02 Air Munition Specification.pdf
PDF 139 KB Posted
- Attached to
- TLX Line Solicitation Federal contract opportunity
- Solicitation number
- FA821322R3014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 05 CADPAD Item Marking Instructions.pdf | ||
| 01 Solicitation FA821322R3014.pdf | ||
| 09 CDRLS.pdf | ||
| 06 SOW Packaging.pdf | ||
| 03 REPSHIP.pdf | ||
| 11 SPI.pdf | ||
| 07 REWORK.pdf | ||
| 04 SOW Ammo Cards.pdf | ||
| 10 IHC.pdf | ||
| 08 Item Description.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRMUNITION SPECIFICATION
FD2020-22-50027 (FMS)
FD2020-22-51217 (USAF)
FD2020-23-50007 (FMS)
CFISB TLX LINES (UTAS)
NSN: 1377-01-658-5348ES (JN43)
1377-01-658-5349ES (JN44)
1377-01-658-5367ES (JN45)
1377-01-658-5376ES (JN46)
1377-01-658-5379ES (JN47)
1377-01-658-5381ES (JN48)
1377-01-658-5384ES (JN50)
1377-01-658-5387ES (JN49)
1377-01-658-5389ES (JN51)
1377-01-658-5392ES (JN52)
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.
2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to :
AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.
3. Department of Defense Identification Code (DODIC) See list above.
4. One copy of all shipping documents shall be furnished to 429 SCMS/GUMAB, by mail to:
6038 Aspen Ave, Hill AFB, UT 84056-5805 or FAX to; (801) 777-5545, or Email:
hill.outgoing.mipr@us.af.mil and shall identify requisition number, MIPR number and line item. (MIPRS ONLY)
5. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block.
CDRL (DI-MISC-80043B) – A001
6. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1 May 2019, reference attachment.
7. Shelf Life Code marking NOT required per MIL-STD-129R.
8. Hazard Classification Information:
1377-01-658-5348ES (JN43) P/N: 7009200-01
Hazard Class/Division: 1.4 Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00073 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
1377-01-658-5349ES (JN44) P/N: 7009200-02
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00075 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to
1377-01-658-5367ES (JN45) P/N: 7009200-03
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00080 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to
1377-01-658-5376ES (JN46) P/N: 7009300-10
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00047 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to
1377-01-658-5379ES (JN47) P/N: 7009300-11
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00053 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to
1377-01-658-5381ES (JN48) P/N: 7009300-12
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.0005 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS
1377-01-658-5384ES (JN50) P/N: 7009300-13
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00038 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to
1377-01-658-5387ES (JN49) P/N: 7009300-14
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00051 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to
1377-01-658-5389ES (JN51) P/N: 7009300-15
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00057 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS
1377-01-658-5392ES (JN52) P/N: 7009300-16
Storage Compatibility Group: S DOT Label: Explosives 1.4S UN Serial No.: 0367 UN Proper Shipping Name: FUZES, DETONATING Net Explosive Weight (NEW): 0.00049 NEW Unit of Measurement: pounds
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to
9. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For
Variances (formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.
Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:
GOVERNMENT ENGINEER: Lawrence Kramer (lawrence.kramer.1@us.af.mil)
ECPs – CDRL (DI-SESS-80639E) – A002 NORs – CDRL (DI-SESS-80642E) – A003
RFVS – CDRL (DI-SESS-80640E) – A004
Distribution Statement B, Reason: Administrative or Operational Use.
10. Item(s) must pass both gross and fine leak checks. MIL-STD-883K, Method 1014.15 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.
CDRL (DI-QCIC-80553A) – A005
11. Lot Acceptance Test Requirements are: IAW latest Gov’t approved ATP.
Contractor
12. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF
CDRL: (DI-NDTI-80809B) – A006
13. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the
PCO/ACO and Air Force Engineering Organization within 1 business day Air Force Engineering Organization: AFLCMC/EBHJ Organization Fax/E-mail: (801) 777-4135 / lawrence.kramer.1@us.af.mil
14. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required.
CDRL: (DI-SESS-80255B) – A007
15. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.
16. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).
17. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.
Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
18. Percussion primers shall have been certified /recertified by performing sensitivity (all- fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item.
All primers shall be X-rayed in top and side views for critical defects prior to use.
19. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.
MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:
See attached QALI
20. Approval from government engineer is required prior to rework and repair of nonconforming material (See Attachment #5).
21. Contracts involving ammunition and explosives (AE) will contain:
-DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives -DFARS Title 48 Part 252.223-7003, Change in Place of Performance – Ammunition and Explosives
Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
-AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments.
File details come from the government source that posted it. Updated .