00100000-112816.pdf
PDF 361 KB Posted
- Contract number
- BDY04
- Issued by
- Florida
About this file
This document is a Contract Maintenance Work Document issued by the State of Florida Department of Transportation on March 16, 2011. The contract involves Southeast Attenuators as the contractor, with the work being performed on Interstate I-95 in multiple median locations. The contract number is E4L91-R0, and the specific work order is Unit Work Order #11.
The document details guardrail repair and installation work, including multiple double face panel installations and rub rail work at various mile posts on the I-95 northbound and southbound medians. The work activities include installing double face panels from 0' to 50' at different locations, with additional rub rail installations. The total estimated work units vary by location, ranging from 12.5 to 50 linear feet, with an additional asphalt work item of 1 ton. The contractor completed the work between 3-16-11 and 3-18-11, with work units closely matching the estimated amounts. The contract appears to be a maintenance and repair contract for highway infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-BDY04-00010000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .