A separate charge for an approved temporary portable concrete barrier end treatment for work zones has been provided.
Flagger$115.00$ / hr / flagger(When necessary)The number of flaggers may vary from project to project. (This number should match the individual tabs if completed in both sections)

SS832

059-24 Pricing Geohazard Maintenance 11/1/23SS832 Pricing
Temporary Sediment and Erosion Control Best Management Practices (BMP)

Unit Price Schedule, July 2023

Project Identified EDA (acres)Fixed PriceComment
<55 to 1010 to 1515 to 20>20($)
ItemUnitDescriptionPrice ($)
832Sq. Yd.Construction Seeding and
Mulching$1.12$1.03$0.93$0.84$0.83Based on

NOI acres

832FeetSlope Drains$13.50
832Cu. Yd.Sediment Basins and Dams$15.25[3]
832Cu. Yd.Excavated Drop Inlet Protection$15.25
832FeetPerimeter Filter Fabric Fence$4.54$3.48$3.19$2.86$2.58Based on

NOI acres

832FeetFilter Fabric Ditch Check$12.50
832FeetInlet Protection$12.75
832Cu. Yd.Earthen Dike/Berm$3.50
832Sq. Yd.Temporary Stabilization Matting$3.00
832Cu. Yd.Rock Ditch Check, Type C or D
without Filter$57.00[1]
832Cu. Yd.Rock Channel Protection, Type C
or D with Filter$62.00[1]
832Cu. Yd.Rock Channel Protection, Type C
or D without Filter$57.00[1]
832Cu. Yd.Basin Sediment Removal$11.25
832Cu. Yd.Miscellaneous Sediment Removal$17.50
832FeetConstruction Fence$3.00
832Sq. Yd.Construction Mulching$0.89$0.80$0.65$0.63$0.61Based on

NOI acres 832 Sq. Yd. Winter Seeding and Mulching $1.21 $1.12 $1.03 $0.95 $0.91 Based on NOI acres

832Cu. Yd.Construction Entrance$84.50
[1]Add the following amount per cubic yard for the cost of Type C or D Rock materials.
[3]Add the amount for the appropriately sized surface dewatering device for sediment basin outlet.