00100000-112816.pdf

PDF 361 KB Posted

Attached to
Master Agreement FL|C8V30|654572ea75020ce30b21b7bc6104cf84
Contract number
C8V30
Issued by
Florida

About this file

This document is a Contract Maintenance Work Document from the State of Florida Department of Transportation, dated March 16, 2011. The contract involves Southeast Attenuators as the contractor, with the work being performed on Interstate I-95 in multiple median locations. The contract number is E4L91-R0, and the specific work order is Work Order #11.

The document details guardrail repair and installation work, including multiple tasks such as Double Face Panel installations (0' to 50') and Rub Rail work at various mile points along the I-95 median (both northbound and southbound). The work locations span from MP 95.010 to MP 96.587, with a total of six separate guardrail panel and rub rail installations. Additionally, there is one asphalt-related task listed for all locations. The estimated and actual work units are tracked, with most Double Face Panel and Rub Rail installations measuring between 12.5 and 50 linear feet (LF). The total work was completed on 3/18/11, with the contractor certified as correct and the document verified by an inspector.

View the file

Other files

File Type Posted
CN-550000-C8V30-00010000.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .