This is a construction contract specification document for the Texas Department of Transportation (TxDOT) involving intersection improvement work in Tom Green County. The project encompasses the reconstruction and improvement of an intersection, with detailed specifications for grading, drainage, pavement, and traffic control measures. The scope of work includes excavation, embankment construction, base course installation, asphalt concrete paving, concrete curb and gutter work, drainage structure installation, and temporary traffic control devices. The project specifications reference standard TxDOT specifications and drawings, with work to be performed according to the Texas Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges. The contract includes requirements for mobilization, site preparation, utility coordination, and final restoration of the project area.

The contract specifies payment on a unit price basis for various bid items including earthwork, base materials, asphalt paving, concrete work, and traffic control. The specifications establish quality standards for materials and construction methods, with requirements for inspection and testing throughout the project duration. The document includes provisions for contract administration, change orders, safety requirements, and compliance with applicable federal and state regulations. Contractors must submit detailed plans for traffic control, erosion control, and construction sequencing prior to work commencement. The specification document requires adherence to environmental protection measures and establishes penalties for non-compliance with quality standards and project schedules.

Text of this file

****** OFFICIAL ADVERTISEMENT *******

*** STATE LET CONSTRUCTION CONTRACT ***

COUNTY: TOM GREEN HIGHWAY: US 87 LENGTH: 0 MI

CONTROL NUMBER: 0069-07-113 DBE GOAL: 0.0%

PROJECT NUMBER: STP 2026(864)HES

TYPE: INTERSECTION IMPROVEMENT

TIME FOR COMPLETION: 52 WORKING DAYS GUARANTY: 36,000.00

BIDS RECEIVED UNTIL: 1:00 PM August 6, 2026 EST.COST: 1,800,039.59 BIDS WILL BE OPENED: 1:00 PM August 6, 2026

MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL:

TEXAS DEPARTMENT OF TRANSPORTATION WILLIAM MCLANE

07DISTHQ

AUSTIN HQ - STASSNEY SAN ANGELO TX 76904

6230 E STASSNEY LN RM MIC3.02 (325) 947-9211

AUSTIN TX 78744-3147

(512) 416-2498

LIMITS FROM: AT FM 2105

LIMITS TO: -

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .