Trash Compactor Replacement – Addendum 1
This is an addendum document issued by the Commonwealth of Massachusetts for the Trash Compactor Replacement procurement opportunity. The addendum modifies or clarifies the original solicitation terms for qualified vendors seeking to provide trash compactor replacement services. The original solicitation was posted on January 26, 2026, with proposals originally due on February 17, 2026. The specific details regarding products, project scope, quantities, site visits, or bidders' conferences are not detailed within this addendum document alone and would be contained in the primary solicitation materials. Any revisions to response dates, contract terms, or project specifications introduced by this addendum should be reviewed in conjunction with the original Request for Proposals to ensure compliance with all current requirements.
Without access to the specific contents of the addendum, pricing structures, set-aside designations, incumbent vendor information, funding sources, and other salient contractual modifications cannot be definitively identified. Interested bidders must review this addendum in full coordination with all original solicitation documents to understand any amendments to evaluation criteria, technical specifications, budget allocations, eligibility requirements, or other material terms governing this procurement. Any disadvantaged business enterprise (DBE) requirements, minority or women-owned business preferences, and contract duration details would be clarified within the complete procurement package.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF MASSACHUSETTS
Town of Southwick Department of Public Works
661 COLLEGE HIGHWAY, SOUTHWICK, MA 01077
Telephone (413) 569-5995 · Fax (413) 569-5001 www.southwickma.org
ADDENDUM NO. 1
to
Southwick “TRASH COMPACTOR REPLACEMENT” Bid
Addendum Issue Date: February 12, 2026
Bidders are informed that the Bid Documents above-mentioned project are modified, corrected, and/or supplemented as follows. Addendum No. 1 becomes part of the Bid Documents and Contract Documents.
Bidders are instructed to acknowledge receipt of this Addendum by inserting its number on the Addenda Received line on Page 8 of the bid instructions. In addition, Bidders are encouraged to acknowledge receipt of this Addendum by completing the section below and sending a scan or photograph back to Southwick Public Works via email at jbetti@southwickma.gov.
Failure to acknowledge receipt of this Addendum may subject a Bidder to disqualification.
This Addendum is Acknowledged by:
Company Name: _____________________________________________
Contact Name: _____________________________________________
Signature: _____________________________________________
Date: _____________________________________________
Response to Questions submitted during or after the February 3, 2026 site visit:
Q: Does the compactor’s hydraulic fluid reservoir need to be heated?
A: The hydraulic fluid reservoir shall be equipped with an adjustable thermostatically-controlled oil heater to assist compactor operation during cold months.
Q: Are controls required at the charge end of the compactor?
A: The assembly shall be equipped with a keyed control station mounted to the compactor that allows drivers to disable other (top level) controls, activate/deactivate the system, and actuate the compactor ram.
mailto:jbetti@southwickma.gov
Q: Portions of the existing trash chute and overhead platform and their anchor points appear to have deteriorated. Does the Town want us to cut out and replace deficient or deteriorated work?
A: As noted in the original bid instructions, Bidders shall carry the cost of any temporary supports necessary to ensure that the chute, platform, and remaining structure are secure during the entirety of this project. Conditions requiring ancillary work beyond the base bid securing and reattachment effort may be managed through the contract change order requests.
Q: The upper level handrails at the top of the chute appear to be lower than current OSHA regulations. Does the Town want us to replace them?
A: The base bid scope of this contract will exclude replacement of handrails at the upper level.
Q: How long is the project expected to last, and when must the work be completed?
A: The project is anticipated to take 7-10 days; work will be completed in the Spring of 2026.
Q: What kind of on-site assistance will the Town provide for this project?
A: As noted in the original bid instructions, the Town will provide limited assistance for unloading of delivered materials or equipment within the capacity of on-site Town machinery and only during regular transfer station hours. Deliveries must be accompanied by the successful bidder’s staff; Town personnel will not independently manage any deliveries.
Q: Do prevailing wages apply to the manufacturing of the compactor?
A: Prevailing wages do not apply to the manufacturing of components for this project.
** End of Addendum No. 1 **