The file's text, extracted by GovTribe without its formatting.
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| PWS Paragraph |
| Task |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
1.2/5.1.4 Government Owned Central Issue Facility (CIF) items:
| Contractor must be able to launder the following government owned property to include: coveralls, overalls, poncho liners, jackets, parkas, trousers, and modular sleep systems (sleeping bags). |
| Contractor shall be liable for return of the number and kind of articles furnished for service under this contract; and shall indemnify the Government for any loss or damage to such articles. |
| 95% of the delivery each month. |
| Periodic Inspection/Customer Complaint/Spot Checks/Quarterly review |
| 5.1.3 Re-Performance of Laundering-re-wash |
| Laundry is delivered free of all visible dirt, debris, dampness, odor, mildew, cleaning chemical residue and has a uniform appearance |
| Any items found to be unsatisfactorily laundered as determined by the contracting officer or his/her authorized representative shall be re-laundered at no additional cost to the Government. |
| 95% of the delivery each month. |
| Periodic Inspection/ Customer Complaint/Spot Checks/Quarterly review |
| 5.1.5 All Laundry is delivered and not damaged or torn |
| All accountable items must be delivered or the Contractor shall issue an IOU (shortage ticket) within 48hrs of the original scheduled delivery date |
| All accountable items not delivered within 48 hours of the original scheduled delivery date will be considered as lost. If a lost item is not delivered by the last contractor workday of the month the item is lost and contractor shall reimburse to the government the replacement cost of the item. |
| 100% of the number and kind of articles turned in for service |
| Periodic Inspection/ Customer Complaint/Spot Checks/Quarterly review |
TECHNICAL EXHIBIT 2
Deliverables Schedule
| PWS Reference / Deliverable Title |
| Frequency |
| Number of Copies |
| Medium/Format |
| Submit To |
| 1.4.5.3 AT Level 1 Awareness Training Certificate |
| One Time |
| 1 |
| Electronic |
| COR |
| 1.4.5.4 iWatch Training Certificate |
| One Time |
| 1 |
| Electronic |
| COR |
| 5.1.1 Correct quantities of laundry are delivered and Invoices are accurate and correct |
| When laundered all items are returned to the CIF |
| 100% of the number and kind of articles turned in for service |
| Physically delivered |
| COR/CIF personnel |
| 5.1.1 Invoices are accurate and correct |
| When all laundered items are returned to the CIF |
| 100% of the number and kind of articles turned in for service |
| Physically delivered and Electronic copy |
| Emailed to COR/physically delivered to CIF personnel |
| 5.2 Pick up and Delivery Schedules are met |
| Upon notice from the CIF personnel |
| 100% of the number and kind of articles turned in for service |
| Physically delivered |
| COR/CIF personnel |
TECHNICAL EXHIBIT 3
Estimated Workload Data
(The provided information is for historical background only. It is not a guarantee of workload quantities. This is only an estimate based on FY 19, 20, 21 and half of 22.)
FY 19
| MOD SLEEPING BAG SYSTEM (5PC) |
| 1609 |
FY 20
| MOD SLEEPING BAG SYSTEM (5PC) |
| 1666 |
FY 21
| MOD SLEEPING BAG SYSTEM (5PC) |
| 1300 |
FY 22 (thru 30 Jun)
| MOD SLEEPING BAG SYSTEM (5PC) |
| 1222 |