02_26-1692-KS Division 01 General Requirement Specification.pdf

PDF 768 KB Posted

Attached to
2026 Capital Improvement, 103rd Ave. SE AC Water Main Replacement Project
Solicitation number
26-1692-KS
Issued by
Snohomish County, Washington

About this file

This is a Division 01 General Requirements Specification document issued by Snohomish County Public Utility District (PUD) No. 1 for ITB No. 26-1692-KS, a capital improvement project involving water main replacement in Snohomish County, Washington. The project scope includes installation of approximately 8,715 linear feet of eight-inch ductile iron water main with associated fittings, 128 water services, 15 new fire hydrant assemblies and appurtenances, 2 blow-off assemblies, 4 combination air/vacuum release assemblies, and a PRV vault. The work encompasses asphalt trench patching, asphalt restoration overlay, private asphalt and gravel driveway removal and restoration, erosion control measures, and landscape and surface restoration across five streets near Lake Stevens: 101st Ave. SE, 103rd Ave. SE, 37th St. SE, 40th Pl. SE, and 46th Pl. SE. The project must be completed within 70 calendar days from the Notice to Proceed, contingent upon all required federal, state, county, and local permits being obtained by the District and the contractor's Stormwater Pollution Prevention Plan and Traffic Control Plan being approved by Snohomish County. The contractor is responsible for obtaining all traffic control permits, lane closure permits, road closure permits, and other required permits at its sole expense.

The specification establishes 35 bid items with quantities and unit prices to be submitted by bidders, including items for excavation safety systems, ductile iron pipe of various sizes, water services, valve assemblies, fire hydrant assemblies, restoration materials, and specialized services. The District maintains the sole discretion to determine pay items and quantities, with actual quantities potentially varying from estimates shown in the contract documents. Key requirements include contractor responsibility for all utility location and exposure, dewatering operations, erosion and sediment control compliance with Washington State Department of Ecology standards, petroleum-contaminated soil testing and removal protocols, and asbestos-cement pipe disposal in accordance with Puget Sound Clean Air Agency regulations. The contractor must establish a Site Safety Plan, maintain repair materials on-site, provide a certified Erosion Sediment Control Lead inspector, coordinate with the District's Geotechnical consultant for compaction testing, and comply with OSHA/WISHA safety requirements and all applicable local, state, and federal environmental regulations. The project engineer is Andrew Sics, P.E., and the construction inspector is Zach McKinney; the contractor shall coordinate with District staff and the Geotechnical representative throughout construction.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SNOHOMISH COUNTY PUD NO. 1

ITB NO. 26-1692-KS

PWC–2026 Capital Improvement 103rd Ave. SE AC Water Main Replacement Project

DIVISION 01 – GENERAL REQUIREMENT SPECIFICATION

Snohomish County PUD No. 1; Water Utility

Public Utility District No. 1 of Snohomish County Everett, WA 98201

ITB No. 26-1692-KS Specification

TABLE OF CONTENTS

1.0 GENERAL

1.1 Description of Work

1.2 Time for Completion

1.3 Project Leader

1.4 Standard Specification

1.5 Reference Specification

1.6 Existing Utilities or Obstructions

1.7 Laws and Safety Regulations

1.8 Approved Equal

1.9 Access

1.10 Alignment

1.11 Construction Permit Requirements

1.12 Salvage of Material

1.13 Overtime Work by DISTRICT Employees and/or Agents

1.14 Trench Safety

1.15 Minimum Qualifications of the Successful Bidder

2.0 MOVE-IN AND SITE PREPARATION

2.1 General

2.2 Disposal of Waste Material

3.0 WATER SYSTEM MATERIALS AND INSTALLATION

3.1 General

3.1.1 General Notes

3.1.2 Permits

3.1.3 Project Acceptance and Inspection

3.2 Earthwork

3.2.1 Clearing, Grubbing and Grading

3.2.2 Construction Stormwater and Pollution Control

3.3 Excavation

3.3.1 General

3.3.2 Dewatering of Excavation Areas

3.3.3 Trench Excavation

3.3.4 Petroleum Contaminated Soils Removal and Disposal

3.3.5 Disposal of Asbestos Material

3.4 Rock/Concrete Excavation

3.4.1 Definition

3.4.2 Exploratory Excavation

3.4.3 Excavating

3.5 Trench Preparation and Bedding

3.5.1 Bedding Material

3.5.2 De-Watering

3.6 Backfill Material

3.6.1 General

3.7 Backfilling of Excavated Areas

3.8 Compaction

3.8.1 General

3.8.2 Compaction of Excavation

Everett, WA 98201

ITB No. 26-1692-KS Specification

3.9 Restoration

3.9.1 General

3.9.2 Asphalt

3.9.3 Crushed Surfacing

3.9.4 Controlled Density Fill (CDF)

3.9.5 Existing Structures

3.9.6 Culverts and Ditches

3.9.7 Facility Repairs

3.9.8 Dust and Mud Control

3.10 Water System Materials and Installation – General

3.10.1 Water Piping Materials

3.10.2 Installation

3.10.3 Pipe Fittings – General

3.10.4 Concrete Blocking

3.10.5 Connection to Existing Piping

3.11 Water System Appurtenances

3.11.1 Water System Assemblies

3.11.2 Material Specifications

3.11.3 Pipe Fittings Materials

3.11.4 Resilient Seated Gate Valves

3.11.5 Butterfly Valves

3.11.6 Valve Boxes, Marker Posts and Asphalt Protection Pad

3.11.7 Fire Hydrant Assemblies

3.11.8 Blow-Off Assemblies

3.12 Pipe Material Installation

3.12.1 Trench Depth

3.12.2 Size

3.12.3 Installation of Valves, Valve Boxes, and Asphalt Protection Pads

3.12.4 Installation of Valve Marker Posts

3.12.5 HDPE Fusion

3.13 Water Services

3.13.1 Existing Service Replacement with New Water Service

3.14 Horizontal Directional Drilling

3.14.1 Summary

3.14.2 Reference Specifications, Codes, and Standards

3.14.3 Submittals

3.14.4 Quality Assurance

3.14.5 Definitions

3.14.6 Design Criteria

3.14.7 Materials

3.14.8 Execution

4.0 WATER QUALITY AND HYDROSTATIC/LEAKAGE TESTING

4.1 General

4.2 Flushing of Water Mains and Disposal of Chlorinated/Turbid Water

4.3 Hydrostatic Pressure Test

4.4 Leakage Tests

4.5 Sterilization and Bacteriological Purity Test

Everett, WA 98201

ITB No. 26-1692-KS Specification

5.0 MEASUREMENT AND PAYMENT

Bid Item #1 Temporary Erosion and Sediment Control Bid Item #2 Trench Excavation Safety Systems Bid Item #3 6” Class 52 Ductile Iron (D.I.) Pipe Bid Item #4 8” Class 52 Ductile Iron (D.I.) Pipe Bid Item #5 Single Long Water Service (By Underground Piercing Tool) Bid Item #6 Single Short Water Service (By Underground Piercing Tool) Bid Item #7 6" D.I. Resilient Seat Gate Valve Assembly Bid Item #8 8" D.I. Resilient Seat Gate Valve Assembly Bid Item #9 8” x 8" D.I. Tee (FL x FL) Bid Item #10 8” x 6" D.I. Tee (FL x FL) Bid Item #11 New Fire Hydrant Assembly Bid Item #12 1" Combination Air/Vacuum Release Assembly Bid Item #13 Culvert Installation if Required 8"-15" (If Required) Bid Item #14 Flagger (Traffic Control) Required Bid $25/HR Bid Item #15 Crushed Rock - 5/8” Minus CSTC/CSBC Bid Item #16 Asphalt Saw Cutting (To All Depths) Bid Item #17 HMA CL 1/2" PG 64-22 Trench Patch Bid Item #18 HMA CL 1/2" PG 64-22 Overlay Bid Item #19 Straw Mulch and Hand Seeding Bid Item #20 Sod Restoration Bid Item #21 Removal of Unstable Base Material (If Required) Bid Item #22 Foundation Material Class A (If Required) Bid Item #23 Additional 8" Ductile Iron Bend (If Required) Bid Item #24 Rock/Concrete Excavation (If Required) Minimum Bid $100/CY Bid Item #25 Petroleum Contaminated Soils Removal and Disposal (If Required)

Minimum Bid $50/Ton Bid Item #26 CDF/Bentonite Trench Dam(s) (If Required) Bid Item #27 Single Long Water Service by Authorized

Open Cutting (If Required & Permitted by The District)

Bid Item #28 Control Density Fill (CDF) Bid Item #29 2” Blow-off Assembly Bid Item #30 6”-8” Pressure Reducing Valve Assembly Bid Item #31 Curb & Gutter Bid Item #32 Concrete Sidewalk Bid Item #33 6” PVC Storm Pipe Bid Item #34 Type I Catch Basin Bid Item #35 Apprenticeship Utilization Requirements (AUR)

Everett, WA 98201

ITB No. 26-1692-KS Specification

PROJECT COORDINATION

6.0 Contract Changes

APPENDIX

Request for Information (RFI) Water Resources Engineering Change Directive (ECD) Water Resources Proposal Request (PR) Water Resources Change Order Proposal (COP) Water Resources

DRAWINGS

WE-1022

Sheet 1 Cover Sheet Sheet 2 Legend, Abbreviations, Symbols and Notes Sheet 3 TESC Notes and Details Sheet 4 Sheet Layout Sheet 5 46th Pl SE – Water Plan 1 – Sta 0+00 to Sta 4+00 Sheet 6 46th Pl SE – Water Plan 2 – Sta 4+00 to Sta 8+00 Sheet 7 46th Pl SE – Water Plan 3 – Sta 8+00 to Sta 12+00 Sheet 8 40th Pl SE – Water Plan 1 – Sta 0+00 to Sta 7+00 Sheet 9 103rd Ave SE – Water Plan 1 – Sta 0+00 to Sta 7+50 Sheet 10 103rd Ave SE – Water Plan 2 – Sta 7+50 to Sta 15+00 Sheet 11 103rd Ave SE – Water Plan 3 – Sta 15+00 to Sta 22+60 Sheet 12 103rd Ave SE – Water Plan 4 – Sta 22+60 to Sta 28+00 Sheet 13 38th Pl SE – Water Plan 1 – Sta 0+00 to Sta 7+35 Sheet 14 38th Pl SE – Water Plan 2 – Sta 7+35 to Sta 13+80 Sheet 15 38th Pl SE – Water Plan 3 – Sta 13+80 to Sta 17+50 Sheet 16 101st Ave SE – Water Plan 1 – Sta 0+00 to Sta 6+50 Sheet 17 101st Ave SE – Water Plan 2 – Sta 6+50 to Sta 8+25 Sheet 18 37th St SE – Water Plan 1 – Sta 9+80 to Sta 17+50 Sheet 19 37th St SE – Water Plan 2 – Sta 17+50 to Sta 23+25

Everett, WA 98201

ITB No. 26-1692-KS Specification

Section 01 00 00

1.0 GENERAL

1.1 DESCRIPTION OF WORK

The CONTRACTOR shall furnish all labor, equipment, tools, goods, materials, and incidentals necessary to install the following items and other water system appurtenances as specified herein and as shown on the Contract Plans. This Contract is the PWC – CAPITAL IMPROVEMENT, 103RD AVE. SE AC WATER MAIN

REPLACEMENT PROJECT.

NOTE: The Contractor shall not commence any physical on-site work for this project until the Notice to Proceed has been issued and all required federal, state, county and local permits have been obtained by the District and the Contractor.

After commencing work, it is understood that all work shall be performed to Snohomish County PUD No. 1, Water Utility Standards and Specifications for Design and Construction latest edition as published on the DISTRICT’s website:

Standards Specs Water Resources (snopud.com) or https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf ,except as modified in the project permitting, herein or on the Contract Plans.

The Work for this project includes but is not limited to: Installation of approximately 8,715 linear feet of eight-inch ductile iron water main and associated fittings, 128 water services, 15 new fire hydrant assemblies and appurtenances, 2 blow-off assemblies, 4 combination air vacuum release assemblies and a PRV Vault. The project also includes installation of asphalt trench patching, asphalt restoration overlay, private asphalt, gravel driveway removal and restoration, erosion control, and landscape/surface restoration. The location of the work is on 101st Ave. SE, 103rd Ave. SE, 37th St. SE, 40th Pl. SE and 46th Pl. SE, near the City of Lake Stevens, in Snohomish County, Washington. The primary purpose of the proposed project is to install new water system infrastructure. Physical work shall not commence until all required federal, state, county and local project permitting is issued to the District as identified in the project specifications.

The project is located in the following Section, Township and Range as detailed on the following DISTRICT drawings:

• NW 1/4 Sec. 31, Township 29N, Range 06E W.M.

Work Order No. 100159052-0010 Contract Drawings: PWC – 2026 CAPITAL IMPROVEMENT 103RD AVENUE SE

AC WATER MAIN REPLACEMENT PROJECT

https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf

Everett, WA 98201

ITB No. 26-1692-KS Specification

A. BID ITEM WORK:

a. Install all water main as detailed on the Contract Plans;

b. Potentially contaminated sites that may contain petroleum contaminated soils may be encountered in proximity of the water main installation. If the CONTRACTOR when beginning excavation in the vicinity of said site encounters any such conditions as described in Section 3.3.4 (PETROLEUM CONTAMINATED SOILS REMOVAL AND DISPOSAL), the CONTRACTOR shall immediately contact DISTRICT Staff and adhere to all provisions as set forth in Section 3.3.4 below.

CDF/Bentonite Trench Dam(s) (Bid Item No. 26) may be required for installation.

Such check dam and drainage shall be installed (if required) as field located by PUD staff. Additional CDF/Bentonite Trench Dam(s) may be required depending on water drainage conditions found during excavation. If required a two-foot-wide crushed rock filled ditch with 6” corrugated perforated drain pipe shall be installed as field located to provide suitable drainage. If required, the material excavated will be transported to a suitable disposal site as described below in Section 3.3.4;

c. For purposes of this Contract ALL trench materials excavated within the paved roadway will be hauled off and replaced with 100% 5/8” minus crushed rock backfill. The DISTRICT’s Geotechnical representative will ensure compaction meets the standard Engineering Design and Development Standards (EDDS) as prescribed by Snohomish County;

d. Those areas of excavation within the vegetative or gravel shoulder may use native backfill material given the approval of the DISTRICT’s Geotechnical representative including meeting the standard requirements of a 95% modified proctor density test. However, if weather conditions dictate, then 100% 5/8” minus crushed rock backfill shall be required for roadway shoulder excavation. The bid item for 5/8” minus crushed rock (Bid Item 15) reflects the potential for additional quantity to be used for such purposes. All road crossing and road asphalt cuts outside of the travel lane (i.e., asphalt road shoulder) shall be restored with an asphalt patch utilizing a “T-Cut” as detailed in the Standard Detail 801 and Section 3.9.2.2 of this Specification. All longitudinal trenches in the travel lane shall be restored via grinding and half-width overlay (unless otherwise specified on the Contract Plans);

e. Sod restoration is required for restoration for trenching across any lawn disturbed;

f. Control density fill (CDF) backfill shall be required for purposes of cross connection prevention in the case that the water main alignment is in proximity of sewer. The CONTRACTOR may also be directed to backfill areas surrounding utility crossings where sufficient separation cannot be achieved. Snohomish County requires that all existing water main to be abandoned in the Snohomish County right-of-way shall be cut, capped and filled with CDF after the new water main is placed in service. For purposes of utility identification, the CDF (in flowable form) shall be colored blue prior to installation. The quantities shown in the Contract documents reflect the potential for utilizing additional CDF for this purpose in addition to potential use in areas of contaminated soils;

Everett, WA 98201

ITB No. 26-1692-KS Specification

g. The CONTRACTOR shall become familiar with the project site. Specifically, the project site contains utility conflicts including existing utility structures (including, but not limited to, underground communication lines, natural gas and power shall require exploratory excavation to determine if deflection both laterally and vertically are required to place the new ductile iron water main. Furthermore, there may also be conflict with existing storm drainage infrastructure that may require installation of additional bends not shown on the Contract Plans. Field adjustment by installation of additional bends and subsequent water main alignment may be required as directed by DISTRICT Staff. The cost for such deflection of the water main as identified on the Contract Plans is a portion of the cost of installing the new water main (see Section 5.0 – Measurement and Payment, Bid Items 3 and 4). Please see Bid Item No. 23 in Section 5 for those main installation conflicts not identified on the Contract Plans requiring additional bends. All bends identified on the Contract Plans (by symbol or by call out, not necessarily both) are considered incidental to the Contract. Those installed to avoid structures or for purposes of alignment not shown on the Plans shall be paid for per the Contract Bid Item shown for additional bends on the Bid Form;

h. Install each fire hydrant assembly per Standard Details 201 and 203 as specified on the Contract Plans. Fire hydrants installed in areas of a cut or fill will require installation per Standard Detail 202 that may not explicitly be called out on the face of the Plans. Please see Measurement and Payment Section for installation of a fire hydrant assembly;

i. Furnishing and installing valves, fittings, water services, air/vacuum assemblies, and other appurtenances shall be as shown on the Contract Plans and in the Standard Details;

j. Saw-cut existing roadways including asphalt driveways. Please note that existing concrete panels have been encountered in Snohomish County. Some rock/concrete excavation (as defined herein) may be required (and paid for as defined herein) in conjunction with any existing concrete panel roadway. Typically, concrete panel roadways within the Snohomish County have 4”-8” of asphalt under laid by approximately 6”-8” thick concrete panels. No payment for extra depth of saw-cutting shall be paid;

k. Restore concrete and asphalt driveways to pre-existing conditions;

l. Installation of erosion control measures as required by weather and drainage conditions including, but not limited to, furnishing and installing silt fence, inlet protection, jute matting and straw wattles in disturbed ditch lines and slopes, furnishing and installing Bentonite or Control Density Fill (CDF) check dams, furnishing or installing rock check dams transversely in the trench line approximately every 600 feet or as required by drainage and ditch slope conditions, furnishing and installing silt fencing, hand seeding and application of straw mulch, hydroseeding and other anti-siltation measures as required. The CONTRACTOR shall take care not to disturb erosion control measures once installed and if necessary, install additional measures when required by responsible regulatory authorities.

Everett, WA 98201

ITB No. 26-1692-KS Specification

B. INCIDENTAL WORK:

The following items are considered incidental to the bid items and shall be included in the respective unit or lump sum prices of the Contract. No additional payment shall be made for the following incidental items:

a. Joints: All joints, including but not limited to temporary dead ends, bends, tees, crosses, etc., and those required to be one hundred percent (100%) restrained joint by use of mega-lugs, field-lok gaskets or approved equal restraint shall be incidental to the bid items for pipe.

b. Traffic Control Plan (TCP): The TCP for this project shall be obtained by the

CONTRACTOR at the CONTRACTOR’s sole expense from Snohomish County.

The CONTRACTOR shall be responsible for understanding and implementing the approved TCP including all lane closures and traffic control needed to complete the project. The DISTRICT will obtain the Right-of-Way permit from Snohomish County. The Contractor shall also be responsible for providing, installing, and demobilizing all signs and traffic control devices as identified in the approved TCP.

c. Stormwater Pollution Prevention Plan (SWPPP) and Erosion and Sedimentation

Control Plan (ESCP): The CONTRACTOR shall submit to the DISTRICT a completed SWPPP and ESCP for review and approval prior to commencing work.

The SWPPP and ESCP shall be incidental to Bid Item No. 1 Temporary Erosion and Sediment Control.

d. Water Service Connection: The CONTRACTOR shall connect each Customer’s water service line with one-inch (1”) diameter copper unless otherwise specified on the Contract Plans. Each water service connection shall include but not be limited to installing tail-piece runs of varying lengths up to thirty-feet (30’) and providing and installing a new meter box per District Standard Detail #101. Connections to customer water service lines that are in excess of one-inch (1”) diameter shall require installation of one- and one-half inch (1.5”) diameter two hundred pounds per square inch (200 psi) rated high density polyethylene (HDPE) pipe. Water service connections shall also include the installation of new District supplied meters and PRV assemblies as needed and directed by the District. All labor, materials, tools and equipment for copper and HDPE tail-pieces, transition fittings and new meter boxes shall be incidental to installing water services.

e. Asbestos Cement Water Mains: Removal, disposal and abandonment of existing asbestos cement (AC) water mains shall be incidental to the bid items for pipe.

This shall include but not be limited to removal, disposal and abandonment by the CONTRACTOR of all existing pipe, valve boxes, hydrants, air/vacuum assemblies, blow offs, curb stops, meter boxes, service lines and all other appurtenances associated with the existing AC or other water mains that shall be abandoned after the newly installed water main is in service. All abandoned AC water main shall be capped with an appropriate fitting as directed by the PUD’s Water Construction Inspector. This also includes installation of appropriate size AC to DI transition fitting and DI cap. Reference Section 3.3.5 Disposal of Asbestos Material for additional AC water main parameters.

Everett, WA 98201

ITB No. 26-1692-KS Specification

f. Water Main Flushing: Flushing of water mains per Section 4.2 Flushing of Water Mains and Disposal of Chlorinated/Turbid Water, shall be incidental to the Contract and requires a water truck for disposal of all chlorinated water.

g. Asphalt Grinding: No additional payment for planing and disposal of all asphalt grinding material generated shall be made other than as provided for in Bid Items 16, 17 and 18. All existing structures including valves, utility vaults, sewer manholes, storm sewer grates, monuments etc. shall be maintained in original condition and location (vertically and horizontally) for purposes of roadway restoration and raised to the new asphalt grade. Asphalt grindings and/or recycled concrete shall not be allowed for pipe zone bedding or trench backfill.

h. Dewatering: Note that some dewatering may be required for this project. The

Contractor shall maintain excavations free of surface runoff and/or groundwater by any and all dewatering methods that provide a stable foundation for the pipe and appurtenances and enable proper construction of the pipe and appurtenances.

Groundwater shall be lowered a minimum of two-feet (2’) below the bottom of pipe trenches. The CONTRACTOR shall maintain temporary drains and drainage ditches, as required to intercept or control surface water that may affect the execution or condition of the work. Other specific dewatering methods to be utilized shall be determined by the CONTRACTOR. All dewatering for this project shall be incidental to the bid items for pipe.

i. Daily Restoration and Paving Requirements: The CONTRACTOR shall become familiar with daily restoration and paving requirements as specified in the latest edition of Snohomish County EDDS. The CONTRACTOR shall coordinate with the DISTRICT’S Geotechnical consultant, Zipper Geo Associates, LLC, to complete compaction-testing requirements. The CONTRACTOR shall become familiar with water main depth requirements, traffic control requirements, construction routes, and specified materials. Daily Restoration and Paving shall be incidental to the Contract and included in the bid items.

j. Project Flagging: A portion of the cost of flagging is incidental to the Contract.

There is an amount that shall be paid for at a pre-determined rate as specified in the Bid Item No. 14 for flagging in the Contract Documents.

k. Connection to Existing Water System: The CONTRACTOR shall connect to the existing water system as shown or described on the Contract Plans.

For each tie-in location shown on the Plans, the CONTRACTOR shall pothole each site a minimum of two (2) days in advance of planned shutdown. CONTRACTOR shall connect to the existing water system as shown on Contract Plans. Each tie-in location will require the CONTRACTOR to pothole a distance far enough away in the main installation process to ensure proper vertical and horizontal alignment will occur at the time of the shutdown and connection to the existing water system.

The two (2) -days in advance of tie-in requirement will also ensure that proper transition fittings are on hand for the day of the shut down and connection to the DISTRICT’s existing water system. The fittings as called out for connection to the existing water system on the Contract Plans are based on As-Built drawings. Such additional (or more likely different) fittings required shall be incidental to the cost of

Everett, WA 98201

ITB No. 26-1692-KS Specification the Contract. Securely plating of tie-in locations shall be required. Note that all joints within 60 feet (for 8” DI pipe) of the temporary blow off (required at each tie-in point) must be fully restrained. The cost of each tie-in and additional restraint shall be accounted for as a portion of the 8” Class 52 Ductile Iron (D.I.) Pipe bid item. All joints that are part of the tie-in shall be mechanically restrained. Likewise, the additional cost for restraining the 8” DI as shown on plans shall be accounted for as a portion of the 8” Class 52 Ductile Iron (D.I.) Pipe bid items as noted in sub-section a. above.

l. Utility Conflicts: In some areas, the new water main will be installed near several underground utilities that may result in conflict thereby slowing construction progress. It will be essential for the CONTRACTOR to expose all conflicting underground utilities, including the existing water main, to determine a suitable location in the roadway or roadway shoulder for the new water main. All additional time required for exposing the existing utilities to determine the exact field alignment for the new water mains shall be incidental to Bid Items 3 and 4.

m. Driveway Culvert Conflicts: Potential conflicts with driveway culverts may exist for this project. All driveways with culvert crossings including those that require excavation and relocation shall be replaced in-kind per the Snohomish County EDDS. All excavation, relocation of existing driveway culverts shall be incidental to the Contract. All culverts damaged during excavation and relocation shall be replaced in-kind with new pipe meeting the governing jurisdiction’s EDDS at the CONTRACTOR’s sole cost.

n. Utility Poles: There may be utility poles that may require temporary support (working within five feet (5’) of the pole) during construction. The CONTRACTOR shall notify the DISTRICT for support of the pole (call Val Smith at 360-629-5712).

In general, cost for holding a utility pole is approximately $2,000 to $5,000 per pole depending on logistics. The CONTRACTOR shall note the additional cost incurred in the event that temporary support by DISTRICT crews is required. The CONTRACTOR shall bid accordingly in regard to the Bid Items 3 and 4 for 6-inch (6”) & 8-inch (8”) Class 52 D.I Pipe. DISTRICT staff requires a minimum of three

(3) weeks’ notice prior to dispatching a DISTRICT crew.

o. Existing Utilities and Facilities: It is the CONTRACTOR’s responsibility to locate and expose existing facilities as required to install the new water main, appurtenances, and water services in a suitable location. The location as shown on the Contract Plans is based upon the DISTRICT’s best available information.

Actual pipeline alignment may vary from the proposed alignment as shown on the Contract Plans depending on location of the existing utilities. All labor, materials, permits, tools, and equipment associated with locating, exposing, and re-locating existing utilities and facilities shall be incidental to the Contract.

p. Trench Depth: The CONTRACTOR shall note and comply with the required trench depth of the new water main (Standard Detail No. 801). No additional payment shall be made for trenching outside the parameters of Standard Detail No. 801.

q. Waste Disposal Sites: The CONTRACTOR shall provide approved suitable waste disposal sites for all waste materials including but not limited to all solid and liquid waste materials generated from the project per local, state, and Federal

Everett, WA 98201

ITB No. 26-1692-KS Specification requirements. Removal and disposal of materials to an approved suitable waste disposal site is incidental to the Contract.

r. Work Hours and Permit Requirements: The CONTRACTOR shall review and comply with all work hour restrictions or additional working conditions imposed by Snohomish County, or the DISTRICT. The CONTRACTOR shall comply with the conditions of the Right-of-Way permit and TCP/Road (or Lane) Closure permit.

s. Restoration and Cleanup: The CONTRACTOR shall restore to pre-construction conditions all fences, roads, road shoulders, ditches, driveway asphalt aprons, culverts, mailboxes, landscaping and any other items or property disturbed by the CONTRACTOR’s construction operations. All work associated with restoration and cleanup shall be incidental to the Contract.

t. Temporary Blow-Off Assemblies: The CONTRACTOR shall install temporary blow-off assemblies on approximately every 1,000 LF of newly installed mains per Standard Detail 1003A or 1003B to fill, flush and provide temporary water service to facilitate the transfer of services to the new main while maintaining service in existing main. Provisions shall be made by the CONTRACTOR to install a tapped two-inch (2”) cap or plug with a standpipe. If the temporary blow-off is located in the roadway the flush style temporary blow must be placed in drive-over traffic rated box. A DISTRICT installed site specific fill station is required for filling of all new mains. All costs associated with temporary blow off assemblies shall be incidental to the Contract.

u. On-Site Repair Materials: The CONTRACTOR shall maintain on-site an adequate supply of repair materials of sizes and types necessary to repair buried utilities damaged during the course of the project at all times. All costs associated with on-site repair materials shall be incidental to the Contract.

1.2 TIME FOR COMPLETION

The CONTRACTOR shall complete all work specified herein in and as shown on the Contract Plans per the Snohomish County PUD No. 1, Water Resources Standards and Specifications for Design and Construction for required materials and installation (hereafter referred to as “District Standards and Specifications” (available at Standards Specs Water Resources (snopud.com) or https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf , Appendix A). within Seventy (70) calendar days of the Notice to Proceed.

NOTE: The Contractor shall not commence any physical on-site work for this project until written notification from the District that all required federal, state, county and local permits have been obtained by the District.

Additionally, construction shall not commence until the Contractor’s Stormwater Pollution Prevention Plan (SWPPP) and Snohomish County Traffic Control Plan (TCP) are approved by Snohomish County and the submitted to the District.

BIDDERS may be requested to furnish evidence of ability to perform the Contract within the scheduled time limits by the submission of a list of personnel and equipment which will be available to complete all work described in this Specification. Such information may be requested by the DISTRICT after the bid opening as part of the bid evaluation. BIDDERS https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf

Everett, WA 98201

ITB No. 26-1692-KS Specification may be asked to inform the DISTRICT of other jobs that they have scheduled for the term of this Contract.

1.3 PROJECT ENGINEER and CONSTRUCTION INSPECTOR

The DISTRICT’s Project Leader for this Contract shall be:

Project Engineer: Andrew Sics, P.E.

Title: Professional Engineer, Water Utility Address: P.O. Box 1107, Everett, WA 98206 Phone: 425-397-3032 or Cell Phone: 425-550-3173 Fax: 425-267-6608 Email: amsics@SNOPUD.com

The DISTRICT’s Construction Inspectors for this Contract shall be:

District Staff Inspector: Zach McKinney Title: Construction Inspector, Water Utility Address: P.O. Box 1107, Everett, WA 98206 Phone: Cell Phone: 425-397-3050 Fax: 425-267-6608 Email: ZSMcKinney@SNOPUD.com

1.4 STANDARD SPECIFICATION

Work under this Contract shall be performed in accordance with the applicable provisions of the latest edition of the “Standard Specifications for Road, Bridge and Municipal Construction”, prepared by the Washington State Department of Transportation and the American Public Works Association, Washington State Chapter, hereinafter referred to as the “APWA Standard Specifications”, unless otherwise specified herein or on the Contract Plans or District Standards and Specifications.

All provisions of the APWA Standard Specifications relating to and providing for the method of measurement and payment for work performed are considered deleted and void for the purposes of this Contract. The Measurement and Payment Section set forth herein shall be the basis for payment for all work performed under this Contract. The quantities specified as part of the Contract Documents herein are estimates of the quantities of work that will be awarded under this Contract and are shown for comparing bids; actual quantities of work may vary from the quantities specified herein. No claim may be made against the DISTRICT for any excess or deficiency of such quantities specified. The DISTRICT may authorize payment for quantities beyond those set forth herein, but only if the DISTRICT has agreed in writing to increase such estimated quantities.

Work under this Contract related to construction, materials, and workmanship shall conform to the latest edition of the American Water Works Association (AWWA) Standards, the International Building Code (IBC) and any other applicable rules and regulations.

1.5 REFERENCE SPECIFICATION

Certain referenced sections to the following publications as used in this Specification are from the latest editions of:

mailto:amsics@SNOPUD.com mailto:ZSMcKinney@SNOPUD.com

Everett, WA 98201

ITB No. 26-1692-KS Specification

A. DISTRICT Standards Snohomish County PUD No. 1, Water Utility Standards and Specifications for Design and Construction

B. AWWA American Water Works Association C. ANSI American National Standards Institute D. ASA American Standards Association E. ASTM American Society for Testing and Materials F. NESC National Electric Safety Code G. UBC Uniform Building Code H. EDDS Snohomish County Engineering Design and

Development Standards (EDDS) I. WSDOT WSDOT Standard Specifications for Road, Bridge, Municipal Construction

1.6 EXISTING UTILITIES OR OBSTRUCTIONS

CONTRACTOR is responsible for becoming informed of the specific location of all utilities and obstructions as specified in the Contract General Conditions. The CONTRACTOR at the CONTRACTOR’s own expense and to the satisfaction of the DISTRICT, shall cross over or under any existing utility conflicts as required. If, in the execution of the work, it becomes necessary to interrupt existing private water services, surface drainage, under drains, conduit, utilities, or similar underground structures, or parts thereof, the CONTRACTOR shall be responsible for and shall take all necessary precautions to protect and provide temporary services for same. The CONTRACTOR shall, at CONTRACTOR’s own expense and to the satisfaction of the DISTRICT, repair all damage to such facilities or structures due to CONTRACTOR’s construction operations.

1.7 LAWS AND SAFETY REGULATIONS

All work and utilization of equipment and materials shall meet all requirements of the Occupational Safety and Health Act and the Washington Industrial Safety and Health Act (OSHA/WISHA), requirements of the Environmental Protection Agency (EPA), applicable requirements of the Puget Sound Clean Air Agency, and any other applicable laws and regulations. All vehicles utilized shall be equipped and marked in accordance with the rules and regulations of the Washington State Highway Department, and all CONTRACTOR personnel shall be trained and qualified as may be required by the State of Washington.

The CONTRACTOR shall provide and install timbering and sheeting in accordance with OSHA/WISHA regulations and as necessary to protect workmen, the work area, and existing utilities, structures, and other affected properties.

1.8 APPROVED EQUAL

If the BIDDER elects to bid equipment, goods or materials other than those specified herein, the BIDDER shall submit with its bid complete data intended to show that such alternative equipment, goods or materials are of a quality equal to or better than those specified or have the characteristics required for their intended use. Failure to submit such data, at the option of the DISTRICT, will render the BIDDER’s Bid nonresponsive and ineligible for consideration. Within five (5) working days after any request from the DISTRICT, the Bidder shall furnish to the DISTRICT any such additional information relating to such alternative equipment, goods or materials as the DISTRICT may require.

Everett, WA 98201

ITB No. 26-1692-KS Specification

In the event that the equivalency of the proposed alternative equipment or materials is not readily ascertainable from the information supplied by the BIDDER, the DISTRICT may, at the BIDDER’s sole cost and expense, test or have tested, by any means which the DISTRICT deems appropriate, the proposed alternative equipment, goods or materials in order to determine the adequacy thereof.

The term “approved equal” means that the quality, certification, construction, and characteristics of the equipment, goods or materials proposed to be supplied as an alternative to those named herein are equal to the quality, certifications, and characteristics of the equipment, goods or materials named herein, and that the use of such equipment, goods and materials has received the prior written approval of the DISTRICT. The DISTRICT shall be the sole arbiter in the determination of equality of any equipment, goods, or materials.

1.9 ACCESS

Access to the work site is via 101st Ave. SE, 103rd Ave. SE, 37th St. SE, 40th Pl. SE and 46th Pl. SE. Please see the Contract Plans for a Vicinity Map. Finding appropriate staging areas is the sole responsibility of the CONTRACTOR.

1.10 ALIGNMENT

The location of the proposed water main, valves, and fittings, including modifications, will be staked by the DISTRICT when requested by the CONTRACTOR. Modifications in alignment that require additional bends not shown on the Contract Plans are the impetus for additional ductile iron bend bid items. Locations of hydrants, water services, air/vacuum assemblies, and other appurtenances shown on the Contract Plans may be field adjusted if needed as approved by the Engineer or Construction Inspector. These field adjustments are considered incidental to the Contract.

1.11 CONSTRUCTION PERMIT REQUIREMENTS

The DISTRICT shall obtain the Right-of-Way permit for the project from both Snohomish County and the City of Lake Stevens. It is the CONTRACTOR’s sole responsibility to obtain the Traffic Control, Lane Closure permit or Road Closure permit from both Snohomish County and the City of Lake Stevens and all other permits required for completion of the work at the Contractor’s sole expense. The Contractor shall submit Copies of the Contractor obtained permits to the District prior to construction. Copies of the permits will be available at the DISTRICT Water Utility office located in the Lake Stevens Water Operations Facility, 3301 Old Hartford Road, Lake Stevens, WA. Copies may also be delivered in electronic PDF format to amsics@snopud.com. All work must be in conformance with the requirements of the permits. It is the responsibility of the CONTRACTOR to become familiar with all permit conditions.

1.12 SALVAGE OF MATERIAL

The DISTRICT maintains first-right-of-refusal for water main material removed by the CONTRACTOR for salvage and other salvageable items. Water main material removed by the CONTRACTOR for salvage and other salvageable items shall remain the property of the DISTRICT, and shall be carefully removed, salvaged, and stockpiled by the CONTRACTOR within the construction area. Salvaged materials unwanted by the DISTRICT shall be removed and disposed of by the CONTRACTOR. All associated removal and disposal costs are incidental to the Contract. This section shall not apply to asbestos-cement pipe and materials (see Section 3.3.5.).

mailto:amsics@snopud.com

Everett, WA 98201

ITB No. 26-1692-KS Specification

1.13 OVERTIME WORK BY DISTRICT EMPLOYEES AND/OR AGENTS

In the event the CONTRACTOR elects to work on a Saturday or Sunday, Holiday, or longer than an eight (8)-hour work shift on a regular working day, such work shall be considered as overtime work. For all such overtime work, a DISTRICT employee or agent must be present at the work site. The CONTRACTOR shall reimburse the DISTRICT for overtime work by DISTRICT employees at the rate of two (2) times the employee's hourly wage rate, plus benefits, times the number of hours worked. The CONTRACTOR shall reimburse the DISTRICT for all costs billed the DISTRICT for overtime work by the DISTRICT, employees and agents under this Contract. DISTRICT employee overtime costs resulting from special construction conditions, such as concrete finishing, asphalt rolling, minimizing water shut-off time, etc., may be waived by the DISTRICT if the DISTRICT, in its sole judgment, considers such overtime work to be primarily for the DISTRICT’s own benefit or in the DISTRICT’s best interest.

1.14 TRENCH SAFETY

The CONTRACTOR’s attention is called to recent changes to RCW Chapter 39.04.180 regarding separate payment for trench safety systems.

CONTRACTOR agrees that in any work or operation involving trenching, where the depth will exceed four feet (4’), CONTRACTOR will provide adequate safety systems for such trenching and excavation that meet the requirements of the Washington Industrial Safety and Health Act, RCW Chapter 49.17. CONTRACTOR shall furnish the DISTRICT with a separate cost estimate for all required safety systems, and such cost item is set out herein as a separate bid item.

In the event that the CONTRACTOR encounters any existing utility conflicts and such conflicts require the water main to cross under the existing utility and at a trench depth of greater than four feet (4’), the cost of such shoring shall be at the CONTRACTOR’s sole expense. Furthermore, if a utility conflict arises with the water main in proximity of the placement of a valve all vertical deflection shall be under the conflicting utility and meet all separation and casing requirements.

1.15 MINIMUM QUALIFICATIONS OF THE SUCCESSFUL BIDDER

The CONTRACTOR shall have the experience and knowledge necessary to complete the work as detailed in the attached Plans and Specifications. Under no circumstances shall an inexperienced CONTRACTOR be awarded the project. See Section 00 45 13.

2.0 MOVE-IN AND SITE PREPARATION

2.1 GENERAL

The CONTRACTOR shall set up construction facilities in a neat and orderly manner within their work area. The construction area shall be cleaned on a daily basis, with roads being wetted and vacuum swept upon the completion of each workday.

2.2 DISPOSAL OF WASTE MATERIAL

Dispose of all waste material in a manner that meets Washington State and Snohomish County standards.

3.0 WATER SYSTEM MATERIALS AND INSTALLATION

3.1 GENERAL

Everett, WA 98201

ITB No. 26-1692-KS Specification

3.1.1 GENERAL NOTES

A copy of the Contract Plans and this Specification shall be maintained on the project site at all times.

If an existing utility pole adjacent to the water main installation needs temporary support (working within five feet (5’) of the pole) the CONTRACTOR shall notify the DISTRICT for support of the pole. For pole support call Val Smith at 360-629-5712.

A deposit of $2,000 is required for each call out of a PUD crew. The actual cost in time and material may be more than the deposit. All work for the support of power poles shall be done at the CONTRACTOR’s expense and shall be accounted for Bid Items 3 and 4.

The CONTRACTOR shall notify the underground utilities locating center by dialing 811, 48 hours prior to construction.

Approved shoring shall be utilized on all trenches exceeding 48 inches (4-feet) in depth.

CONTRACTOR shall an adequate quantity and assortment of repair fittings on-site at all times.

3.1.2 PERMITS

The DISTRICT will secure utility Right-of-Way permits required for installation of water mains and appurtenances. The CONTRACTOR shall secure all other permits, at the Contractor’s sole expense, and authorizations required from local and state agencies including City of Lake Stevens and Snohomish County related to road (or lane) closure and traffic control, and all matters related to asbestos work, removal and disposal, including but not limited to submittal of a written "Application to Perform an Asbestos Project" to Puget Sound Clean Air Agency (PSCAA) - (if applicable to the project). No work on asbestos-cement pipe shall proceed without proper permits, certifications, worker protective clothing, and breathing apparatus, and approved asbestos disposal bags. Prior to commencing work on asbestos-cement pipe, the CONTRACTOR shall provide the DISTRICT with a copy of any "Application to Perform an Asbestos Project" which has to be filed by the CONTRACTOR with PSCAA relating to work under this Specification. The CONTRACTOR shall comply with all provisions of any applicable permits. The cost of asbestos related permits shall be paid by the CONTRACTOR. A copy of any required permit(s) shall be available at the project site at all times.

3.1.2.1 CONSTRUCTION STORMWATER GENERAL PERMIT (As Required)

1. The Construction Stormwater General Permit is a federal water quality permit obtained from the Washington State Department of Ecology for all storm water discharges associated with construction activities within the State of Washington. To be covered, a project must comply with the requirements of the permit. These requirements are available at:

https://ecology.wa.gov/DOE/files/a1/a11b5cb4-491e-4810-ba0f-c79cd9e6f93c.pdf

2. If applicable, the CONTRACTOR will ensure compliance with the Construction Stormwater General Permit. Compliance includes storm https://ecology.wa.gov/DOE/files/a1/a11b5cb4-491e-4810-ba0f-c79cd9e6f93c.pdf https://ecology.wa.gov/DOE/files/a1/a11b5cb4-491e-4810-ba0f-c79cd9e6f93c.pdf

Everett, WA 98201

ITB No. 26-1692-KS Specification water monitoring and reporting.

3. If applicable, coverage under the Construction Stormwater General Permit will be secured by the DISTRICT and will be transferred to the

CONTRACTOR.

4. If applicable, the Transfer of Coverage form that shall be executed by the CONTRACTOR can be found at:

https://fortress.wa.gov/ecy/publications/documents/ecy02087a.pdf

3.1.3 PROJECT ACCEPTANCE AND INSPECTION

The project will be accepted as complete only after satisfactory installation, flushing, pressure and leakage testing, bacteriological testing, and restoration as determined by the governing body or bodies with jurisdiction over the work.

All disturbed facilities (mailboxes, driveways, fencing, drainage pipes, landscaping and catch basins, etc.) shall be repaired/replaced to pre-construction or better conditions as required by the DISTRICT and the governing body or bodies with jurisdiction over the work.

The DISTRICT will provide inspection service for all water system construction.

Inspection is required for workmanship, location of waterline appurtenances, pressure tests, bacteriological tests, all cut-ins to existing DISTRICT facilities, and final cleanup and restoration.

3.2 EARTHWORK

3.2.1 CLEARING, GRUBBING AND GRADING

The CONTRACTOR shall clear, grub, and grade areas only as necessary for access to and installation of those improvements specified herein and on the Contract Plans and the Snohomish County PUD No. 1, Water Utility Standards and Specifications for Design and Construction for required materials and installation (hereafter referred to as “Standards and Specifications” (available at Standards Specs Water Resources (snopud.com) or https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf , Appendix A).

The CONTRACTOR shall remove all debris, materials unsuitable for backfill, and related excess materials generated from clearing and grubbing operations and appropriately dispose of such materials offsite in accordance with all applicable federal, state, and local requirements.

3.2.2 CONSTRUCTION STORMWATER AND POLLUTION CONTROL

CONTRACTOR shall prevent the pollution of drains and watercourses by sanitary wastes, sediment, debris, and other substances resulting from construction activities.

No sanitary wastes will be permitted to enter any drain or watercourse. No sediment, debris, or other substances will be permitted to enter any drain or watercourse.

The CONTRACTOR shall maintain oil absorption pads on the actual job site whenever any equipment is present to immediately catch and contain any oil and/or fuel leaks.

https://fortress.wa.gov/ecy/publications/documents/ecy02087a.pdf https://www.snopud.com/wp-content/uploads/2021/08/wpp_stds.pdf

Everett, WA 98201

ITB No. 26-1692-KS Specification

If applicable, the CONTRACTOR will be required to take ownership of the Washington State Department of Ecology (DOE) issued Construction General Stormwater Permit following Notice to Proceed. The CONTRACTOR shall follow all of the provisions listed in the Storm Water Pollution Protection Plan (SWPPP) and Erosion and Sedimentation Control Plan (ESCP) and maintain a copy of the Plan on site whenever construction is in progress. Should the erosion and sedimentation control measures initially installed prove to be inadequate, the CONTRACTOR shall immediately install additional facilities as necessary to protect adjacent properties, sensitive areas, natural water sources, and/or storm drainage systems. In addition, the CONTRACTOR shall review and follow all requirements of the various permits received by the DISTRICT.

The CONTRACTOR shall identify a Certified Erosion Sediment Control Lead (CESCL) (Washington State Department of Ecology (DOE) certified with current certification) Pollution Control Inspector, no later than the Pre-Construction meeting, who will be on-site, or on-call and readily accessible to the site, at all times while construction activities are occurring that may affect the quality of ground and surface water.

The CESCL Inspector shall have the authority to ensure proper implementation of these Plans and impose additional corrective actions necessary because of changing field conditions. If the CESCL Inspector issues an order necessary to implement a portion of these Plans to prevent pollution from reaching any surface waters, all of the CONTRACTOR’s employees, shall immediately comply with that order.

The CONTRACTOR shall be solely responsible for all conditions of the permit, including but not limited to the filing of the notice of termination and satisfying any final requirements as imposed by the Department of Ecology.

3.3 EXCAVATION

3.3.1 GENERAL

Excavation shall be performed to the lines and grades necessary for proper installation of all facilities as specified herein and as shown on the Contract Plans and District Standards and Specifications. Temporary drains, drainage ditches, and/or concrete dams shall be installed at the CONTRACTOR’s expense to intercept or direct surface and ground water, which may affect the proper promotion or condition of the work.

Dewatering and discharge of all ground water shall be per Snohomish County Standards and the DOE. All excavated materials shall be properly disposed of at an approved disposal site at the CONTRACTOR’s sole expense, in accordance with all applicable laws and regulations of local, state, and federal government. The CONTRACTOR shall keep the excavated area clean and free of all packaging material, lunch bags, pop cans, and other debris. All such debris shall be disposed of offsite in the appropriate manner.

Except as otherwise provided in this Specification, or on the Contract Plans, or unless otherwise specified by the DISTRICT or any applicable governmental entity with jurisdiction over the work, any abandoned facilities (including asbestos cement water lines), rocks, concrete, old concrete or asphalt road beds that have been paved over, stumps, logs, or other such unsuitable backfill materials excavated by the CONTRACTOR shall be excavated and disposed of by the CONTRACTOR, at the

Everett, WA 98201

ITB No. 26-1692-KS Specification

CONTRACTOR’s sole cost and expense, offsite in accordance with all applicable laws and regulations of local, state, and federal government.

The CONTRACTOR shall perform all exploratory excavation to determine…