005B_Pricing_10_04_24__1_.xls
XLS spreadsheet 16 MB Posted
- Attached to
- Competitive Selection OH|DOT005B25-1
- Contract number
- DOT005B25-1
- Issued by
- Ohio
About this file
This document is a state and local contract pricing sheet for ITB005B-25, a solicitation for Tree & Brush Power Shearing, Trimming, Mulching & Removal Services dated 10/4/24, submitted by A-1 Tree Care located in Hillsboro, Ohio. The vendor contact is Randy Bramos, who can be reached at 937-393-4141 or randy@a-1treeohio.com. The document appears to be a comprehensive pricing submission for a state or local government contract covering multiple districts and various types of tree and vegetation management equipment.
The contract includes detailed pricing for a wide range of specialized equipment such as bucket trucks, power tree shearing services, mulcher mowers, brush chippers, stump cutters, log loaders, and supplemental equipment like forestry mulchers and skidders. Pricing is structured with hourly, daily, weekly, and monthly rates for each equipment type, along with separate rates for operators, including standard and prevailing wage rates. Additional services include mobilization and demobilization costs for 12 different districts, traffic control services for lane closures, and a lowboy transport option. The vendor has a certified arborist on staff and provides equipment with varying horsepower ranges and model years, offering flexibility in service delivery across different project requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Affirmation_and_Disclosure__4_.pdf | ||
| ODOT_Co-Op_Program_Information.pdf | ||
| Signature__4___1___002_.pdf | ||
| 005B-25_Bid_Document.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Photo Instructions
How to Upload Photos/Pictures
1. Please tap on the "enable content" button on the top bar if asked.
2. Take photos/pictures and download them onto your computer.
3. Tap on the cell in the "Model:" column that you want to insert a photo/picture in.
4. Click on the "Insert Photos" button.
5. Locate and select the appropriate photo/picture from the file on your computer.
6. Hover over the cell where the photo/picture was inserted. The appropriate photo/picture should appear. Repeat steps 1-5 for additional pieces of equipment.
If the photo/picture selected is incorrect, go to step 7. If the photo/picture does not appear, repeat steps 1-5.
7. For photo/picture selected that is incorrect, right-click on that cell and tap "delete comment" then repeat steps 1-5.
VENDOR INFORMATION
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | |
| Vendor Name: | A-1 Tree Care |
| Telephone orders may be followed with fax confirmation sent by the Department. | |
| Identify locations where orders will be placed, the name of an individual responsible for taking the orders, their telephone, and fax numbers. | |
| Vendor Address: | 5559 State Route 73, Hillsboro, Ohio 45133 |
| Contact Person: | Randy Bramos |
| Telephone Number: | 937-393-4141 |
| Fax Number: | |
| Email Address: | randy@a-1treeohio.com |
| SEE GUIDANCE TAB FOR CLARIFICATION ON FILLING OUT THE PRICING PAGE | |
| PHOTOS ARE TO BE INCLUDED, AND ARE TO BE POSTED TO THE RESPECTIVE TABS. |
SEE EXPLANATION FOF INSERTING PHOTOS AT TOP OF "PRICING" TAB
DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT. DOING SO MAY RESULT IN REJECTION OF YOUR BID.
SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS
| DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT |
| Do NOT submit previous versions (pricing pages) of the same contract. |
GUIDANCE
| INFORMATION ON PRICING PAGE REQUIREMENTS. FOR EACH REFERENCE NUMBER COMPLETE ALL INFORMATION ON THE LINE | ||||||||||||||
| REFER TO TERMS FOR CLEAR DESCRIPTION OF EQUIPMENT TYPE REQUESTED FOR EACH LINE ITEM LISTED | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization | ||||||||||||
| See Section 11 | District 1: Mobilization & Demobilization | District 2: Mobilization & Demobilization | ||||||||||||
| REF # | TYPE: | EQ TYPE PHOTO | ||||||||||||
| (See Instructions Above) | Make: | Model: | Horsepower: | $ / hour | $ / day | $ / week | $ / month | |||||||
| EX | * Bucket Truck A | * Bucket Truck A | 2014 F-750 | Hi-Ranger 55 RearMount | 280 | Based on | ||||||||
| 8 hr day | Based on | |||||||||||||
| 40 hr week | List LowBoy where applicable | Lump Sum | Lump Sum | |||||||||||
| 1A | * Bucket Truck A (50ft min. reach) | 1A (Bucket Truck A) | 2004 International 4300 | Altec 55 Rear Mount | 280 | $10.00 | $75.00 | $350.00 | $1,000.00 | $300.00 | $300.00 | |||
| 1B | * Bucket Truck A (50ft min. reach) | 1B (Bucket Truck A) | 2017 Freightliner | Versalift VO260 Rear Mount | 250 | $10.00 | $75.00 | $350.00 | $1,000.00 | |||||
| 1C | * Bucket Truck A (50ft min. reach) | 1C (Bucket Truck A) | ||||||||||||
| 1D | OPERATOR | $5.00 | $40.00 | $200.00 | $840.00 | |||||||||
| 1E | OPERATOR (Prevailing Wage Rate ***) | $6.00 | $48.00 | $240.00 | $1,008.00 | |||||||||
| 1 | FOR EACH REFERENCE NUMBER, COMPLETE ALL INFORMATION (MAKE, MODEL, HP) ON THE LINE AS IT RELATES TO THE EQUIPMENT "TYPE" (Column B) REQUESTED/DESCRIBED. | |||||||||||||
| 2 | FOR EACH REFERENCE NUMBER, PROVIDE A COST PER TIME REFERENCE AS SHOWN. AT A MINIMUM, THE COST PER HOUR ($/hour) MUST BE COMPLETED FOR THE LINE ITEM TO BE ACCEPTABLE. | |||||||||||||
| 3 | FOR EACH COST PER REFERENCE HOUR PROVIDED FOR A PIECE OF EQUIPMENT, PROVIDE A COST PER REFERENCE HOUR FOR THE OPERATOR. | |||||||||||||
| 4 | MOBILIZATION & DEMOBILIZATION ARE BY DISTRICT. COLUMNS "N" to "Y" | |||||||||||||
| 5 | TRAFFIC CONTROL IS LISTED ON A SEPARATE TAB. | |||||||||||||
| IF NO COST IS PROVIDED, THE COST WILL BE ASSUMED TO BE INLCUSIVE OF THE EQUIPMENT COST. | ||||||||||||||
| REFER TO TERMS FOR CLEAR DESCRIPTION OF EQUIPMENT TYPE REQUESTED FOR EACH LINE ITEM LISTED | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization |
See Section 11
| REF # | TYPE: | EQ TYPE PHOTO | |||||
| (See Instructions Above) | Make: | Model: | Horsepower: | $ / hour | $ / day | $ / week | $ / month |
| LIST SUPPLEMENTAL EQ BELOW | DESCRIPTION OF SUPPLEMENTAL EQUIPMENT | ||||||
| 12A.1 | Crane | 2016 Freightliner National 30 Ton Crane / 500hp | FOR ALL ITEMS LISTED TO THE LEFT, THE PRICING IS TO BE POPULATED BELOW (Starting in row 98) IN THE ROW CORRESPONDING TO THE ITEM NUMBER. | ||||
| 12B.1 | Tracked Lift | 2019 Trackedlift 72' | |||||
| 12C.1 | |||||||
| EQ WILL POPULATE BELOW | |||||||
| IF EQ IS LISTED ABOVE | LINK WILL POPULATE BELOW |
IF EQ IS LISTED ABOVE
| 12A.1 | ** 12A ( Crane ) | ** 12A ( Crane ) | 2016 Freightliner | National 30 Ton Crane | 500 | $10.00 | $75.00 | $350.00 | $1,000.00 |
| 12A.2 | OPERATOR | $5.00 | $40.00 | $200.00 | $840.00 | ||||
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | $6.00 | $48.00 | $240.00 | $1,008.00 | ||||
| 1 | FOR REFERENCE NUMBER #12A-X, LIST ANY ADDITIONAL EQUIPMENT TYPE AND A DESCRIPTION IN STARTING IN ROW 77. | ||||||||
| 2 | FOR EACH REFERENCE NUMBER #12A-X, LISTED BEGINNING ON ROW 77, THE INFORMATION WILL POPULATE BELOW BEGINNNING IN ROW 98. IN THIS AREA , COMPLETE THE INFORMATION (MAKE, MODEL, HP) ON THE LINE AS IT RELATES TO THE EQUIPMENT "TYPE" (Column B) . | ||||||||
| 3 | FOR EACH REFERENCE NUMBER, PROVIDE A COST PER TIME REFERENCE AS SHOWN. AT A MINIMUM, THE COST PER HOUR ($/hour) MUST BE COMPLETED FOR THE LINE ITEM TO BE ACCEPTABLE. | ||||||||
| 4 | FOR EACH COST PER REFERENCE HOUR PROVIDED FOR A PIECE OF EQUIPMENT, PROVIDE A COST PER REFERENCE HOUR FOR THE OPERATOR. | ||||||||
| 5 | MOBILIZATION & DEMOBILIZATION ARE BY DISTRICT. COLUMNS "N" to "Y" | ||||||||
| 6 | TRAFFIC CONTROL IS LISTED ON A SEPARATE TAB. | ||||||||
| IF NO COST IS PROVIDED, THE COST WILL BE ASSUMED TO BE INLCUSIVE OF THE EQUIPMENT COST. |
1B (Bucket Truck A) 1C (Bucket Truck A) 1A (Bucket Truck A) ** 12A ( Crane )
PRICING
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | ||
| Vendor Name: | A-1 Tree Care | PRICING OF EQUIPMENT AND LABOR (OPERATORS, OPERATOR w/PREV WG., GROUNDSMEN) ARE SEPARATED. |
PROVIDE PRICING FOR EQ & LB FOR EACH
PIECE OF EQUIPMENT YOU CHOOSE TO BID.
VENDOR PERSONNEL WILL BE
| USED FOR ALL EQUIPMENT. | REFER TO SECTION 11 OF THE SPECIFICATIONS FOR MOBILIZATION & DEMOBILIZATION. | |
| A PHOTO MUST BE SUBMITTED FOR EACH PIECE OF EQUIPMENT BID. (See 9.15) |
Photo is to be inserted in the corresponding tab as indicated by the REF # in column A
1) Click on the link in column C, which represents the equipment type
2) This will take you directly to the corresponding tab of the REF # (column A).
3) Insert or Paste the photo on the corresponding tab.
4) To return to the pricing page, click on the link in cell 1A of the TAB you are in.
5) Repeat the process for each piece of equipment you wish to bid.
| Do you have a certified arborist on staff? | |||||
| Yes or No -------------> | Yes | PRICING | Mobilization & Demobilization | ||
| REFER TO TERMS FOR CLEAR DESCRIPTION OF EQUIPMENT TYPE REQUESTED FOR EACH LINE ITEM LISTED | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization |
See Section 11
| See Item #15A | District 1: Mobilization & Demobilization | District 2: Mobilization & Demobilization | District 3: Mobilization & Demobilization | District 4: Mobilization & Demobilization | District 5: Mobilization & Demobilization | District 6: Mobilization & Demobilization | District 7: Mobilization & Demobilization | District 8: Mobilization & Demobilization | District 9: Mobilization & Demobilization | District 10: Mobilization & Demobilization | District 11: Mobilization & Demobilization | District 12: Mobilization & Demobilization | |||||||||
| REF # | TYPE: | EQ TYPE PHOTO | |||||||||||||||||||
| (See Instructions Above) | Make: | Model: | Horsepower: | $ / hour | $ / day | $ / week | $ / month | ||||||||||||||
| EX | * Bucket Truck A | * Bucket Truck A | 2014 F-750 | Hi-Ranger 55 RearMount | 280 | Based on | |||||||||||||||
| 8 hr day | Based on | ||||||||||||||||||||
| 40 hr week | LowBoy? | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | ||||||||
| 1A | * Bucket Truck A (50ft min. reach) | 1A (Bucket Truck A) | 2007 GMC | C7500 Bucket | 240 | $100.00 | $800.00 | $4,000.00 | $16,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 1B | * Bucket Truck A (50ft min. reach) | 1B (Bucket Truck A) | 2008 GMC | C7500 Bucket | 275 | $100.00 | $800.00 | $4,000.00 | $16,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 1C | * Bucket Truck A (50ft min. reach) | 1C (Bucket Truck A) | |||||||||||||||||||
| 1D | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 1E | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 2A | * Bucket Truck B (70ft min. reach) | 2A (Bucket Truck B) | 2005 Freightliner | M2 Elevator Lift Truck | 200-325 | $125.00 | $1,000.00 | $5,000.00 | $20,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 2B | * Bucket Truck B (70ft min. reach) | 2B (Bucket Truck B) | |||||||||||||||||||
| 2C | * Bucket Truck B (70ft min. reach) | 2C (Bucket Truck B) | |||||||||||||||||||
| 2D | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 2E | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 3A | * Single blade Power Tree Shearing Service | 3A (Single blade P.T.S.) | 2024 Kershaw | SkyTrim 75x Telescopic Tree Saw | 150-200 | $125.00 | $1,000.00 | $5,000.00 | $20,000.00 | $3,500.00 | $2,500.00 | $2,500.00 | $1,500.00 | $1,500.00 | $3,500.00 | ||||||
| 3B | * Single blade Power Tree Shearing Service | 3B (Single blade P.T.S.) | 2006 Kershaw | SkyTrim 75x Telescopic Tree Saw | 150-200 | $125.00 | $1,000.00 | $5,000.00 | $20,000.00 | $3,500.00 | $2,500.00 | $2,500.00 | $1,500.00 | $1,500.00 | $3,500.00 | ||||||
| 3C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 3D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 4A | * Mulcher Mower | 4A (Mulcher Mower) | 2015 Rayco | C160 | 160 | $350.00 | $2,800.00 | $14,000.00 | $56,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 4B | * Mulcher Mower | 4B (Mulcher Mower) | 2015 Rayco | C100 | 100 | $200.00 | $1,600.00 | $8,000.00 | $32,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 4C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 4D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 5A | * Tree Care Handler with Grapple Saw | 5A (Tree Handler w/ Grapple Saw) | |||||||||||||||||||
| 5B | * Tree Care Handler with Grapple Saw | 5B (Tree Handler w/ Grapple Saw) | |||||||||||||||||||
| 5C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 5D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 6A | * Clam Fork Vehicle | 6A (Clam Fork Vehicle) | 2017 Kubota | SVL95-2SHFC Skid Steer | 95 | $65.00 | $520.00 | $2,600.00 | $10,400.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 6B | * Clam Fork Vehicle | 6B (Clam Fork Vehicle) | |||||||||||||||||||
| 6C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 6D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 7A | * Brush Chipper A (see 10.3) with truck, chip box | 7A (Brush Chipper A / truck / chip box | 2015 Morbark/GMC | M20R Chipper/C4500 Chip Truck | 380 | $200.00 | $1,600.00 | $8,000.00 | $32,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 7B | * Brush Chipper A (see 10.3) with truck, chip box | 7B (Brush Chipper A / truck / chip box | |||||||||||||||||||
| 7C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 7D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 8A | * Brush Chipper B (See 10.3) with truck, chip box | 8A (Brush Chipper A / truck / chip box | 2016 Bandit/2008 Chevy | 150XP Disc Chipper/C4500 Chip Truck | 140 | $125.00 | $1,000.00 | $5,000.00 | $20,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 8B | * Brush Chipper B (See 10.3) with truck, chip box | 8B (Brush Chipper A / truck / chip box | 2010 Bandit X2/2020 Chevy | 200XP Chipper/C4500 Chip Truck | 125 | $125.00 | $1,000.00 | $5,000.00 | $20,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 8C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 8D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 9A | * Stump Cutter | 9A (Stump Cutter) | 2016 Rayco | RG100X Stump Grinder | 99 | $250.00 | $2,000.00 | $10,000.00 | $40,000.00 | $450.00 | $350.00 | $350.00 | $200.00 | $200.00 | $450.00 | ||||||
| 9B | * Stump Cutter | 9B (Stump Cutter) | 2015 Rayco | RG 100X Stump Grinder | 99 | $250.00 | $2,000.00 | $10,000.00 | $40,000.00 | $450.00 | $350.00 | $350.00 | $200.00 | $200.00 | $450.00 | ||||||
| 9C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 9D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 10A | * Log Loader | 10A (Log Loader) | 2007 Mack | CL733 Grapple Truck | 500-550 | $150.00 | $1,200.00 | $6,000.00 | $24,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 10B | * Log Loader | 10B (Log Loader) | 2008 Peterbilt | 340 Grapple Truck | 400 | $150.00 | $1,200.00 | $6,000.00 | $24,000.00 | $550.00 | $425.00 | $425.00 | $250.00 | $250.00 | $550.00 | ||||||
| 10C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 10D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 11A | * Iron Horse | 11A (Iron Horse) | Vemeer | ATX 530 | $50.00 | $400.00 | $2,000.00 | $8,000.00 | $450.00 | $350.00 | $350.00 | $200.00 | $200.00 | $450.00 | |||||||
| 11B | * Iron Horse | 11B (Iron Horse) | |||||||||||||||||||
| 11C | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | ||||||||||||||||
| 11D | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | ||||||||||||||||
| 13A | GROUNDSMEN | $59.00 | $472.00 | $2,360.00 | $9,440.00 | ||||||||||||||||
| 13B | GROUNDSMEN (Prevailing Wage Rate ***) | $91.00 | $728.00 | $3,640.00 | $14,560.00 | ||||||||||||||||
| Lump Sum |
Per Day
| 15A | LOWBOY TRANSPORT (Lump Sum per Day) | LOWBOY TRANSPORT (Lump Sum per Day) | $2,000.00 | ||
| LOWBOY | |||||
| LIST SUPPLEMENTAL EQ BELOW | DESCRIPTION OF SUPPLEMENTAL EQUIPMENT | ||||
| 12A.1 | 2015 Fecon FTX128L (HP 130) | Forestry Mulcher/Winch | FOR ALL ITEMS LISTED TO THE LEFT, THE PRICING IS TO BE POPULATED BELOW (Starting in row 98) IN THE ROW CORRESPONDING TO THE ITEM NUMBER. | ||
| 12B.1 | 2008 Timber Jack 460 Skidder (HP 157) | ||||
| 12C.1 | 2020 Platform Aerial Lift Bucket (HP 25) | ||||
| 12D.1 | 1999 Kenworth Rollback Truck | ||||
| 12E.1 | 2020 Yanmar SV100-2A Excavator w/ Mulch Head (HP 80) | ||||
| 12F.1 | C3500 Flatbed 4x4 Truck x2 | ||||
| 12G.1 | Komatsu 430L Tree Feller | ||||
| 12H.1 | 2003 John Deere 400G Dozer (HP 50-60) | ||||
| 12J.1 | |||||
| 12K.1 | |||||
| 12L.1 | |||||
| 12M.1 | |||||
| 12N.1 | |||||
| 12P.1 | |||||
| 12Q.1 | |||||
| 12R.1 | |||||
| 12S.1 | |||||
| 12T.1 | |||||
| 12V.1 | |||||
| 12X.1 | |||||
| EQ WILL POPULATE BELOW | |||||
| IF EQ IS LISTED ABOVE | LINK WILL POPULATE BELOW |
IF EQ IS LISTED ABOVE
| 12A.1 | ** 12A ( 2015 Fecon FTX128L (HP 130) ) | ** 12A ( 2015 Fecon FTX128L (HP 130) ) | $275.00 | $2,200.00 | $11,000.00 | $44,000.00 | $550.00 | $425.00 | $425.00 | $150.00 | $150.00 | $550.00 |
| 12A.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12B.1 | ** 12B ( 2008 Timber Jack 460 Skidder (HP 157) ) | ** 12B ( 2008 Timber Jack 460 Skidder (HP 157) ) | $200.00 | $1,600.00 | $8,000.00 | $32,000.00 | $3,500.00 | $2,500.00 | $2,500.00 | $1,500.00 | $1,500.00 | $3,500.00 |
| 12B.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12B.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12C.1 | ** 12C ( 2020 Platform Aerial Lift Bucket (HP 25) ) | ** 12C ( 2020 Platform Aerial Lift Bucket (HP 25) ) | $125.00 | $1,000.00 | $5,000.00 | $20,000.00 | $450.00 | $350.00 | $350.00 | $100.00 | $100.00 | $450.00 |
| 12C.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12C.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12D.1 | ** 12D ( 1999 Kenworth Rollback Truck ) | ** 12D ( 1999 Kenworth Rollback Truck ) | $50.00 | $400.00 | $2,000.00 | $8,000.00 | $450.00 | $350.00 | $350.00 | $100.00 | $100.00 | $450.00 |
| 12D.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12D.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12E.1 | ** 12E ( 2020 Yanmar SV100-2A Excavator w/ Mulch Head (HP 80) ) | ** 12E ( 2020 Yanmar SV100-2A Excavator w/ Mulch Head (HP 80) ) | $75.00 | $600.00 | $3,000.00 | $12,000.00 | $550.00 | $425.00 | $425.00 | $150.00 | $150.00 | $550.00 |
| 12E.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12E.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12F.1 | ** 12F ( C3500 Flatbed 4x4 Truck x2 ) | ** 12F ( C3500 Flatbed 4x4 Truck x2 ) | $100.00 | $800.00 | $4,000.00 | $16,000.00 | $550.00 | $425.00 | $425.00 | $150.00 | $150.00 | $550.00 |
| 12F.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12F.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12G.1 | ** 12G ( Komatsu 430L Tree Feller ) | ** 12G ( Komatsu 430L Tree Feller ) | $500.00 | $4,000.00 | $20,000.00 | $80,000.00 | $3,500.00 | $2,500.00 | $2,500.00 | $1,500.00 | $1,500.00 | $3,500.00 |
| 12G.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12G.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12H.1 | ** 12H ( 2003 John Deere 400G Dozer (HP 50-60) ) | ** 12H ( 2003 John Deere 400G Dozer (HP 50-60) ) | $60.00 | $480.00 | $2,400.00 | $9,600.00 | $550.00 | $425.00 | $425.00 | $150.00 | $150.00 | $550.00 |
| 12H.2 | OPERATOR | $64.00 | $512.00 | $2,560.00 | $10,240.00 | |||||||
| 12H.3 | OPERATOR (Prevailing Wage Rate ***) | $96.00 | $768.00 | $3,840.00 | $15,360.00 | |||||||
| 12J.1 | $0.00 | $0.00 | ||||||||||
| 12J.2 | OPERATOR | |||||||||||
| 12J.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12K.1 | $0.00 | $0.00 | ||||||||||
| 12K.2 | OPERATOR | |||||||||||
| 12K.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12L.1 | $0.00 | $0.00 | ||||||||||
| 12L.2 | OPERATOR | |||||||||||
| 12L.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12M.1 | $0.00 | $0.00 | ||||||||||
| 12M.2 | OPERATOR | |||||||||||
| 12M.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12N.1 | $0.00 | $0.00 | ||||||||||
| 12N.2 | OPERATOR | |||||||||||
| 12N.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12P.1 | $0.00 | $0.00 | ||||||||||
| 12P.2 | OPERATOR | |||||||||||
| 12P.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12Q.1 | $0.00 | $0.00 | ||||||||||
| 12Q.2 | OPERATOR | |||||||||||
| 12Q.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12R.1 | $0.00 | $0.00 | ||||||||||
| 12R.2 | OPERATOR | |||||||||||
| 12R.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12S.1 | $0.00 | $0.00 | ||||||||||
| 12S.2 | OPERATOR | |||||||||||
| 12S.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12T.1 | $0.00 | $0.00 | ||||||||||
| 12T.2 | OPERATOR | |||||||||||
| 12T.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12V.1 | $0.00 | $0.00 | ||||||||||
| 12V.2 | OPERATOR | |||||||||||
| 12V.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| 12X.1 | $0.00 | $0.00 | ||||||||||
| 12X.2 | OPERATOR | |||||||||||
| 12X.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||
| * | Rate includes: Service vehicle with fuel, parts & tools needed to support the equipment to perform its operations. | |||||||||||
| ** | For supplemental equipment (along with a brief description of the equipment) that may be utilized for the terms of this contract. Single Asterisk " * " shall be applied to Supplemental equipment. | |||||||||||
| *** | Prevailing wage rates: To only be used on prevailing wage jobs. | |||||||||||
| 12A.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12B.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12C.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12D.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12E.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12F.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12G.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12H.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12J.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12K.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12L.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12M.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12N.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12P.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12Q.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12R.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12S.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12T.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12V.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) | |||||||||||
| 12X.1 | If Applicable, LIST Supplemental ATTACHMENTS (IN THIS CELL) |
1B (Bucket Truck A) 1C (Bucket Truck A) 2A (Bucket Truck B) 2B (Bucket Truck B) 2C (Bucket Truck B) 3A (Single blade P.T.S.)
3B (Single blade P.T.S.)
4A (Mulcher Mower) 4B (Mulcher Mower) 5A (Tree Handler w/ Grapple Saw) 5B (Tree Handler w/ Grapple Saw) 6A (Clam Fork Vehicle) 6B (Clam Fork Vehicle) 7A (Brush Chipper A / truck / chip box 7B (Brush Chipper A / truck / chip box 8A (Brush Chipper A / truck / chip box 8B (Brush Chipper A / truck / chip box 9A (Stump Cutter) 9B (Stump Cutter) 10A (Log Loader) 10B (Log Loader) 11A (Iron Horse) 11B (Iron Horse) ** 12B ( 2008 Timber Jack 460 Skidder (HP 157) ) ** 12C ( 2020 Platform Aerial Lift Bucket (HP 25) ) ** 12D ( 1999 Kenworth Rollback Truck ) ** 12E ( 2020 Yanmar SV100-2A Excavator w/ Mulch Head (HP 80) ) ** 12F ( C3500 Flatbed 4x4 Truck x2 ) ** 12H ( 2003 John Deere 400G Dozer (HP 50-60) ) 1A (Bucket Truck A) ** 12A ( 2015 Fecon FTX128L (HP 130) ) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ** 12G ( Komatsu 430L Tree Feller )
NEW PRICING
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | |
| Vendor Name: | A-1 Tree Care |
| A PHOTO MUST BE SUBMITTED FOR EACH PIECE OF EQUIPMENT BID. (See 9.15) |
Ref # to left and "Type" must be listed on respective photos submitted or photo is saved as the Ref # and "Type (Ref 1A_Bucket_TruckB.jpeg). You may have multiple pieces of the same type of equipment.
See "PHOTO INSTRUCTIONS" tab for details on how to upload Photos/Pictures PRICING OF EQUIPMENT AND LABOR (OPERATORS, OPERATOR w/PREV WG., GROUNDSMEN) ARE SEPARATED.
PROVIDE PRICING FOR EQ & LB FOR EACH PIECE OF EQUIPMENT YOU CHOOSE TO BID.
VENDOR PERSONNEL WILL BE USED FOR ALL EQUIPMENT.
| Do you have a certified arborist on staff? | ||||||||||||||||
| Yes or No -------------> | PRICING | Mobilization & Demobilization | ||||||||||||||
| REF # | TYPE: | Make: | Model: | Horsepower: | Provide a cost per time reference (See Section 4 & 5) | Site to Site Mobilization | ||||||||||
| See Section 11 | District 1: Mobilization & Demobilization | District 2: Mobilization & Demobilization | District 3: Mobilization & Demobilization | District 4: Mobilization & Demobilization | District 5: Mobilization & Demobilization | District 6: Mobilization & Demobilization | District 7: Mobilization & Demobilization | District 8: Mobilization & Demobilization | District 9: Mobilization & Demobilization | District 10: Mobilization & Demobilization | District 11: Mobilization & Demobilization | District 12: Mobilization & Demobilization | District 12: Equipment Rate per Prevailing wage jobs*** | |||
| $ / hour | $ / day | $ / week | $ / month | |||||||||||||
| EX | * Bucket Truck A | 2014 F-750 | Hi-Ranger 55 RearMount | 280 | Based on | |||||||||||
| 8 hr day | Based on | |||||||||||||||
| 40 hr week | Hourly Rate or LowBoy | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | Lump Sum | $ / hour | ||
| 1A | * Bucket Truck A | Make: Model: Horsepower: | ||||||||||||||
| 1B | * Bucket Truck A | |||||||||||||||
| 1C | * Bucket Truck A | |||||||||||||||
| 1D | OPERATOR | |||||||||||||||
| 1E | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 2A | * Bucket Truck B | |||||||||||||||
| 2B | * Bucket Truck B | |||||||||||||||
| 2C | * Bucket Truck B | |||||||||||||||
| 2D | OPERATOR | |||||||||||||||
| 2E | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 3A | * Single blade Power Tree Shearing Service | |||||||||||||||
| 3B | * Single blade Power Tree Shearing Service | |||||||||||||||
| 3C | OPERATOR | |||||||||||||||
| 3D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 4A | * Mulcher Mower | |||||||||||||||
| 4B | * Mulcher Mower | |||||||||||||||
| 4C | OPERATOR | |||||||||||||||
| 4D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 5A | * Tree Care Handler with Grapple Saw | |||||||||||||||
| 5B | * Tree Care Handler with Grapple Saw | |||||||||||||||
| 5C | OPERATOR | |||||||||||||||
| 5D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 6A | * Clam Fork Vehicle | |||||||||||||||
| 6B | * Clam Fork Vehicle | |||||||||||||||
| 6C | OPERATOR | |||||||||||||||
| 6D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 7A | * Brush Chipper A (see 10.3) with truck, chip box | |||||||||||||||
| 7B | * Brush Chipper A (see 10.3) with truck, chip box | |||||||||||||||
| 7C | OPERATOR | |||||||||||||||
| 7D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 8A | * Brush Chipper B (See 10.3) with truck, chip box | |||||||||||||||
| 8B | * Brush Chipper B (See 10.3) with truck, chip box | |||||||||||||||
| 8C | OPERATOR | |||||||||||||||
| 8D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 9A | * Stump Cutter | |||||||||||||||
| 9B | * Stump Cutter | |||||||||||||||
| 9C | OPERATOR | |||||||||||||||
| 9D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 10A | * Log Loader | |||||||||||||||
| 10B | * Log Loader | |||||||||||||||
| 10C | OPERATOR | |||||||||||||||
| 10D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 11A | * Iron Horse | |||||||||||||||
| 11B | * Iron Horse | |||||||||||||||
| 11C | OPERATOR | |||||||||||||||
| 11D | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12A.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12A.2 | OPERATOR | |||||||||||||||
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12B.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12B.2 | OPERATOR | |||||||||||||||
| 12B.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12C.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12C.2 | OPERATOR | |||||||||||||||
| 12C.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12D.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12D.2 | OPERATOR | |||||||||||||||
| 12D.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12E.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12E.2 | OPERATOR | |||||||||||||||
| 12E.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12F.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12F.2 | OPERATOR | |||||||||||||||
| 12F.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12G.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12G.2 | OPERATOR | |||||||||||||||
| 12G.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 12H.1 | ** Supplemental Equipment (with Description) ---> | |||||||||||||||
| 12H.2 | OPERATOR | |||||||||||||||
| 12H.3 | OPERATOR (Prevailing Wage Rate ***) | |||||||||||||||
| 13A | GROUNDSMEN | |||||||||||||||
| 13B | GROUNDSMEN (Prevailing Wage Rate ***) | |||||||||||||||
| Lump Sum |
Per Day
| 15A | LOWBOY TRANSPORT (Lump Sum per Day) | |
| * | Rate includes: Service vehicle with fuel, parts & tools needed to support the equipment to perform its operations. | |
| ** | List any supplemental equipment (along with a brief description of the equipment) that may be utilized for the terms of this contract. Single Asterisk " * " shall be applied to Supplemental equipment. | |
| *** | Prevailing wage rates: To only be used on prevailing wage jobs. |
Click to
INSERT PHOTOS
Traffic Control
| ITB005B-25 - Tree & Brush Power Shearing, Trimming, Mulching & Removal Services 10/4/24 | DISTRICT | |||||||||||||
| Vendor Name: | A-1 Tree Care | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
| Traffic Control for a lane closure on a two lane road with flaggers. 100’ to 500’ work zone | Lump Sum / Day | $2,650 | $2,650 | $2,650 | $2,650 | $2,650 | $2,650 | |||||||
| Traffic Control for a lane closure on a two lane road with flaggers. 501’ to 1000’ work zone | Lump Sum / Day | $2,900 | $2,900 | $2,900 | $2,900 | $2,900 | $2,900 | |||||||
| Traffic Control for a lane closure on a two lane road with flaggers. 1001’ to 1500’ work zone | Lump Sum / Day | $3,150 | $3,150 | $3,150 | $3,150 | $3,150 | $3,150 | |||||||
| Traffic Control for a lane closure on a two lane road with flaggers. 1501’ to 2000’ work zone | Lump Sum / Day | $3,400 | $3,400 | $3,400 | $3,400 | $3,400 | $3,400 | |||||||
| Provide Pricing for Trafffic Control. See Section 9.4 |
1A Click here to return to Pricing Page PICTURE OF 1A (Bucket Truck A) 2007 GMC, C7500 Bucket, 240
Click here to return to Pricing Page
1B Click here to return to Pricing Page PICTURE OF 1B (Bucket Truck A) 2008 GMC, C7500 Bucket, 275
Click here to return to Pricing Page
1C Click here to return to Pricing Page PICTURE OF 1C (Bucket Truck A) , , Click here to return to Pricing Page
2A Click here to return to Pricing Page PICTURE OF 2A (Bucket Truck B) 2005 Freightliner, M2 Elevator Lift Truck, 200-325
Click here to return to Pricing Page
PULL DATA
| REF | TYPE: | Make: | Model: | Horsepower: | Concatentated Data for Pictures | District 1: /Hour | District 1: /Day | District 1: /Week | District 1: /Month | Site-to-Site Mobilization; minimum 3 hours (/Hour) | District 1: Mobilization & Demobilization (Lump Sum) | District 2: Mobilization & Demobilization (Lump Sum) | District 3: Mobilization & Demobilization (Lump Sum) | District 4: Mobilization & Demobilization (Lump Sum) | District 5: Mobilization & Demobilization (Lump Sum) | District 6: Mobilization & Demobilization (Lump Sum) | District 7: Mobilization & Demobilization (Lump Sum) | District 8: Mobilization & Demobilization (Lump Sum) | District 9: Mobilization & Demobilization (Lump Sum) | District 10: Mobilization & Demobilization (Lump Sum) | District 11: Mobilization & Demobilization (Lump Sum) | District 12: Mobilization & Demobilization (Lump Sum) |
| 1A | * Bucket Truck A (50ft min. reach) | 2007 GMC | C7500 Bucket | 240 | 2007 GMC, C7500 Bucket, 240 | 100 | 800 | 4000 | 16000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 1B | * Bucket Truck A (50ft min. reach) | 2008 GMC | C7500 Bucket | 275 | 2008 GMC, C7500 Bucket, 275 | 100 | 800 | 4000 | 16000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 1C | * Bucket Truck A (50ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1D | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 1E | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 2A | * Bucket Truck B (70ft min. reach) | 2005 Freightliner | M2 Elevator Lift Truck | 200-325 | 2005 Freightliner, M2 Elevator Lift Truck, 200-325 | 125 | 1000 | 5000 | 20000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 2B | * Bucket Truck B (70ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2C | * Bucket Truck B (70ft min. reach) | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2D | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 2E | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 3A | * Single blade Power Tree Shearing Service | 2024 Kershaw | SkyTrim 75x Telescopic Tree Saw | 150-200 | 2024 Kershaw, SkyTrim 75x Telescopic Tree Saw, 150-200 | 125 | 1000 | 5000 | 20000 | 0 | 0 | 0 | 0 | 0 | 3500 | 2500 | 2500 | 1500 | 1500 | 3500 | 0 | 0 |
| 3B | * Single blade Power Tree Shearing Service | 2006 Kershaw | SkyTrim 75x Telescopic Tree Saw | 150-200 | 2006 Kershaw, SkyTrim 75x Telescopic Tree Saw, 150-200 | 125 | 1000 | 5000 | 20000 | 0 | 0 | 0 | 0 | 0 | 3500 | 2500 | 2500 | 1500 | 1500 | 3500 | 0 | 0 |
| 3C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 3D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4A | * Mulcher Mower | 2015 Rayco | C160 | 160 | 2015 Rayco, C160, 160 | 350 | 2800 | 14000 | 56000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 4B | * Mulcher Mower | 2015 Rayco | C100 | 100 | 2015 Rayco, C100, 100 | 200 | 1600 | 8000 | 32000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 4C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 5A | * Tree Care Handler with Grapple Saw | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5B | * Tree Care Handler with Grapple Saw | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 5D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6A | * Clam Fork Vehicle | 2017 Kubota | SVL95-2SHFC Skid Steer | 95 | 2017 Kubota, SVL95-2SHFC Skid Steer, 95 | 65 | 520 | 2600 | 10400 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 6B | * Clam Fork Vehicle | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 6C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 7A | * Brush Chipper A (see 10.3) with truck, chip box | 2015 Morbark/GMC | M20R Chipper/C4500 Chip Truck | 380 | 2015 Morbark/GMC, M20R Chipper/C4500 Chip Truck, 380 | 200 | 1600 | 8000 | 32000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 7B | * Brush Chipper A (see 10.3) with truck, chip box | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 7C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 7D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 8A | * Brush Chipper B (See 10.3) with truck, chip box | 2016 Bandit/2008 Chevy | 150XP Disc Chipper/C4500 Chip Truck | 140 | 2016 Bandit/2008 Chevy, 150XP Disc Chipper/C4500 Chip Truck, 140 | 125 | 1000 | 5000 | 20000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 8B | * Brush Chipper B (See 10.3) with truck, chip box | 2010 Bandit X2/2020 Chevy | 200XP Chipper/C4500 Chip Truck | 125 | 2010 Bandit X2/2020 Chevy, 200XP Chipper/C4500 Chip Truck, 125 | 125 | 1000 | 5000 | 20000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 8C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 8D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 9A | * Stump Cutter | 2016 Rayco | RG100X Stump Grinder | 99 | 2016 Rayco, RG100X Stump Grinder, 99 | 250 | 2000 | 10000 | 40000 | 0 | 0 | 0 | 0 | 0 | 450 | 350 | 350 | 200 | 200 | 450 | 0 | 0 |
| 9B | * Stump Cutter | 2015 Rayco | RG 100X Stump Grinder | 99 | 2015 Rayco, RG 100X Stump Grinder, 99 | 250 | 2000 | 10000 | 40000 | 0 | 0 | 0 | 0 | 0 | 450 | 350 | 350 | 200 | 200 | 450 | 0 | 0 |
| 9C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 9D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 10A | * Log Loader | 2007 Mack | CL733 Grapple Truck | 500-550 | 2007 Mack, CL733 Grapple Truck, 500-550 | 150 | 1200 | 6000 | 24000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 10B | * Log Loader | 2008 Peterbilt | 340 Grapple Truck | 400 | 2008 Peterbilt, 340 Grapple Truck, 400 | 150 | 1200 | 6000 | 24000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 250 | 250 | 550 | 0 | 0 |
| 10C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 10D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 11A | * Iron Horse | Vemeer | ATX 530 | 0 | Vemeer, ATX 530, | 50 | 400 | 2000 | 8000 | 0 | 0 | 0 | 0 | 0 | 450 | 350 | 350 | 200 | 200 | 450 | 0 | 0 |
| 11B | * Iron Horse | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 11C | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 11D | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12A.1 | ** 12A ( 2015 Fecon FTX128L (HP 130) ) | 0 | 0 | 0 | , , | 275 | 2200 | 11000 | 44000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 150 | 150 | 550 | 0 | 0 |
| 12A.2 | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12A.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12B.1 | ** 12B ( 2008 Timber Jack 460 Skidder (HP 157) ) | 0 | 0 | 0 | , , | 200 | 1600 | 8000 | 32000 | 0 | 0 | 0 | 0 | 0 | 3500 | 2500 | 2500 | 1500 | 1500 | 3500 | 0 | 0 |
| 12B.2 | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12B.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12C.1 | ** 12C ( 2020 Platform Aerial Lift Bucket (HP 25) ) | 0 | 0 | 0 | , , | 125 | 1000 | 5000 | 20000 | 0 | 0 | 0 | 0 | 0 | 450 | 350 | 350 | 100 | 100 | 450 | 0 | 0 |
| 12C.2 | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12C.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12D.1 | ** 12D ( 1999 Kenworth Rollback Truck ) | 0 | 0 | 0 | , , | 50 | 400 | 2000 | 8000 | 0 | 0 | 0 | 0 | 0 | 450 | 350 | 350 | 100 | 100 | 450 | 0 | 0 |
| 12D.2 | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12D.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12E.1 | ** 12E ( 2020 Yanmar SV100-2A Excavator w/ Mulch Head (HP 80) ) | 0 | 0 | 0 | , , | 75 | 600 | 3000 | 12000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 150 | 150 | 550 | 0 | 0 |
| 12E.2 | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12E.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12F.1 | ** 12F ( C3500 Flatbed 4x4 Truck x2 ) | 0 | 0 | 0 | , , | 100 | 800 | 4000 | 16000 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 150 | 150 | 550 | 0 | 0 |
| 12F.2 | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12F.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12H.1 | ** 12H ( 2003 John Deere 400G Dozer (HP 50-60) ) | 0 | 0 | 0 | , , | 60 | 480 | 2400 | 9600 | 0 | 0 | 0 | 0 | 0 | 550 | 425 | 425 | 150 | 150 | 550 | 0 | 0 |
| 12H.2 | OPERATOR | 0 | 0 | 0 | 64 | 512 | 2560 | 10240 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12H.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 96 | 768 | 3840 | 15360 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12X.1 | 0 | 0 | 0 | 0 | , , | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 12X.2 | OPERATOR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 12X.3 | OPERATOR (Prevailing Wage Rate ***) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 13A | GROUNDSMEN | 0 | 0 | 0 | 59 | 472 | 2360 | 9440 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 13B | GROUNDSMEN (Prevailing Wage Rate ***) | 0 | 0 | 0 | 91 | 728 | 3640 | 14560 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 15A | LOWBOY TRANSPORT (Lump Sum per Day) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Hourly Rate | ||||||||||||||||||||||
| LowBoy | ||||||||||||||||||||||
| YES | ||||||||||||||||||||||
| NO | ||||||||||||||||||||||
| YES | ||||||||||||||||||||||
| NO |
2B Click here to return to Pricing Page PICTURE OF 2B (Bucket Truck B) , , Click here to return to Pricing Page
2C Click here to return to Pricing Page PICTURE OF 2C (Bucket Truck B) , , Click here to return to Pricing Page
3A Click here to return to Pricing Page PICTURE OF 3A (Single blade P.T.S.) 2024 Kershaw, SkyTrim 75x Telescopic Tree Saw, 150-200
Click here to return to Pricing Page
3B Click here to return to Pricing Page PICTURE OF 3B (Single blade P.T.S.) 2006 Kershaw, SkyTrim 75x Telescopic Tree Saw, 150-200
Click here to return to Pricing Page
4A Click here to return to Pricing Page PICTURE OF 4A (Mulcher Mower) 2015 Rayco, C160, 160
Click here to return to Pricing Page
4B Click here to return to Pricing Page PICTURE OF 4B (Mulcher Mower) 2015 Rayco, C100, 100
Click here to return to Pricing Page
5A Click here to return to Pricing Page PICTURE OF 5A (Tree Handler w/ Grapple Saw) , , Click here to return to Pricing Page
5B Click here to return to Pricing Page PICTURE OF 5B (Tree Handler w/ Grapple Saw) , , Click here to return to Pricing Page
6A Click here to return to Pricing Page PICTURE OF 6A (Clam Fork Vehicle) 2017 Kubota, SVL95-2SHFC Skid Steer, 95
Click here to return to Pricing Page
6B Click here to return to Pricing Page PICTURE OF 6B (Clam Fork Vehicle) , , Click here to return to Pricing Page
7A Click here to return to Pricing Page PICTURE OF 7A (Brush Chipper A / truck / chip box 2015 Morbark/GMC, M20R Chipper/C4500 Chip Truck, 380
Click here to return to Pricing Page
7B Click here to return to Pricing Page PICTURE OF 7B (Brush Chipper A / truck / chip box , , Click here to return to Pricing Page
8A Click here to return to Pricing Page PICTURE OF 8A (Brush Chipper A / truck / chip box 2016 Bandit/2008 Chevy, 150XP Disc Chipper/C4500 Chip Truck, 140
Click here to return to Pricing Page
8B Click here to return to Pricing Page PICTURE OF 8A (Brush Chipper A / truck / chip box 2010 Bandit X2/2020 Chevy, 200XP Chipper/C4500 Chip Truck, 125
Click here to return to Pricing Page
9A Click here to return to Pricing Page PICTURE OF 9A (Stump Cutter) 2016 Rayco, RG100X Stump Grinder, 99
Click here to return to Pricing Page
9B Click here to return to Pricing Page PICTURE OF 9B (Stump Cutter) 2015 Rayco, RG 100X Stump Grinder, 99
Click here to return to Pricing Page
10A Click here to return to Pricing Page PICTURE OF 10A (Log Loader) 2007 Mack, CL733 Grapple Truck, 500-550
Click here to return to Pricing Page
10B Click here to return to Pricing Page PICTURE OF 10B (Log Loader) 2008 Peterbilt, 340 Grapple Truck, 400
Click here to return to Pricing Page
11A Click here to return to Pricing Page PICTURE OF 11A (Iron Horse) Vemeer, ATX 530, Click here to return to Pricing Page
11B Click here to return to Pricing Page PICTURE OF 11B (Iron Horse) , , Click here to return to Pricing Page
12A
| Click here to return to Pricing Page | PICTURE OF | ** 12A ( 2015 Fecon FTX128L (HP 130) ) | , , |
| Forestry Mulcher/Winch |
Click here to return to Pricing Page
12B
| Click here to return to Pricing Page | PICTURE OF | ** 12B ( 2008 Timber Jack 460 Skidder (HP 157) ) | , , |
| 0 |
Click here to return to Pricing Page
12C
| Click here to return to Pricing Page | PICTURE OF | ** 12C ( 2020 Platform Aerial Lift Bucket (HP 25) ) | , , |
| 0 |
Click here to return to Pricing Page
12D
| Click here to return to Pricing Page | PICTURE OF | ** 12D ( 1999 Kenworth Rollback Truck ) | , , |
| 0 |
Click here to return to Pricing Page
12E
| Click here to return to Pricing Page | PICTURE OF | ** 12E ( 2020 Yanmar SV100-2A Excavator w/ Mulch Head (HP 80) ) | , , |
| 0 |
Click here to return to Pricing Page
12F
| Click here to return to Pricing Page | PICTURE OF | ** 12F ( C3500 Flatbed 4x4 Truck x2 ) | , , |
| 0 |
Click here to return to Pricing Page
12G
| Click here to return to Pricing Page | PICTURE OF | ** 12G ( Komatsu 430L Tree Feller ) | , , |
| 0 |
Click here to return to Pricing Page
12H
| Click here to return to Pricing Page | PICTURE OF | ** 12H ( 2003 John Deere 400G Dozer (HP 50-60) ) | , , |
| 0 |
Click here to return to Pricing Page
12J
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12K
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12L
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12M
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12N
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12P
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12Q
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12R
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12S
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12T
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12V
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
12X
| Click here to return to Pricing Page | PICTURE OF | 0 | , , |
| 0 |
Click here to return to Pricing Page
File details come from the government source that posted it. Updated .