0510052 - Specifications for product, services, shipping, packagind, delivery.docx
DOCX document 25 KB Posted
- Attached to
- Retroreflective Sheeting
- Contract number
- 395002-O18-0510052-000-
- Issued by
- Wisconsin
About this file
This document contains specifications for Wisconsin Department of Transportation Bid #0510052 covering retroreflective traffic sign sheeting, inks, and support services. The contract involves the Wisconsin Department of Transportation as the primary agency, with the Wisconsin Department of Corrections - Badger State Industries serving as additional delivery locations at Jackson Correctional Institution and Stanley Correctional Institution.
The contract covers the supply of Type I, Type IV, and Type XI retroreflective traffic sign sheeting that must conform to ASTM D4956-16 standards, along with adhesives, transparent overlay film, process inks in standard traffic colors, and slip sheet paper for surface protection. The contractor must provide technical assistance services including qualified technician support for training at state facilities, screen printing problem resolution within 24 hours of request, and supply of a retroreflectometer with training for quality control purposes. Delivery requirements specify 28 calendar days maximum from order receipt to three designated locations, with specific delivery windows and notification procedures. Materials must be shipped on standard four-way entry pallets with proper hazardous material handling compliance, and all products and services including technical support are provided at no additional cost to the state.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wisconsin Department of Transportation Bid #0510052 – Retroreflective Traffic Sign Sheeting, Inks and Support
Attachment E – Product Specifications and Site Service Requirements For all Type IV and Type XI sheetings, furnish traffic sign sheeting from the Department’s current approved products list:
Here is our approved products list:
http://wisconsindot.gov/Documents/doing-bus/eng-consultants/cnslt-rsrces/tools/appr-prod/ap-current/sign-sheeting-4-1-2017.pdf
For Type I sheeting, furnish traffic sign sheeting conforming to ASTM4956-16
Furnish sheeting with adhesive conforming to ASTM D4956-16 Backing Class 1: pressure sensitive requiring no heat, solvent or other preparation for adhesion to smooth, clean surfaces. Protect adhesive with an easily removable liner.
Furnish transparent overlay film conforming to Section 637.2.3.3 of the Department’s Standard Specifications for Highway and Structure Construction, found here:
http://wisconsindot.gov/rdwy/stndspec/ss-06-00.pdf
Furnish, at no additional cost, process inks in standard traffic colors, clears and thinners recommended for the sheeting to meet the performance requirements of this specification. Provide, at no additional cost, technical assistance in the use of these inks, if requested by the ordering agent or purchasing unit.
Furnish, at no additional cost, slip sheet paper recommended by the sheeting manufacturer for sheeting surface protection for use in packaging, storing, or shipping finished signs, in at least equal square footage and in the same dimensions as the sheeting supplied.
Wisconsin Department of Transportation
Attachment F - On Site Service Specifications/Requirements
In carrying out the scope of this Contract, the Contractor(s) shall be required to perform services on State property.
Bidders cost must include all transportation, insurance and other related charges. The contractor is required to maintain insurance in compliance with Section 4.6 of the Special Conditions of Bid.
Throughout the term of the initial contract and any extensions thereof, the manufacturer shall provide, at no additional cost to the State, the services of qualified technicians for instruction and training at State facilities. Technical assistance shall also include service on screen printing problems with the inks supplied in conjunction with this bid. Any technical assistance requested shall be provided within 24 hours of the request.
The bidder shall provide a sign retroreflectometer and training on its usage for Department of Corrections staff to conduct quality control of signs.
Wisconsin Department of Transportation
Attachment G – Shipping Locations, Packaging, and Delivery Requirements
There are currently three (3) identified ship-to locations.
The State reserves the right to amend and/or add to these locations.
1. Wisconsin Department of Transportation – Bureau of Traffic Operations 3609 Pierstorff Street, Madison WI 53704
| Deliveries Accepted: | Monday – Thursday | 7:00 AM – 4:30 PM | ||
| Friday | 7:00 AM – 11:00 AM | |||
| Primary Contact: | Jonathan Eldridge | 608-246-3270 | ||
| Secondary Contact: | Jay Hille | 608-243-5981 |
2. Wisconsin Department of Corrections – Badger State Industries (BSI) Jackson Correctional Institution N6500 Haipek Road, Black River Falls WI 54615
| Deliveries Accepted: | Monday – Friday | 8:00 AM – 2:30 PM | ||
| Primary Contact: | Addam Martinson | 715-284-4550, ext 7090 | ||
| Secondary Contact: | David Schuster | 715-284-4550, ext 7090 |
3. Wisconsin Department of Corrections – Badger State Industries (BSI) Stanley Correctional Institution 100 Corrections Drive, Stanley WI 54768
| Deliveries Accepted: | Monday – Friday | 8:00 AM – 2:30 PM | ||
| Primary Contact: | Bill Huber | 715-644-3795 |
Wisconsin Department of Transportation Page 1 of 2
Attachment H – Delivery and Packaging Requirements
Delivery and Shipping Requirements Sheeting and all other materials shall be delivered to the specified destination within 28 calendar days after receipt of order. Should the Contractor fail to complete the delivery thin this time frame, the State reserves the right to pursue Liquidated Damages as defined in Section 4.10 of the Special Conditions of Bid.
Truck shipments shall be accepted only at those times as specified for each location. Shipments arriving too late may be held for unloading the following workday. The Contractor shall notify the destination at least two (2) working days prior to arrival of each truck shipment, giving the quantity of material and date of arrival, so that arrangements may be made to have personnel available for unloading. Persons to be notified at each site are provided in this Attachment H.
Pallets Shipments must be on four-way entry pallets. Pallets must be in good condition, no broken boards or rails. Multiple packages may be banded or shrink-wrapped on a single pallet. Products must not exceed the pallet dimensions (40” x 48” x 60”), with no overhang. All hazardous materials must be picked, packed, wrapped, labeled, sorted and shipped per all Federal and State regulations. To facilitate delivery, dock level trucks must be used.
Damaged hazardous material(s) will not be accepted. It is the contractor or Freight Company’s responsibility for Hazmat clean up.
Packing and Maximum Bundle Sizes Each package of goods shall be delivered in standard containers so constructed as to ensure acceptance by common or other carriers for safe transportation at the lowest rate to the point of destination.
Commercial packages will be acceptable. Items shall be packed in substantial containers, so constructed as to ensure acceptance by common or other carriers for safe transportation at the lowest rate to the point of delivery. If at all possible, packaging that can be returned or is recyclable or made from recycled materials Wisconsin Department of Transportation Page 1 of 2 Bid #0510052 – Retroreflective Traffic Sign Sheeting, Inks and Support
Attachment H – Delivery and Packaging Requirements
(continued from page 1) should be used. The shipping containers shall be marked with the name of the material, size, type and quantity contained therein, and shall include the name of the contractor and the purchase order number.
Each carton/case must be clearly marked with the product, style number, product type, size, and color.
Inspection and Acceptance Certification of compliance with the specifications shall be required of the Contractor at the time of delivery.
File details come from the government source that posted it. Updated .