005B_Pricing_10_04_24.xls
XLS spreadsheet 2 MB Posted
- Attached to
- Competitive Selection OH|DOT005B25-10
- Contract number
- DOT005B25-10
- Issued by
- Ohio
About this file
This document is an Invitation to Bid (ITB) for Tree & Brush Power Shearing, Trimming, Mulching & Removal Services, designated as ITB005B-25 and dated 10/4/24. The contract appears to be a state or local government indefinite delivery vehicle that covers multiple districts, potentially for a state transportation or public works department, with provisions for various equipment and service types across 12 distinct geographical districts.
The contract provides detailed pricing structures for a wide range of specialized tree and vegetation management equipment, including bucket trucks, power tree shearing services, mulcher mowers, tree care handlers, brush chippers, stump cutters, and log loaders. Pricing is comprehensively broken down by hourly, daily, weekly, and monthly rates, with separate rates for equipment and operators, including standard and prevailing wage rates. The bid requires vendors to submit photos of each piece of equipment, specify make, model, and horsepower, and includes provisions for mobilization and demobilization costs across different districts. Additional services include traffic control and supplemental equipment options, with the expectation that vendors will provide service vehicles with fuel, parts, and tools necessary to support operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ODOT_Co-Op_Program_Information.pdf | ||
| RUSSELL_TREE_SERVICE__REV__005B_Pricing_10_04_24_updated_Russell_Tree_Experts.xls | XLS spreadsheet | |
| Signature__4___1___002___9_.pdf | ||
| affirmation_and_disclosure_09032024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Photo Instructions
How to Upload Photos/Pictures
1. Please tap on the "enable content" button on the top bar if asked.
2. Take photos/pictures and download them onto your computer.
3. Tap on the cell in the "Model:" column that you want to insert a photo/picture in.
4. Click on the "Insert Photos" button.
5. Locate and select the appropriate photo/picture from the file on your computer.
6. Hover over the cell where the photo/picture was inserted. The appropriate photo/picture should appear. Repeat steps 1-5 for additional pieces of equipment.
If the photo/picture selected is incorrect, go to step 7. If the photo/picture does not appear, repeat steps 1-5.
7. For photo/picture selected that is incorrect, right-click on that cell and tap "delete comment" then repeat steps 1-5.
VENDOR INFORMATION
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | |
| Vendor Name: | (insert vendor name here) |
| Telephone orders may be followed with fax confirmation sent by the Department. | |
| Identify locations where orders will be placed, the name of an individual responsible for taking the orders, their telephone, and fax numbers. | |
| Vendor Address: | |
| Contact Person: | |
| Telephone Number: | |
| Fax Number: | |
| Email Address: | |
| SEE GUIDANCE TAB FOR CLARIFICATION ON FILLING OUT THE PRICING PAGE | |
| PHOTOS ARE TO BE INCLUDED, AND ARE TO BE POSTED TO THE RESPECTIVE TABS. |
SEE EXPLANATION FOF INSERTING PHOTOS AT TOP OF "PRICING" TAB
DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT. DOING SO MAY RESULT IN REJECTION OF YOUR BID.
SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS
| DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT |
| Do NOT submit previous versions (pricing pages) of the same contract. |
GUIDANCE
| INFORMATION ON PRICING PAGE REQUIREMENTS. FOR EACH REFERENCE NUMBER COMPLETE ALL INFORMATION ON THE LINE | ||||||||||||||
| REFER TO TERMS FOR CLEAR DESCRIPTION OF EQUIPMENT TYPE REQUESTED FOR EACH LINE ITEM LISTED | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization | ||||||||||||
| See Section 11 | District 1: Mobilization & Demobilization | District 2: Mobilization & Demobilization | ||||||||||||
| REF # | TYPE: | EQ TYPE PHOTO | ||||||||||||
| (See Instructions Above) | Make: | Model: | Horsepower: | $ / hour | $ / day | $ / week | $ / month | |||||||
| EX | * Bucket Truck A | * Bucket Truck A | 2014 F-750 | Hi-Ranger 55 RearMount | 280 | Based on | ||||||||
| 8 hr day | Based on | |||||||||||||
| 40 hr week | List LowBoy where applicable | Lump Sum | Lump Sum | |||||||||||
| 1A | * Bucket Truck A (50ft min. reach) | 1A (Bucket Truck A) | 2004 International 4300 | Altec 55 Rear Mount | 280 | $10.00 | $75.00 | $350.00 | $1,000.00 | $300.00 | $300.00 | |||
| 1B | * Bucket Truck A (50ft min. reach) | 1B (Bucket Truck A) | 2017 Freightliner | Versalift VO260 Rear Mount | 250 | $10.00 | $75.00 | $350.00 | $1,000.00 | |||||
| 1C | * Bucket Truck A (50ft min. reach) | 1C (Bucket Truck A) | ||||||||||||
| 1D | OPERATOR | $5.00 | $40.00 | $200.00 | $840.00 | |||||||||
| 1E | OPERATOR (Prevailing Wage Rate ***) | $6.00 | $48.00 | $240.00 | $1,008.00 | |||||||||
| 1 | FOR EACH REFERENCE NUMBER, COMPLETE ALL INFORMATION (MAKE, MODEL, HP) ON THE LINE AS IT RELATES TO THE EQUIPMENT "TYPE" (Column B) REQUESTED/DESCRIBED. | |||||||||||||
| 2 | FOR EACH REFERENCE NUMBER, PROVIDE A COST PER TIME REFERENCE AS SHOWN. AT A MINIMUM, THE COST PER HOUR ($/hour) MUST BE COMPLETED FOR THE LINE ITEM TO BE ACCEPTABLE. | |||||||||||||
| 3 | FOR EACH COST PER REFERENCE HOUR PROVIDED FOR A PIECE OF EQUIPMENT, PROVIDE A COST PER REFERENCE HOUR FOR THE OPERATOR. | |||||||||||||
| 4 | MOBILIZATION & DEMOBILIZATION ARE BY DISTRICT. COLUMNS "N" to "Y" | |||||||||||||
| 5 | TRAFFIC CONTROL IS LISTED ON A SEPARATE TAB. | |||||||||||||
| IF NO COST IS PROVIDED, THE COST WILL BE ASSUMED TO BE INLCUSIVE OF THE EQUIPMENT COST. | ||||||||||||||
| REFER TO TERMS FOR CLEAR DESCRIPTION OF EQUIPMENT TYPE REQUESTED FOR EACH LINE ITEM LISTED | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization |
See Section 11
| REF # | TYPE: | EQ TYPE PHOTO | |||||
| (See Instructions Above) | Make: | Model: | Horsepower: | $ / hour | $ / day | $ / week | $ / month |
| LIST SUPPLEMENTAL EQ BELOW | DESCRIPTION OF SUPPLEMENTAL EQUIPMENT | ||||||
| 12A.1 | Crane | 2016 Freightliner National 30 Ton Crane / 500hp | FOR ALL ITEMS LISTED TO THE LEFT, THE PRICING IS TO BE POPULATED BELOW (Starting in row 98) IN THE ROW CORRESPONDING TO THE ITEM NUMBER. | ||||
| 12B.1 | Tracked Lift | 2019 Trackedlift 72' | |||||
| 12C.1 | |||||||
| EQ WILL POPULATE BELOW | |||||||
| IF EQ IS LISTED ABOVE | LINK WILL POPULATE BELOW |
IF EQ IS LISTED ABOVE
| 12A.1 | ** 12A ( Crane ) | ** 12A ( Crane ) | 2016 Freightliner | National 30 Ton Crane | 500 | $10.00 | $75.00 | $350.00 | $1,000.00 |
| 12A.2 | OPERATOR | $5.00 | $40.00 | $200.00 | $840.00 | ||||
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | $6.00 | $48.00 | $240.00 | $1,008.00 | ||||
| 1 | FOR REFERENCE NUMBER #12A-X, LIST ANY ADDITIONAL EQUIPMENT TYPE AND A DESCRIPTION IN STARTING IN ROW 77. | ||||||||
| 2 | FOR EACH REFERENCE NUMBER #12A-X, LISTED BEGINNING ON ROW 77, THE INFORMATION WILL POPULATE BELOW BEGINNNING IN ROW 98. IN THIS AREA , COMPLETE THE INFORMATION (MAKE, MODEL, HP) ON THE LINE AS IT RELATES TO THE EQUIPMENT "TYPE" (Column B) . | ||||||||
| 3 | FOR EACH REFERENCE NUMBER, PROVIDE A COST PER TIME REFERENCE AS SHOWN. AT A MINIMUM, THE COST PER HOUR ($/hour) MUST BE COMPLETED FOR THE LINE ITEM TO BE ACCEPTABLE. | ||||||||
| 4 | FOR EACH COST PER REFERENCE HOUR PROVIDED FOR A PIECE OF EQUIPMENT, PROVIDE A COST PER REFERENCE HOUR FOR THE OPERATOR. | ||||||||
| 5 | MOBILIZATION & DEMOBILIZATION ARE BY DISTRICT. COLUMNS "N" to "Y" | ||||||||
| 6 | TRAFFIC CONTROL IS LISTED ON A SEPARATE TAB. | ||||||||
| IF NO COST IS PROVIDED, THE COST WILL BE ASSUMED TO BE INLCUSIVE OF THE EQUIPMENT COST. |
1B (Bucket Truck A) 1C (Bucket Truck A) 1A (Bucket Truck A) ** 12A ( Crane )
PRICING
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | ||
| Vendor Name: | See Vendor Information TAB | PRICING OF EQUIPMENT AND LABOR (OPERATORS, OPERATOR w/PREV WG., GROUNDSMEN) ARE SEPARATED. |
PROVIDE PRICING FOR EQ & LB FOR EACH
PIECE OF EQUIPMENT YOU CHOOSE TO BID.
VENDOR PERSONNEL WILL BE
| USED FOR ALL EQUIPMENT. | REFER TO SECTION 11 OF THE SPECIFICATIONS FOR MOBILIZATION & DEMOBILIZATION. | |
| A PHOTO MUST BE SUBMITTED FOR EACH PIECE OF EQUIPMENT BID. (See 9.15) |
Photo is to be inserted in the corresponding tab as indicated by the REF # in column A
1) Click on the link in column C, which represents the equipment type
2) This will take you directly to the corresponding tab of the REF # (column A).
3) Insert or Paste the photo on the corresponding tab.
4) To return to the pricing page, click on the link in cell 1A of the TAB you are in.
5) Repeat the process for each piece of equipment you wish to bid.
| Do you have a certified arborist on staff? | ||||
| Yes or No -------------> | PRICING | Mobilization & Demobilization | ||
| REFER TO TERMS FOR CLEAR DESCRIPTION OF EQUIPMENT TYPE REQUESTED FOR EACH LINE ITEM LISTED | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization |
See Section 11
| See Item #15A | District 1: Mobilization & Demobilization | District 2: Mobilization & Demobilization | District 3: Mobilization & Demobilization | District 4: Mobilization & Demobilization | District 5: Mobilization & Demobilization | District 6: Mobilization & Demobilization | District 7: Mobilization & Demobilization | District 8: Mobilization & Demobilization | District 9: Mobilization & Demobilization | District 10: Mobilization & Demobilization | District 11: Mobilization & Demobilization | District 12: Mobilization & Demobilization | |||
| REF # | TYPE: | EQ TYPE PHOTO | |||||||||||||
| (See Instructions Above) | Make: | Model: | Horsepower: | $ / hour | $ / day | $ / week | $ / month | ||||||||
| EX | * Bucket Truck A | * Bucket Truck A | 2014 F-750 | Hi-Ranger 55 RearMount | 280 | Based on | |||||||||
| 8 hr day | Based on | ||||||||||||||
| 40 hr week | LowBoy? | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | ||
| 1A | * Bucket Truck A (50ft min. reach) | 1A (Bucket Truck A) | |||||||||||||
| 1B | * Bucket Truck A (50ft min. reach) | 1B (Bucket Truck A) | |||||||||||||
| 1C | * Bucket Truck A (50ft min. reach) | 1C (Bucket Truck A) | |||||||||||||
| 1D | OPERATOR | ||||||||||||||
| 1E | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 2A | * Bucket Truck B (70ft min. reach) | 2A (Bucket Truck B) | |||||||||||||
| 2B | * Bucket Truck B (70ft min. reach) | 2B (Bucket Truck B) | |||||||||||||
| 2C | * Bucket Truck B (70ft min. reach) | 2C (Bucket Truck B) | |||||||||||||
| 2D | OPERATOR | ||||||||||||||
| 2E | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 3A | * Single blade Power Tree Shearing Service | 3A (Single blade P.T.S.) | |||||||||||||
| 3B | * Single blade Power Tree Shearing Service | 3B (Single blade P.T.S.) | |||||||||||||
| 3C | OPERATOR | ||||||||||||||
| 3D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 4A | * Mulcher Mower | 4A (Mulcher Mower) | |||||||||||||
| 4B | * Mulcher Mower | 4B (Mulcher Mower) | |||||||||||||
| 4C | OPERATOR | ||||||||||||||
| 4D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 5A | * Tree Care Handler with Grapple Saw | 5A (Tree Handler w/ Grapple Saw) | |||||||||||||
| 5B | * Tree Care Handler with Grapple Saw | 5B (Tree Handler w/ Grapple Saw) | |||||||||||||
| 5C | OPERATOR | ||||||||||||||
| 5D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 6A | * Clam Fork Vehicle | 6A (Clam Fork Vehicle) | |||||||||||||
| 6B | * Clam Fork Vehicle | 6B (Clam Fork Vehicle) | |||||||||||||
| 6C | OPERATOR | ||||||||||||||
| 6D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 7A | * Brush Chipper A (see 10.3) with truck, chip box | 7A (Brush Chipper A / truck / chip box | |||||||||||||
| 7B | * Brush Chipper A (see 10.3) with truck, chip box | 7B (Brush Chipper A / truck / chip box | |||||||||||||
| 7C | OPERATOR | ||||||||||||||
| 7D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 8A | * Brush Chipper B (See 10.3) with truck, chip box | 8A (Brush Chipper A / truck / chip box | |||||||||||||
| 8B | * Brush Chipper B (See 10.3) with truck, chip box | 8B (Brush Chipper A / truck / chip box | |||||||||||||
| 8C | OPERATOR | ||||||||||||||
| 8D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 9A | * Stump Cutter | 9A (Stump Cutter) | |||||||||||||
| 9B | * Stump Cutter | 9B (Stump Cutter) | |||||||||||||
| 9C | OPERATOR | ||||||||||||||
| 9D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 10A | * Log Loader | 10A (Log Loader) | |||||||||||||
| 10B | * Log Loader | 10B (Log Loader) | |||||||||||||
| 10C | OPERATOR | ||||||||||||||
| 10D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 11A | * Iron Horse | 11A (Iron Horse) | |||||||||||||
| 11B | * Iron Horse | 11B (Iron Horse) | |||||||||||||
| 11C | OPERATOR | ||||||||||||||
| 11D | OPERATOR (Prevailing Wage Rate ***) | ||||||||||||||
| 13A | GROUNDSMEN | ||||||||||||||
| 13B | GROUNDSMEN (Prevailing Wage Rate ***) | ||||||||||||||
| Lump Sum |
Per Day
| 15A | LOWBOY TRANSPORT (Lump Sum per Day) | LOWBOY TRANSPORT (Lump Sum per Day) | ||
| LOWBOY | ||||
| LIST SUPPLEMENTAL EQ BELOW | DESCRIPTION OF SUPPLEMENTAL EQUIPMENT | |||
| 12A.1 | FOR ALL ITEMS LISTED TO THE LEFT, THE PRICING IS TO BE POPULATED BELOW (Starting in row 98) IN THE ROW CORRESPONDING TO THE ITEM NUMBER. | |||
| 12B.1 | ||||
| 12C.1 | ||||
| 12D.1 | ||||
| 12E.1 | ||||
| 12F.1 | ||||
| 12G.1 | ||||
| 12H.1 | ||||
| 12J.1 | ||||
| 12K.1 | ||||
| 12L.1 | ||||
| 12M.1 | ||||
| 12N.1 | ||||
| 12P.1 | ||||
| 12Q.1 | ||||
| 12R.1 | ||||
| 12S.1 | ||||
| 12T.1 | ||||
| 12V.1 | ||||
| 12X.1 | ||||
| EQ WILL POPULATE BELOW | ||||
| IF EQ IS LISTED ABOVE | LINK WILL POPULATE BELOW |
IF EQ IS LISTED ABOVE
| 12A.1 | $0.00 | $0.00 |
| 12A.2 | OPERATOR | |
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12B.1 | $0.00 | $0.00 |
| 12B.2 | OPERATOR | |
| 12B.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12C.1 | $0.00 | $0.00 |
| 12C.2 | OPERATOR | |
| 12C.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12D.1 | $0.00 | $0.00 |
| 12D.2 | OPERATOR | |
| 12D.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12E.1 | $0.00 | $0.00 |
| 12E.2 | OPERATOR | |
| 12E.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12F.1 | $0.00 | $0.00 |
| 12F.2 | OPERATOR | |
| 12F.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12G.1 | $0.00 | $0.00 |
| 12G.2 | OPERATOR | |
| 12G.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12H.1 | $0.00 | $0.00 |
| 12H.2 | OPERATOR | |
| 12H.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12J.1 | $0.00 | $0.00 |
| 12J.2 | OPERATOR | |
| 12J.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12K.1 | $0.00 | $0.00 |
| 12K.2 | OPERATOR | |
| 12K.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12L.1 | $0.00 | $0.00 |
| 12L.2 | OPERATOR | |
| 12L.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12M.1 | $0.00 | $0.00 |
| 12M.2 | OPERATOR | |
| 12M.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12N.1 | $0.00 | $0.00 |
| 12N.2 | OPERATOR | |
| 12N.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12P.1 | $0.00 | $0.00 |
| 12P.2 | OPERATOR | |
| 12P.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12Q.1 | $0.00 | $0.00 |
| 12Q.2 | OPERATOR | |
| 12Q.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12R.1 | $0.00 | $0.00 |
| 12R.2 | OPERATOR | |
| 12R.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12S.1 | $0.00 | $0.00 |
| 12S.2 | OPERATOR | |
| 12S.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12T.1 | $0.00 | $0.00 |
| 12T.2 | OPERATOR | |
| 12T.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12V.1 | $0.00 | $0.00 |
| 12V.2 | OPERATOR | |
| 12V.3 | OPERATOR (Prevailing Wage Rate ***) | |
| 12X.1 | $0.00 | $0.00 |
| 12X.2 | OPERATOR | |
| 12X.3 | OPERATOR (Prevailing Wage Rate ***) | |
| * | Rate includes: Service vehicle with fuel, parts & tools needed to support the equipment to perform its operations. | |
| ** | For supplemental equipment (along with a brief description of the equipment) that may be utilized for the terms of this contract. Single Asterisk " * " shall be applied to Supplemental equipment. | |
| *** | Prevailing wage rates: To only be used on prevailing wage jobs. | |
| 12A.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12B.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12C.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12D.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12E.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12F.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12G.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12H.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12J.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12K.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12L.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12M.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12N.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12P.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12Q.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12R.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12S.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12T.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12V.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |
| 12X.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) |
1B (Bucket Truck A) 1C (Bucket Truck A) 2A (Bucket Truck B) 2B (Bucket Truck B) 2C (Bucket Truck B) 3A (Single blade P.T.S.)
3B (Single blade P.T.S.)
4A (Mulcher Mower) 4B (Mulcher Mower) 5A (Tree Handler w/ Grapple Saw) 5B (Tree Handler w/ Grapple Saw) 6A (Clam Fork Vehicle) 6B (Clam Fork Vehicle) 7A (Brush Chipper A / truck / chip box 7B (Brush Chipper A / truck / chip box 8A (Brush Chipper A / truck / chip box 8B (Brush Chipper A / truck / chip box 9A (Stump Cutter) 9B (Stump Cutter) 10A (Log Loader) 10B (Log Loader) 11A (Iron Horse) 11B (Iron Horse) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1A (Bucket Truck A) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
NEW PRICING
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | |
| Vendor Name: | See Vendor Information TAB |
| A PHOTO MUST BE SUBMITTED FOR EACH PIECE OF EQUIPMENT BID. (See 9.15) |
Ref # to left and "Type" must be listed on respective photos submitted or photo is saved as the Ref # and "Type (Ref 1A_Bucket_TruckB.jpeg). You may have multiple pieces of the same type of equipment.
See "PHOTO INSTRUCTIONS" tab for details on how to upload Photos/Pictures PRICING OF EQUIPMENT AND LABOR (OPERATORS, OPERATOR w/PREV WG., GROUNDSMEN) ARE SEPARATED.
PROVIDE PRICING FOR EQ & LB FOR EACH PIECE OF EQUIPMENT YOU CHOOSE TO BID.
VENDOR PERSONNEL WILL BE USED FOR ALL EQUIPMENT.
| Do you have a certified arborist on staff? | ||||||||||||||||
| Yes or No -------------> | PRICING | Mobilization & Demobilization | ||||||||||||||
| REF # | TYPE: | Make: | Model: | Horsepower: | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization | ||||||||||
| See Section 11 | District 1: Mobilization & Demobilization | District 2: Mobilization & Demobilization | District 3: Mobilization & Demobilization | District 4: Mobilization & Demobilization | District 5: Mobilization & Demobilization | District 6: Mobilization & Demobilization | District 7: Mobilization & Demobilization | District 8: Mobilization & Demobilization | District 9: Mobilization & Demobilization | District 10: Mobilization & Demobilization | District 11: Mobilization & Demobilization | District 12: Mobilization & Demobilization | District 12: Equipment Rate per Prevailing wage jobs*** | |||
| $ / hour | $ / day | $ / week | $ / month | |||||||||||||
| EX | * Bucket Truck A | 2014 F-750 | Hi-Ranger 55 RearMount | 280 | Based on | |||||||||||
| 8 hr day | Based on | |||||||||||||||
| 40 hr week | Hourly Rate or LowBoy | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | $ / hour | ||
| 1A | * Bucket Truck A | Make: Model: Horsepower: | ||||||||||||||
| 1B | * Bucket Truck A | |||||||||||||||
| 1C | * Bucket Truck A | |||||||||||||||
| 1D | OPERATOR | |||||||||||||||
| 1E | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 2A | * Bucket Truck B | |||||||||||||||
| 2B | * Bucket Truck B | |||||||||||||||
| 2C | * Bucket Truck B | |||||||||||||||
| 2D | OPERATOR | |||||||||||||||
| 2E | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 3A | * Single blade Power Tree Shearing Service | |||||||||||||||
| 3B | * Single blade Power Tree Shearing Service | |||||||||||||||
| 3C | OPERATOR | |||||||||||||||
| 3D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 4A | * Mulcher Mower | |||||||||||||||
| 4B | * Mulcher Mower | |||||||||||||||
| 4C | OPERATOR | |||||||||||||||
| 4D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 5A | * Tree Care Handler with Grapple Saw | |||||||||||||||
| 5B | * Tree Care Handler with Grapple Saw | |||||||||||||||
| 5C | OPERATOR | |||||||||||||||
| 5D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 6A | * Clam Fork Vehicle | |||||||||||||||
| 6B | * Clam Fork Vehicle | |||||||||||||||
| 6C | OPERATOR | |||||||||||||||
| 6D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 7A | * Brush Chipper A (see 10.3) with truck, chip box | |||||||||||||||
| 7B | * Brush Chipper A (see 10.3) with truck, chip box | |||||||||||||||
| 7C | OPERATOR | |||||||||||||||
| 7D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 8A | * Brush Chipper B (See 10.3) with truck, chip box | |||||||||||||||
| 8B | * Brush Chipper B (See 10.3) with truck, chip box | |||||||||||||||
| 8C | OPERATOR | |||||||||||||||
| 8D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 9A | * Stump Cutter | |||||||||||||||
| 9B | * Stump Cutter | |||||||||||||||
| 9C | OPERATOR | |||||||||||||||
| 9D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 10A | * Log Loader | |||||||||||||||
| 10B | * Log Loader | |||||||||||||||
| 10C | OPERATOR | |||||||||||||||
| 10D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 11A | * Iron Horse | |||||||||||||||
| 11B | * Iron Horse | |||||||||||||||
| 11C | OPERATOR | |||||||||||||||
| 11D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12A.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12A.2 | OPERATOR | |||||||||||||||
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12B.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12B.2 | OPERATOR | |||||||||||||||
| 12B.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12C.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12C.2 | OPERATOR | |||||||||||||||
| 12C.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12D.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12D.2 | OPERATOR | |||||||||||||||
| 12D.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12E.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12E.2 | OPERATOR | |||||||||||||||
| 12E.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12F.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12F.2 | OPERATOR | |||||||||||||||
| 12F.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12G.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12G.2 | OPERATOR | |||||||||||||||
| 12G.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12H.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12H.2 | OPERATOR | |||||||||||||||
| 12H.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 13A | GROUNDSMEN | |||||||||||||||
| 13B | GROUNDSMEN (Prevailing Wage Rate ***) | |||||||||||||||
| Lump Sum |
Per Day
| 15A | LOWBOY TRANSPORT (Lump Sum per Day) | |
| * | Rate includes: Service vehicle with fuel, parts & tools needed to support the equipment to perform its operations. | |
| ** | List any supplemental equipment (along with a brief description of the equipment) that may be utilized for the terms of this contract. Single Asterisk " * " shall be applied to Supplemental equipment. | |
| *** | Prevailing wage rates: To only be used on prevailing wage jobs. |
Click to
INSERT PHOTOS
Traffic Control
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | DISTRICT | |||||||||||||
| Vendor Name: | See Vendor Information TAB | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
| Traffic Control for a lane closure on a two lane road with flaggers. 100’ to 500’ work zone | Lump Sum / Day | |||||||||||||
| Traffic Control for a lane closure on a two lane road with flaggers. 501’ to 1000’ work zone | Lump Sum / Day | |||||||||||||
| Traffic Control for a lane closure on a two lane road with flaggers. 1001’ to 1500’ work zone | Lump Sum / Day | |||||||||||||
| Traffic Control for a lane closure on a two lane road with flaggers. 1501’ to 2000’ work zone | Lump Sum / Day | |||||||||||||
| Provide Pricing for Trafffic Control. See Section 9.4 |
1A Click here to return to Pricing Page PICTURE OF 1A (Bucket Truck A) , , Click here to return to Pricing Page
1B Click here to return to Pricing Page PICTURE OF 1B (Bucket Truck A) , , Click here to return to Pricing Page
1C Click here to return to Pricing Page PICTURE OF 1C (Bucket Truck A) , , Click here to return to Pricing Page
2A Click here to return to Pricing Page PICTURE OF 2A (Bucket Truck B) , , Click here to return to Pricing Page
PULL DATA
| REF | TYPE: | Make: | Model: | Horsepower: | Concatentated Data for Pictures | District 1: /Hour | District 1: /Day | District 1: /Week | District 1: /Month | Site-to-Site Mobilization; minimum 3 hours (/Hour) | District 1: Mobilization & Demobilization (Lump Sum) | District 2: Mobilization & Demobilization (Lump Sum) | District 3: Mobilization & Demobilization (Lump Sum) | District 4: Mobilization & Demobilization (Lump Sum) | District 5: Mobilization & Demobilization (Lump Sum) | District 6: Mobilization & Demobilization (Lump Sum) | District 7: Mobilization & Demobilization (Lump Sum) | District 8: Mobilization & Demobilization (Lump Sum) | District 9: Mobilization & Demobilization (Lump Sum) | District 10: Mobilization & Demobilization (Lump Sum) | District 11: Mobilization & Demobilization (Lump Sum) | District 12: Mobilization & Demobilization (Lump Sum) |
| 1A | * Bucket Truck A (50ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1B | * Bucket Truck A (50ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1C | * Bucket Truck A (50ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1D | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 1E | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 2A | * Bucket Truck B (70ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2B | * Bucket Truck B (70ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2C | * Bucket Truck B (70ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2D | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 2E | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 3A | * Single blade Power Tree Shearing Service | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 3B | * Single blade Power Tree Shearing Service | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 3C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 3D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4A | * Mulcher Mower | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 4B | * Mulcher Mower | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 4C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 5A | * Tree Care Handler with Grapple Saw | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5B | * Tree Care Handler with Grapple Saw | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 5D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6A | * Clam Fork Vehicle | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 6B | * Clam Fork Vehicle | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 6C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 7A | * Brush Chipper A (see 10.3) with truck, chip box | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 7B | * Brush Chipper A (see 10.3) with truck, chip box | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 7C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 7D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 8A | * Brush Chipper B (See 10.3) with truck, chip box | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 8B | * Brush Chipper B (See 10.3) with truck, chip box | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 8C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 8D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 9A | * Stump Cutter | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 9B | * Stump Cutter | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 9C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 9D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 10A | * Log Loader | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 10B | * Log Loader | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 10C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 10D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 11A | * Iron Horse | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 11B | * Iron Horse | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 11C | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 11D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12A.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12A.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12B.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12B.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12B.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12C.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12C.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12C.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12D.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12D.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12D.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12E.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12E.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12E.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12F.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12F.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12F.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12H.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12H.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12H.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12X.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12X.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12X.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 13A | GROUNDSMEN | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 13B | GROUNDSMEN (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 15A | LOWBOY TRANSPORT (Lump Sum per Day) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Hourly Rate | ||||||||||||||||||||||
| LowBoy | ||||||||||||||||||||||
| YES | ||||||||||||||||||||||
| NO | ||||||||||||||||||||||
| YES | ||||||||||||||||||||||
| NO |
2B Click here to return to Pricing Page PICTURE OF 2B (Bucket Truck B) , , Click here to return to Pricing Page
2C Click here to return to Pricing Page PICTURE OF 2C (Bucket Truck B) , , Click here to return to Pricing Page
3A Click here to return to Pricing Page PICTURE OF 3A (Single blade P.T.S.) , , Click here to return to Pricing Page
3B Click here to return to Pricing Page PICTURE OF 3B (Single blade P.T.S.) , , Click here to return to Pricing Page
4A Click here to return to Pricing Page PICTURE OF 4A (Mulcher Mower) , , Click here to return to Pricing Page
4B Click here to return to Pricing Page PICTURE OF 4B (Mulcher Mower) , , Click here to return to Pricing Page
5A Click here to return to Pricing Page PICTURE OF 5A (Tree Handler w/ Grapple Saw) , , Click here to return to Pricing Page
5B Click here to return to Pricing Page PICTURE OF 5B (Tree Handler w/ Grapple Saw) , , Click here to return to Pricing Page
6A Click here to return to Pricing Page PICTURE OF 6A (Clam Fork Vehicle) , , Click here to return to Pricing Page
6B Click here to return to Pricing Page PICTURE OF 6B (Clam Fork Vehicle) , , Click here to return to Pricing Page
7A Click here to return to Pricing Page PICTURE OF 7A (Brush Chipper A / truck / chip box , , Click here to return to Pricing Page
7B Click here to return to Pricing Page PICTURE OF 7B (Brush Chipper A / truck / chip box , , Click here to return to Pricing Page
8A Click here to return to Pricing Page PICTURE OF 8A (Brush Chipper A / truck / chip box , , Click here to return to Pricing Page
8B Click here to return to Pricing Page PICTURE OF 8A (Brush Chipper A / truck / chip box , , Click here to return to Pricing Page
9A Click here to return to Pricing Page PICTURE OF 9A (Stump Cutter) , , Click here to return to Pricing Page
9B Click here to return to Pricing Page PICTURE OF 9B (Stump Cutter) , , Click here to return to Pricing Page
10A Click here to return to Pricing Page PICTURE OF 10A (Log Loader) , , Click here to return to Pricing Page
10B Click here to return to Pricing Page PICTURE OF 10B (Log Loader) , , Click here to return to Pricing Page
11A Click here to return to Pricing Page PICTURE OF 11A (Iron Horse) , , Click here to return to Pricing Page
11B Click here to return to Pricing Page PICTURE OF 11B (Iron Horse) , , Click here to return to Pricing Page
12A
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12B
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12C
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12D
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12E
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12F
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12G
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12H
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12J
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12K
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12L
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12M
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12N
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12P
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12Q
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12R
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12S
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12T
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12V
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12X
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
File details come from the government source that posted it. Updated .