FM 565 TXDOT Road Improvements - Bid Documents Summary
This is a bid contract document package for the construction of FM 565 TXDOT Road Improvements, issued by Ameriport LLC on behalf of Chambers County Improvement District No. 2 in Chambers County, Texas. The project encompasses site preparation, storm sewer system installation, water distribution and sanitary sewer systems, roadway construction, storm water pollution prevention, and demolition work along FM 565. The scope includes mobilization, clearing and grubbing, installation of various pipe systems (24-inch, 18-inch RCP and corrugated metal piping), concrete pavement, hot mix asphalt overlay, curbs, signage, pavement markings, and erosion control measures. A mandatory in-person pre-bid meeting is scheduled for 11:00 AM on Thursday, September 3, 2026, at Ward, Getz & Associates LLC, 2500 Tanglewilde, Suite 120, Houston, Texas 77063. Sealed bids must be submitted through www.civcast.com by 11:00 AM on Thursday, September 10, 2026. Contract award will be made within 60 days after the bid opening date. The successful bidder must achieve Final Completion within a specified number of calendar days from the Notice to Proceed, with phases for Substantial Completion and Final Completion as identified in the bid proposal.
Each bid must be accompanied by a bid bond or certified check equal to five percent of the total bid amount. The successful bidder must furnish Performance, Payment, and Maintenance Bonds each at 100 percent of the Contract Price from a surety company holding a permit from the State of Texas with a minimum Best Key Rating of "B+" or better. Bidders must provide evidence of out-of-state corporation authorization to conduct business in Texas, state contractor license numbers, and a completed Texas Ethics Commission Form 1295 with an assigned certificate number. The contract requires compliance with Texas prevailing wage rates as specified in the Special Conditions, with penalties of $60.00 per worker per day for non-compliance. Owner is exempt from Texas sales and use taxes under Texas Tax Code Section 151.309, and the Contractor must pass on cost savings related to exempt purchases. The project is located in Chambers County, Texas, and falls under the jurisdiction of the City of Baytown ETJ. Contract documents include detailed specifications prepared by Ward, Getz & Associates LLC (Texas Registered Engineering Firm F-9756), with Engineer Sara Karouni as the Professional Engineer of Record.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR CONSTRUCTION OF
FM 565 TXDOT ROAD IMPROVEMENTS
FOR
AMERIPORT LLC
ON BEHALF OF
CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
IN
CITY OF BAYTOWN ETJ, CHAMBERS COUNTY, TEXAS
AUGUST 2026
Ward, Getz & Associates LLC
TX Registered Engineering Firm F-9756
2500 Tanglewilde, Suite 120
Houston, Texas 77063
Project No. 00043-041-005
145244
SARA KAROUNI
P R
O
F E S S O A L NG IN
E E
R
E
STATE OF TEXAS
N
L I C E N S E D
I
08/19/2026 F-9756
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
FM 565 TXDOT ROAD IMPROVEMENTS
FOR
AMERIPORT LLC
ON BEHALF OF
CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
TABLE OF CONTENTS
I INVITATION TO BIDDERS
II INSTRUCTIONS TO BIDDERS
III BID FORM
IV AGREEMENT
V PERFORMANCE BOND
VI PAYMENT BOND
VII MAINTENANCE BOND
VIII GENERAL CONDITIONS OF THE AGREEMENT
IXA SPECIAL CONDITIONS OF THE AGREEMENT (PART A)
IXB SPECIAL CONDITIONS OF THE AGREEMENT (PART B)
IXC REQUIRED CONTRACT PROVISIONS
AMERIPORT, LLC OBO CCID NO. 2 INVITATION TO BIDDERS
Invitation To Bidders FINAL I June 13, 2023
INVITATION TO BIDDERS
Ameriport, LLC on behalf of Chambers County Improvement District No. 2 (Owner) is requesting Bids for the construction of the following Project:
Construction of FM 565 TXDOT Road Improvements 00043-041-005
A Mandatory Pre-Bid meeting will be conducted in-person at Ward, Getz & Associates LLC, 2500 Tanglewilde, Suite 120, Houston, TX 77063 at 11:00 AM, Thursday, September 3, 2026.
Attendance by each prospective bidder or its representative at the pre-bid meeting is
MANDATORY.
Sealed bids addressed to Ameriport, LLC on behalf of Chambers County Improvement District No. 2 should be submitted through www.civcast.com and will be accepted until 11:00 AM, Thursday, September 10, 2026, at which time all bids will be opened and publicly read for the furnishing of all material, equipment, labor and supervision necessary or incidental for the construction of FM 565 TXDOT Road Improvements Bids received after the closing time will be returned unopened. The conference call number is (346) 333-2857. The access code is 787 055 651#.
Plans, specifications, and bid documents for the bid opening will be available at www.civcast.com, search; PROJECT # 00043-041-005
By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to through the use of an Electronic Signature, as defined by and in accordance with the Owner’s Electronic Signature Rules for Construction Contracts.
The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in the bidding or bidding process except the time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Owner’s judgment will be most advantageous to, and result in, the best and most economical completion of the Project
Each Bid must be accompanied by a Bid Bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. Bidder must register on this website in order to submit a Bid and bid security.
INSTRUCTIONS TO BIDDERS
II - 1
INSTRUCTIONS TO BIDDERS
1. PREPARATION OF BIDS. Unless otherwise directed in the Invitation to Bidders, each Bid shall be submitted, in duplicate, on the bid forms provided or on photocopies of the forms, in conformity with the requirements of the Invitation to Bidders, these instructions, and the instructions printed on the bid form.
All blanks on the bid form shall be completed, typed, or written in ink, and no change shall be made on the bid form or any other of the Contract Documents. All amounts shall be written in figures, with amounts extended and totaled. Minimum unit prices have been established for certain items shown on the bid. See Paragraph 7 of these instructions. If the bidder chooses not to bid on optional items (if any), “No Bid” shall be entered in the bid space. Any Bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if any of the prices are obviously unbalanced; or if it shall, in any manner, fail to conform to the conditions of the Invitation to bidders and these instructions.
The bidder shall sign its Bid in the signature space. If the Bid is made by a partnership or corporation, the name and address of the partnership or corporation shall be shown, together with the names and addresses of the partners or officers. If the Bid is made by an individual, it must be executed by that person; if made by a partnership, it must be executed by one of the partners (and if by a limited partnership, then executed by the general partner); or if made by a corporation, it must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or assistant secretary of the corporation. The corporate address and state of incorporation must be shown below the signature.
When applicable, evidence of authority to conduct business as an out-of-state corporation in the State of Texas shall be provided in accordance with the paragraph entitled QUALIFICATION OF BIDDERS. State Contractor license number, if any, must also be shown.
The Bid and the Bid Security must be enclosed in a sealed envelope, plainly identified on the outside with the contents (i.e. Bid or Bid Security), the bidder’s name, and the job name and number, and addressed to the Owner as prescribed in the Invitation to Bidders.
2. CONTRACT DOCUMENTS. The Contract Documents are complementary and must be read together as a whole; what is called for by one is as binding as if called for by all.
Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.civcastusa.com system for such information to Engineer not less than 72 hours before the Bid opening. Answers to these requests will be given, in writing, to all bidders as addenda to the Contract, and each addendum will be made a part of the Contract. No explanation or interpretation of the Contract, other than written addenda, shall be binding.
Should a bidder find discrepancies in or omissions from the Contract Documents or should the bidder be in doubt as to any meaning, the bidder is hereby obligated to notify Engineer, so a written addendum may be sent to all bidders. It is the responsibility of each bidder to determine if it has received all addenda, complete files of which will be maintained at the Engineer’s office and the office designated to receive the Bids.
II - 2
Each bidder shall inform itself fully of the construction and labor conditions under which the Work will be performed and shall be presumed to have inspected the Site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all materials and labor necessary to carry out the provision of the Contract and to complete the Work for the consideration of its Bid.
3. PRE-BID CONFERENCE. There will be no pre-bid conference.
4. BID SECURITY. Each Bid shall be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than 5 % of the total amount bid (the “Bid Security”), as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within 7 days after the date Contract Documents are received by the Contractor. Bid Securities will be returned to all but the three most qualified, responsible bidders within 5 days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract. The surety company providing a bid bond must conform to the same requirements for surety companies providing the performance bonds, maintenance bonds and/or payment bonds described below.
5. BONDS. The successful bidder must furnish a Performance and a Payment Bond, each in the sum of 100 percent of the Contract Price, from a surety company holding a permit from the State of Texas to act as surety. Unless otherwise specified, the cost of proving such Bonds shall be included in the bidders total bid amount. The surety company must have a minimum Best Key Rating of “B+” or better. The surety company, the agency and agent issuing the Bonds must be authorized to issue Bonds in Texas in an amount equal to the total Contract Price and such authorization must be recorded in the files of the Texas Department of Insurance. The Bonds must be executed by a duly appointed representative of the surety company licensed by the State of Texas as a General Lines Agent and such licensing must be recorded in the files of the Texas Department of Insurance. If the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the rules and regulations of the Treasury Department with respect to performance and payment bonds for federal jobs, including specifically the rules related to underwriting limitation. For contracts over $100,000, the surety must also hold a certificate of authority from the United States Secretary of Treasury to qualify as a surety on obligations permitted or required under federal law, or have obtained reinsurance for any liability in excess of $1,000,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of authority from the United States Secretary of Treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. If bidder’s proposed surety company, agency or agents do not meet the aforementioned requirements, then Owner may refrain from considering the bidder for Contract award and Owner may require bidder to forfeit the Bid Security.
6. DELIVERY OF BIDS. It is each bidder’s responsibility to deliver its Bid and Bid Security to the location named in the Invitation to Bidders before the closing time. The fact that a Bid and Bid Security were dispatched will not be considered. The Bid and Bid Security must actually be delivered to be considered.
7. “OR EQUAL” SUBMISSIONS. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but to set a definite standard of quality or performance. In preparing his/her proposal, each bidder is expected to include in his/her base Bid the cost of the item so specified.
II - 3
However, in certain Technical Specification sections, manufacturers are listed followed by “or equal.” In certain other Technical Specification sections, manufacturers are listed with “or equal” not included. In those items where “or equal” is not included, it is hereby added and understood to be included, even though not specifically stated in each and every Technical Specification. If a Contractor chooses to submit a suggested “or equal” product in lieu of a product by one of the named manufacturers, Owner will evaluate the item to determine if it is an equal. The Contractor is responsible for providing all data required to evaluate an item submitted as a suggested “or equal.” Owner’s decision on whether an unnamed manufacturer is an “equal” is to be final. No claims for additional cost, time delay, etc. will be accepted if an unnamed manufacturer is submitted by Contractor as a suggested “equal” and Owner decides the item is not “equal.”
Contractor must submit list of items to be submitted as a suggested “or equal” at time of bid submission. No additional suggested “or equal” items will be considered after bid opening.
8. MINIMUM AND EXTRA UNIT PRICE ITEMS. If the approximate quantity and a minimum unit price have been established for items as shown in the Bid, the bidder may not bid a unit price less than the minimum value; however, it may bid an amount greater than the minimum unit price.
If no entry is made in the spaces provided, the minimum unit prices shown shall apply. These Extra Unit Price Items are included to facilitate payment for changes and alterations that may be required to complete the Work. The Work, as provided by the Contract Documents, is described in bid items other than Extra Unit Price Items. When additional Work covered by Extra Unit Price Items is performed, payment will be based on the quantity actually constructed and the unit prices entered in the Bid.
9. TIME FOR COMPLETION. Contractor will not be allowed time extensions that are due to
(i) inclement weather (not including Force Majeure); (ii) non-availability of equipment or material, when the principal units of Work and tasks on the critical path are not in progress or are not delayed by the event of delay, interference, disruption, or hindrance; (iii) when at least seven (7) hours of available working time remain out of the working day; (iv) while materials are drying and it is possible for the Contractor to enclose the area and use drying devices; (v) when an event of delay, interference, disruption, or hindrance occurs on a day other than a working day or other day when the Contractor had not originally planned to work; (vi) when an event of delay, interference, disruption, or hindrance occurs after the expiration of the time for completion; (vii) to the extent the Contractor could have anticipated or alleviated the impact of the event of delay, interference, disruption, or hindrance through reasonable efforts; (viii) when events of concurrent delay overlap the claimed delay; and/or (ix) when an extension of time is precluded by any other provision of the Contract Documents.
9A. IDENTIFICATION, SUBSTITUTION OF SUBCONTRACTORS. Every bidder shall submit as part of the bid the names and addresses of the subcontractors with whom the bidder, if awarded the contract, will subcontract for performance of any work for thirty (30) percent or more of the contract amount or to name itself for the work.
10. QUALIFICATION OF BIDDERS. The apparent most qualified, responsible bidder shall submit to Owner, within 5 calendar days of notification, either i) a fully completed Contractor’s Statement of Qualification or ii) a written statement that the most recently submitted Contractor’s Statement of Qualification is accurate, which statement shall be considered in the award of the Contract. Failure to accurately complete the Contractor’s Statement of Qualification or to submit the Statement will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s Statement of Qualification is available from Engineer. No other form of Statement of Qualification will be acceptable. Evidence of out-of-state corporation
II - 4
to conduct business in the state in which the Work is to be performed, along with state contractor license number, must also be provided.
11. TEXAS HOUSE BILL 1295. Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) by Bidders: Effective January 1, 2016, pursuant to Texas Government Code
2252.908 (the “Interested Party Disclosure Act” or the “Act”), the Owner may not award the contract to a bidder unless the bidder has provided to the Owner a completed, signed and notarized TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed and notarized, and provided to the Owner. The TEC Form 1295 must be submitted with the contractor’s bid. Neither the Owner nor its consultants have the ability to verify the information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295.
12. HOUSE BILL 89 IMPLEMENTATION. As required by Chapter 2270, Government Code, ___________ (Contractor) hereby represents and verifies that it (i) does not boycott Israel and will not boycott Israel during the term of this Agreement, (ii) is not engaged in business with Iran, Sudan, or a foreign terrorist organization as defined by Texas Government Code Section 2252.151, and (iii) is not identified on a list of scrutinized companies prepared and maintained under Texas Government Code Sections 2270.0201 or 2252.153, in connection with the prohibition against governmental contracts with companies engaged in business with Iran, Sudan, or a foreign terrorist organization. For purposes of this Agreement, "boycott Israel" has the meaning assigned by Texas Government Code Section 808.001, and "foreign terrorist organization" has the meaning assigned by Texas Government Code Section 2252.151.
13. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. If, within twenty-four hours after Bids are opened, any bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that bidder may withdraw its Bid and the Bid Security will be returned. Thereafter, that bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.
14. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any bidder if Owner believes that it would not be in the best interest of the Project to make award to that bidder, whether because the Bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner. Owner also reserves the right to waive all informalities and defects in bidding, except time of submitting a Bid. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices.
Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
In evaluating Bids, Owner will consider, among other things, the qualifications of bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. Alternate bid items will not be considered unless requested in the Bid Form.
II - 5
Owner may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for the Work. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work.
Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner’s satisfaction.
BY SUBMITTING A BID, EACH BIDDER AGREES TO FULLY AND FOREVER WAIVE AND
RELEASE ANY CLAIM (KNOWN OR UNKNOWN) IT HAS OR MAY HAVE AGAINST THE
OWNER, ENGINEER, DEVELOPER AND THEIR RESPECTIVE ATTORNEYS, EMPLOYEES,
CONSULTANTS, REPRESENTATIVES, AND AGENTS ARISING OUT OF OR IN
CONNECTION WITH THE: (I) ADMINISTRATION, EVALUATION, OR RECOMMENDATION
(OR LACK THEREOF) OF ANY BID; (II) WAIVER OF ANY REQUIREMENTS UNDER THE BID
DOCUMENTS OR THE CONTRACT DOCUMENTS; AND (III) ACCEPTANCE OR REJECTION
OF ANY BIDS AND AWARD OF THE CONTRACT.
Owner reserves the right to award the Bid, at Owner’s discretion, based on the amount of the Total Base Bid (without including “Extra Unit Price Items” or “alternate” bid items) or on the amount of the Total Amount Bid (including “Extra Unit Price Items” items or “alternate” bid items), or based on any other combination, means or method determined appropriate by Owner.
If the contract is to be awarded, it will be awarded to the responsible bidder whose evaluation by Owner indicates that the award will be most advantageous to the Owner and result in the best and most economical completion of the Work.
If the contract is to be awarded, Owner will give the successful bidder a notice of award within sixty (60) days after the day of the Bid opening.
Within 7 calendar days of receipt from the Owner of the Notice of Award, the successful bidder must submit to the Engineer the original Bonds and all information or other items necessary to complete the Contract Documents, including the Schedule of Completion and Contractor’s safety program. The successful bidder must return the fully executed Contract Documents to Engineer within 7 calendar days of receipt, or Owner may at its sole discretion disqualify the bid and accept another bid and the bidder shall, at Owner’s option, forfeit its bid security.
15. TAXES, LICENSES AND FEES. Certain taxes, licenses, fees and other similar items are part of the cost of the Work and it shall be Contractor’s responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to the same. The prices, sums, rates and other charges set forth in the Contractor’s Bid shall cover and include all such costs. Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor, if requested by Contractor in writing, with a completed Texas Sales and Use Tax Exemption Certification as evidence of the applicability of such exemption and Contractor shall not collect Texas sales and use taxes from Owner with respect to this Contract. Contractor and all subcontractors to Contractor shall issue a Texas Sales and Used Tax Exemption Certification with respect to, and shall not pay Texas sales and use taxes on, all purchases of the following items that are exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.311: (i) tangible personal property that will be incorporated into Owner’s realty; (ii) tangible personal property that is necessary and essential for the performance of this contact and is consumed entirely on the job
II - 6
site; and (iii) taxable services for use in the performance of this Contract that are performed at the job site and are either integral to the performance of this Contract or expressly required to be provided by this Contract. In addition, Contractor and all subcontractors to Contractor (i) shall not include any provision for Texas sales and use taxes with respect to such exempt items in any Bid or the Contract Price, and (ii) shall pass on to the Owner cost savings due to the exempt status of such exempt items. Contractor’s contracts with all subcontractors to Contractor shall include the foregoing provision regarding the exemption from Texas Sales and use taxes. Contractor must pay taxes on items that are not exempt.
16. NUMBER OF SIGNED SETS OF DOCUMENTS. The Contract Documents will be prepared in at least four original sets for signature, one for delivery to the successful bidder.
Owner will furnish the successful bidder six sets of Plans and Technical Specifications free of charge, and additional sets may be obtained from Engineer at Engineer’s reproduction rates. The successful bidder shall provide four signed originals of each of the Bonds to be bound with the Contract Documents.
17. WORKER’S COMPENSATION INSURANCE. See section entitled “INSURANCE” in Special Conditions Part A of the Contract.
18. SOILS REPORT. If a soils investigation has been made for this project, the soils report and log of borings is available for bidder’s information only. The report is not a warranty of subsurface conditions, nor is it a part of the Contract Documents. Bidders are expected to examine the Site and such reports and then decide for themselves the character of the materials to be encountered.
Owner and Engineer disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others. Owner and Engineer further disclaim responsibility for interpretation of that data by bidder, i.e. projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or underground facilities.
19. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.
(A) General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall ascertain the general prevailing wage rate received by the classes of workers employed on projects similar to this project and shall specify in the call for Bids and in the Contract the minimum wage rates which shall be paid for each type of worker. This statute further provides that the Contractor or subcontractors shall pay, as penalty, to Owner Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract.
The statute likewise requires that the Contractor and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the accrual per diem wages paid to each worker. These records are open to the inspection of Owner.
(B) The minimum wage rates that apply to this Contract are specified in the Special Conditions Part A of the Contract. Contractor and subcontractors shall review and ascertain such wage rates and pay at least such minimum rates.
II - 7
20. SENATE BILL 19 IMPLEMENTATION. As required by Senate Bill 19 of the 87th session of the Texas Legislature, for all contracts in excess of $100,000, (Contractor) hereby represents and verifies that it does not boycott or discriminate against a firearm entity or firearm trade association. For purposes of this agreement, “discriminate against a firearm entity or firearm trade association” has the meaning assigned by Senate Bill 19 of the 87th Session of the Texas Legislature.
CITY OF MONTGOMERY BID FORM
To: Ameriport LLC obo CCID No. 2 c/o Ward Getz and Associates
2500 Tanglewilde, Suite 120
Houston, TX 77063
Attention: Sara Karouni, PE
Bidder acknowledges receipt of the following addenda:
(Initial) (Initial) (Initial)
(Initial) (Initial) (Initial)
Addendum No. 4 Addendum No. 5 Addendum No. 6
The undersigned, as Bidder, declares that the only person or parties interested in this proposal as principals are those named herein, that this proposal is made without collusion with any other person, firm or corporation;
that he has carefully examined the Instructions to Bidders, the General Conditions of Agreements, the Special
Conditions, the Specifications, the Plans, the site location, the site conditions, and classes of materials of the proposed work described herein; and agrees that he will provide all the necessary labor, machinery, tools, superintendence and other items incidental to construction, and will do all the work and furnish all the materials called for in the contract and specifications in the manner prescribed therein, and for the prices set forth in the attached bid proposal.
In submitting this bid form the Bidder agrees, if this bid is accepted, to enter into a binding agreement with the owner, under the terms and conditions included in the contract documents. Bidder agrees to provide materials and labor to complete work in accordance with the contract documents at the prices specified in this Bid
Proposal. This Bid Proposal will remain subject to acceptance for sixty (60) days after the bid opening date, and the Bidder may not withdraw bids for this period. The Bidder shall sign and deliver all Agreement documents, and Bonds specified in the Contract Documents within ten (10) calendar days of Notice of Award.
The Bidder agrees that the work will be complete in full within specified contract days below of the Notice to
Proceed. The total contract price may increase or decrease based on work that may be added or removed during construction based on the proposed prices and actual work completed. Actual quantities shall be measured in accordance with the conditions specified in the Contract Documents. Bid prices should be written in figures and in long hand with written words; in the event of any discrepancies, bid prices in written words will maintain precedence.
The Owner reserves the right to award based on any combination of items in the Bid Proposal and or reject any and all bids.
Addendum No. 1 Addendum No. 2 Addendum No. 3
Ameriport LLC on behalf of
Chambers County Improvement District No. 2 in
Chambers County, Texas
BID FORM
for
Construction of FM 565 TXDOT Road Improvements for
BID - 1
Bidder Initial
CITY OF MONTGOMERY BID FORM
CONTRACTOR Witness
Address
Signature of Bidder
Printed Name of Bidder
Date
Phone Number
Email Address
TOTAL BASE BID :
(Equal to Base Bid Amount from following pages)
Seal (if applicable)
Construction of FM
565 TXDOT Road
Improvements
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final.
BID PROPOSAL SUMMARY:
The following table describes the phases of work to be completed, construction time frames for each phase of work, and any incentives or economic disincentives that may apply. Bidder shall specify the number of days proposed to complete each phase of work.
Description of Work
Substantial Days to Complete
(Notice to Proceed to
Substantial Completion
Final Days to Complete
(Substantial Completion to Final
Completion)
Total Completion
Time
BID - 1
Bidder Initial
ITEM SPEC CODE
NO. NO. NO. UNIT QUANTITY UNIT PRICE AMOUNT
UNIT A: SITE PREPARATION
A1 500 7001 LS 1.0
A2 LS 1.0
A3 LS 1.0
A4 100 7001 LS 1.0
A5 105 7123 SY 1,300.0
A6 152 7005 LF 5,500.0
A7 104 7001 SY 130.0
A8 104 7003 SY 56.4
A9 104 7008 SY 396.0
A10 104 7016 LF 640.0
A11 110 7001 CY 100.0
A12 542 7001 LF 180.0
A13 542 7002 EA 1.0
A14 496 7007 LF 72.0
A15 496 7004 EA 2.0
A16 496 7006 EA 1.0
UNIT A: SUBTOTAL
UNIT B: STORM SEWER SYSTEM
B2 466 7009 EA 1.0
B3 464 7009 LF 5.0
B4 464 7003 LF 744.0
B5 464 7005 LF 92.0
B6 464 7040 LF 490.0
B7 465 7317 EA 7.0
B9 467 7308 EA 4.0
B10 467 7328 EA 2.0
UNIT B: SUBTOTAL
TXDOT
DESCRIPTION
BID TABULATION
TXDOT FM 565 ROADWAY IMPROVEMENTS
FOR AMERIPORT LLC & TXDOT BEAUMONT DIST.
OBO CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
PROJECT NO: 00043-041-005
DATE: 08/19/2026
Mobilization- move in and start up, including all permits, performance, payment, and maintenance bonds.
Site Preparation - to rid areas of construction vegetation, debris, and organic matter, including stripping existing topsoil, replacing topsoil over open cut areas and provide positive drainage).
Remove and dispose of the existing asphalt pavement layer, including the subgrade/base. All removed material becomes the property of the
Contractor and shall be disposed of offsite in a legal manner.
Road grader work, ordinary compaction, complete in place, including shaping, grading, compacting, and all labor, materials, equipment, and incidentals required in accordance with the plans and specifications.
Remove and dispose of the existing concrete median pavement. All removed material shall become the property of the Contractor and shall be legally disposed of offsite.
Remove and dispose of the existing concrete Curb. All removed material shall become the property of the Contractor and shall be legally disposed of offsite.
Remove and legally dispose of existing storm sewer pipe. All removed material shall become the property of the Contractor and shall be disposed of offsite in a legal manner.
Roadway excavation- Excavate and remove roadway materials as required to construct the proposed roadway section to the lines and grades shown in the plans. All surplus or unsuitable material shall become the property of the Contractor and shall be disposed of offsite in a legal manner.
18-inch reinforced concrete arch pipe, Class III, installed at all depths, including bedding, backfill, and all incidental work, complete in place.
Type AZ2G inlet, including first and second stage, complete in place.
Safety End Treatment, Type II, for 24-Inch RCP, including riprap and all necessary appurtenances, per TxDOT standard detail, complete in place.
Reinforced concrete headwall and wingwalls for 36-inch RCP , as specified, per plans and as directed by the Engineer, complete in place.
24-inch RCP, Class III, installed at all depths, including bedding, backfill, and all incidental work, complete in place.
Construction Staking
Control Staking
Remove and dispose of the existing concrete pavement. All removed material shall become the property of the Contractor and shall be legally disposed of offsite.
Remove and legally dispose of existing safety end treatment. All removed materials shall become the property of the Contractor and shall be disposed of offsite in a legal manner.
Remove and legally dispose of existing headwall. All removed materials shall become the property of the Contractor and shall be disposed of offsite in a legal manner.
Remove terminal anchor section, including disposal of removed materials and restoration of disturbed areas, with all labor, equipment, and incidentals required in accordance with the plans and specifications.
36-inch RCP, Class III, installed at all depths, including bedding, backfill, and all incidental work, complete in place.
18-inch RCP, Class III, installed at all depths, including bedding, backfill, and all incidental work, complete in place.
Safety End Treatment, Type II, for 18-Inch RCP, including riprap and all necessary appurtenances, per TxDOT
Remove concrete mow strip, including loading, hauling, disposal of removed materials, and restoration of disturbed areas, with all labor, equipment, and incidentals required in accordance with the plans and specifications.
Remove and legally dispose of existing signs.
TXDOT
DESCRIPTION
BID TABULATION
TXDOT FM 565 ROADWAY IMPROVEMENTS
FOR AMERIPORT LLC & TXDOT BEAUMONT DIST.
OBO CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
PROJECT NO: 00043-041-005
DATE: 08/19/2026
UNIT C: SIGNS & PVMT MARKINGS
C1 LS 1.0
C2 LS 1.0
C3 LS 1.0
C4 LS 1.0
C5 LS 1.0
C6 1.0
C7 LS 1.0
UNIT C: SUBTOTAL
UNIT D: TRAFFIC CONTROL
D1 502 6001 MO 4.0
UNIT D: SUBTOTAL
UNIT E: ROADWAY
E1 529 7002 LF 22.0
E2 260 7003 TON 243.0
E3 260 7011 SY 15,000.0
E4 341 7030 TON 6,300.0
E5 341 7006 TON 1,181.3
E6 341 7082 GAL 14,275.8
E7 SY 12,925.0
E8 132 7001 CY 100.0
E9 360 7001 SY 84.0
E10 432 7013 CY 8.0
E11 540 7001 LF 130.0
E12 540 7041 EA 1.0
UNIT E: SUBTOTAL
UNIT F: STORM WATER POLLUTION PREVENTION
F1 506 7022 SY 40.0
F2 506 7024 SY 40.0
Lime treatment of existing material and new base, 8 inches thick, complete in place.
Remove and dispose of existing signs.
Dense-graded hot mix asphalt, Type C, using PG 76-22 asphalt binder, complete in place.
Apply lime slurry uniformly to the designated areas at the specified application rate. Mix, furnish, and place all materials as required to achieve proper coverage and compliance with project specifications.
Dense-graded hot mix asphalt, Type B, using PG 70-22 asphalt binder, complete in place.
Furnish and install new signs, including posts, hardware, and all incidental work, complete in place.
Tack coat, complete in place, including furnishing, preparing the surface, applying asphaltic material, and all labor, materials, equipment, and incidentals required in accordance with the plans and specifications.
Mill existing surface and overlay with 1.5-inch hot mix asphalt, Type D, complete in place.
Construction exit, Type 3, complete in place, including furnishing, installing, maintaining, and removing as required, with all labor, materials, equipment, and incidentals in accordance with the plans and specifications.
Remove construction exits, including disposal of materials and restoration of affected areas, with all labor, equipment, and incidentals required in accordance with the plans and specifications.
Terminal anchor section, complete in place, including furnishing, installing, hardware, anchorage, and all labor, materials, equipment, and incidentals required in accordance with the plans and specifications.
Concrete pavement, continuously reinforced, 6 inches thick, complete in place, including all labor, materials, equipment, reinforcement, finishing, curing, and incidentals required in accordance with the plans and specifications.
Riprap mow strip, 4 inches thick, complete in place, including furnishing, placing, grading, and all labor, materials, equipment, and incidentals required in accordance with the plans and specifications.
Metal W-beam guard fence with timber posts, complete in place, including furnishing, installing, posts, rail elements, hardware, anchorage, and all labor, materials, equipment, and incidentals required in accordance with the plans and specifica?ons.
Construct final embankment using Type A material, placed and compacted to ordinary compaction requirements, including all excavation, hauling, placement, shaping, moisture conditioning, and all labor, equipment, and incidentals necessary for a complete installation in accordance with the plans and specifications.
Type II concrete curb, complete in place.
Barricades, signs and traffic handling.
Remove and relocate existing railroad crossing sign, including all hardware, supports, and incidental work; any damage incurred during removal and reinstallation is incidental.
Removal of existing pavement markings, including all lines, symbols, letters, and incidental work, complete.
Pavement markings, per plans, complete in place.
Remove and relocate existing signs, including all hardware and supports;
any damage incurred during removal and reinstallation is incidental.
Remove and relocate existing mailboxes, including all hardware and supports; any damage incurred during removal is incidental.
TXDOT
DESCRIPTION
BID TABULATION
TXDOT FM 565 ROADWAY IMPROVEMENTS
FOR AMERIPORT LLC & TXDOT BEAUMONT DIST.
OBO CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
PROJECT NO: 00043-041-005
DATE: 08/19/2026
F3 506 7039 LF 10,000.0
F5 506 7040 LF 300.0
F6 506 7042 LF 240.0
F8 164 7050 AC 2.0
F9 162 7002 SY 50.0
UNIT F: SUBTOTAL
UNIT G: SUPPLEMENTARY ITEMS 1
G1 LS 1.0
UNIT G: SUBTOTAL
Furnish, install, maintain, and remove 6-inch biodegradable erosion control logs, complete in place, including all labor, materials, equipment, and incidentals required in accordance with the plans and specifications.
Furnish, install, maintain, and remove inlet protection barrier for Stage I and Stage II in accordance with the Stormwater Pollution Prevention Plan and as directed, including all labor, materials, equipment, and incidentals required.
Offset existing 4" and 8" waterline across proposed storm sewer, if necessary, complete in place.
Hydro-mulch seeding for permanent rural clay areas, complete in place, including furnishing, placing, watering, maintenance, reapplication as necessary, and all labor, materials, equipment, and incidentals required to establish vegetation by any means necessary at no additional cost to the owner, in accordance with the plans and specifications.
Block sodding, complete in place, including furnishing, placing, watering, rolling, staking as required, maintenance, replacement, and all labor, materials, equipment, and incidentals necessary to establish a uniform stand of vegetation in accordance with the plans and specifications at no additional cost to the owner.
Furnish, install, maintain, and remove reinforced filter fabric fence in accordance with the Stormwater Pollution Prevention Plan and as directed, including all labor, materials, equipment, and incidentals required.
ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL
UNIT A: SITE PREPARATION
A1 Move-in and start up including all permits, performance, and payment and maintenance bonds for Chambers County and the City of Baytown. LS 1.00 $ $
A2 Constrcution Control Staking LS 1.00
A3 Construction Staking LS 1.00 $ $
A4 Clearing and Grubbing, including 6" topsoil stripping and spoil on-site in "Organic
Spoils Stockpile" AC 1.50 $ $
UNIT A Subtotal: $
UNIT B: STORM SEWER SYSTEM
B1 24-inch RCP, Class III, installed at all depths, including bedding, backfill, and all incidental work, complete in place.
LF 827.00 $ $
B2 24-inch RCP, Class III, installed at all depths, including bedding, backfill, and all incidental work, complete in place. via trenchless construction mehtods
LF 154.00 $ $
B3 24-inch corrugated metal storm drain pipe, all depths, including bedding, backfill, and all incidental work, complete in place. LF 125.00 $ $
B4 18-inch reinforced concrete arch pipe, Class III, installed at all depths, including bedding, backfill, and all incidental work, complete in place. LF 88.00 $ $
B5 Five by Six feet (5'x6') reinforced concrete box (RCB) Storm, all depths, including bedding and filling, complete in place. LF 594.00 $ $
B6 Safety End Treatment (SET) for Three - Five by Six feet (3 - 5'x6') reinforced concrete boxes (RCB) Storm, including pipe runners, bedding and filling, complete in place. EA 2.00 $ $
B7 24-inch reinforced concrete pipe (RCP) connection to existing manhole, complete in place. EA 1.00 $ $
B8 18-inch reinforced concrete pipe (RCP) tie-in to reinforced concrete box (RCB), complete in place. EA 1.00 $ $
B9 Remove and relocate existing Safety End Treatment (SET) for Three - Five by Six foot (3 - 5'x6') reinforced concrete boxes (RCB) Storm, including bedding and filling, complete in place. EA 1.00 $ $
B10 Trench safety for installation of storm sewer system, all depths. LF 1,634.00 $ $
B11 Type "C" manhole, complete in place. EA 6.00 $ $
B12 Extra Depth Type "C" manhole, complete in place (>12' DEPTH) VF 6.50 $ $
B13 Type "C" inlet, complete in place. EA 4.00 $ $
B14 Type "E" inlet, complete in place. EA 1.00 $ $
B15 Concrete pilot channel, complete in place. SY 318.00 $ $
B16 Concrete Rip Rap, Complete in place (Per Spec) SY 88.00 $ $
B17 Backslope interceptor structure, Complete in place EA 2.00 $ $
B18 Backslope interceptor swale, Complete in place LF 1,340.00 $ $
B19 Detention basin earthen emergency overflow, Complete in place. SY 102.00 $ $
B20 Rip Rap Stone Protection (TxDOT 432-7043) (18 in), Complete in place. SY 40.00 $ $
UNIT B Subtotal: $
BID FORM
FOR
AMERIPORT BUSINESS PARK NORTH PHASE I
FOR AMERIPORT LLC ON BEHALF OF
BID OPENING DATE: 8/19/2026
CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
SUPPLEMENTARY ITEMS 2
BID FORM
FOR
AMERIPORT BUSINESS PARK NORTH PHASE I
FOR AMERIPORT LLC ON BEHALF OF
BID OPENING DATE: 8/19/2026
CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
C1 Twelve-inch (12") P.V.C. (DR-18, C-900) open cut Water Line with restrained joints, including bends wyes, crosses, plugs, clamps, reducers, and tees), complete in place.
LF 176.00 $ $
C2 Twelve-inch (12") P.V.C. (DR-18, C-900) open cut Water Line, all depths, including bends wyes, crosses, plugs, clamps, reducers, and tees), complete in place.
LF 457.00 $ $
C3 Twelve-inch (12") P.V.C. (DR-18, C-900) Water Line with restrained joints, through Trenchless construction: Including Cement Stabilized Sand and Backfill.
Complete in Place
LF 134.00 $ $
C4 20" Dia. Steel Casing for 12" AWWA C900 DR 18 Water Line, not including cost of water line pipe, Complete in Place LF 118.00 $ $
C5 45 ˚(degree) (DR-14) restrained joint bends for 12" P.V.C by One Bolt Inc. or approved equal, complete in place. EA 4.00 $ $
C6 Twelve inch (12") Wet Connect (including removal of existing Twelve inch tee, and 12" cross install) and connection of proposed inch water line. EA 1.00 $ $
C7 Twelve inch (12") Gate Valve and Box, Complete In Place: EA 1.00 $ $
C8 Fire hydrant assembly, including 6" gate valve with box and 12"x6" tee, complete in place. EA 2.00 $ $
C9 Trench safety system for installation of water lines. LF 633.00 $ $
C10 12 inch (12") waterline plug and clamp w/ two inch (2") blow-off and box, complete in place. EA 1.00 $ $
UNIT C Subtotal: $
D1 Eight-inch (8") P.V.C. (SDR-26) sanitary sewer pipe including: air testing, mandrel testing, bedding, and backfill. LF 76.00 $ $
D2 Ten-inch (10") P.V.C. (SDR-26) (12'-16' depth) sanitary sewer pipe including: air testing, mandrel testing, bedding, and backfill. LF 627.00 $ $
D3 Ten-inch (10") P.V.C. (SDR-26) sanitary sewer pipe through trenchless construction including: air testing, mandrel testing, bedding, and backfill. LF 164.00 $ $
D4 16" Dia. Steel Casing for 10" SDR-26 sanitary sewer pipe, not including cost of sanitary sewer pipe, Complete in Place. LF 182.00 $ $
D5 Ten inch (10") P.V.C sanitary sewer connection to existing manhole. EA 1.00 $ $
D6 Eight inch (8") Sanitary Sewer Plug, Complete In Place. EA 1.00 $ $
D7 Type "C" manhole, complete in place EA 3.00 $ $
D8 Extra Depth Type "C" manhole, complete in place (>12' DEPTH) VF 13.50 $ $
D9 Trench safety system for installation of sanitary sewer LF 703.00 $ $
UNIT D Subtotal: $
E1 Twelve-inch (12") thick reinforced concrete pavement, complete in place. SY 3,481.00 $ $
E2 Eight inch (8") thick lime subgrade preparation and treatment (including proof-rolling, mixing stabilizer, or scarifying and compaction to 95% (per ASTM D-698). SY 4,145.00 $ $
E3 Eight-inch (8") lime stabilized subgrade - TXDOT Item 260 - Lime Stabilized
Subgrade (36 LBS/SY) TON 75.00 $ $
E4 Eight inch (8") thick dense graded hot mix asphalt type B (DG HMA TY B) PG 70-
22 TON 208.00 $ $
E5 Two inch (2") thick dense graded hot mix asphalt type C (DG HMA TY C) PG 76-
22, including tack coat TON 52.00 $ $
E6 Full width surface treatment - AC-20-5TR or AC-20XP GAL 172.00 $ $
E7 Full width surface treatment - Aggregate TY-PB GR-4 or TY-PL GR-4 SAC-A CY 14.00 $ $
E8 Six-inch (6") reinforced concrete curb, complete in place. LF 1,512.00 $ $
E9 Speed Limit Signage, complete in place. EA 2.00 $ $
UNIT C: WATER DISTRIBUTION SYSTEM
UNIT D: SANITARY SEWER SYSTEM
UNIT E: ROAD
BID FORM
FOR
AMERIPORT BUSINESS PARK NORTH PHASE I
FOR AMERIPORT LLC ON BEHALF OF
BID OPENING DATE: 8/19/2026
CHAMBERS COUNTY IMPROVEMENT DISTRICT NO. 2
E10 Stop signage with street sign and stop bar, complete in place. EA 2.00 $ $
E11 Traffic markings, curb paint, striping, and buttons for proposed right-of-ways and turn lanes, complete in place. LS 1.00 $ $
E12 Earthwork embankment and fill. CY 1,149.00 $ $
E13 Earthwork excavation (including drainage ditch). CY 11,989.00 $ $
UNIT E Subtotal: $
F1 Existing eighteen inch (18") RCP to be removed and disposed of properly. LF 31.00 $ $
F2 Existing gravel driveway to be removed and disposed of legally. SY 150.00 $ $
UNIT F Subtotal: $
G1 Stabilized Construction Entrance (including placement, maintenance, and removal as directed by the engineer). EA 1.00 $ $
G2 Concrete truck washout area, including removal and disposal, complete in place. LS 1.00 $ $
G3 Placement of reinforced filter fabric fence, as per Stormwater Pollution
Prevention Site Plan and as directed by engineer (including installation, maintenance, and removal). LF 2,731.00 $ $
G4 Inlet Protection Barrier - Type I & II, complete in place. EA 6.00 $ $
G5 Inlet Protection Barrier - Type II, complete in place. EA 4.00 $ $
G6 Placement of rock filter dam as per Stormwater Pollution Prevention Site Plan
(including installation, maintenance, and removal). EA 1.00 $ $
G7 Hydro-mulch seeding for permanent rural clay areas, complete in place, including furnishing, placing, watering, maintenance, reapplication as necessary, and all labor, materials, equipment, and incidentals required to establish vegetation by any means necessary at no additional cost to the owner, in accordance with the plans and specifications. AC 4.00 $ $
G8 Block sodding (16" width) LF 1,000.00 $ $
UNIT G Subtotal: $
H1 Trench Safety System design and submittal for underground utilities, prepared and sealed by a Professional Engineer licensed in the State of Texas, in accordance with the Contract Documents. LS 1.00 $ $
H2 Utility Excavation, to be stockpiled onsite, complete in place. No adjustments will be made based on variance of actual quantity. CY 100.00 $ $
H3 As-built survey, in both CAD and .pdf format, conducted at the end of construction, including all items necessary to issue a Certificate of Completion, contracted through Windrose Land Services. LS 1.00 $ $
H4 8-inch dewatering pump, approximate capacity 1,400 gpm, including furnishing, operation, maintenance, fuel, piping, fittings, silt control, and all incidentals, complete in place, as directed by the Engineer. LS 1.00 $ $
H5 Well point system, complete in place and operated per specifications, as directed by Engineer. (Fixed Unit Cost of $20.00 per LF) LF 800.00 $ $
UNIT H Subtotal: $
I1 In lieu of item B9, remove and dispose of existing Safety End Treatment (SET) for
Three - Five by Six (3 - 5'x6') reinforced concrete boxes (RCB) EA 1.00 $ $
I2 Suppemental to item I1, Safety End Treatment (SET) for Three - Five by Six (3 -
5'x6') reinforced concrete boxes (RCB) Storm, including pipe runners, bedding and filling, complete in place. EA 1.00 $ $
UNIT I Subtotal: $
UNIT G: STORM WATER POLLUTION CONTROL
UNIT H: MISCELLANEOUS
UNIT I: SUPPLEMENTARY ITEMS 1
UNIT F: DEMOLITION
TXDOT
DESCR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .