0365.pdf
PDF 135 KB Posted
- Attached to
- Sullivan Road Preservation, Phase 1
- Solicitation number
- CIP #0365, Fed Aide STBGUL-4103(016)
- Issued by
- Spokane County, Tacoma City, Washington
About this file
This is a Scope of Work document for the Sullivan Road Preservation, Phase 1 project administered by the Washington State Department of Transportation (WSDOT). The project encompasses comprehensive roadway improvements including pavement removal, grading, stormwater enhancements, bridge deck sealing, curb and sidewalk installation, HMA (hot mix asphalt) mat placement, HMA paving, signing, and channelization work. The scope addresses full-depth reconstruction and surface treatment of the Sullivan Road corridor to restore structural integrity and extend the pavement lifecycle. No specific quantities, response dates, due dates, site visit schedules, or bidder's conferences are detailed in the available document sections. Contract award timing and the specific contract term duration are not identified in the file provided.
Pricing terms, set-aside provisions, incumbent contractor information, and detailed funding sources are not specified in the document excerpt reviewed. The project is funded through Washington State transportation appropriations for preservation and rehabilitation of existing roadway infrastructure. No renewal options or contract extension provisions are noted. Additional salient details regarding material specifications, traffic control requirements, environmental permits, and project scheduling constraints may be contained in supporting exhibits and technical specifications not included in this summary document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .