00020000-109666.pdf

PDF 51 KB Posted

Attached to
Master Agreement FL|E4M61|6e02887a4a1f091e2858b722841fd345
Contract number
E4M61
Issued by
Florida

About this file

These are two memoranda from the Florida Department of Transportation (FDOT), both issued by Jose R. Guerrero, Traffic Operations Project Engineer, to Cleo Marsh, Fort Lauderdale Operations Engineer. The first memorandum is dated October 11, 2012, and the second is dated February 6, 2013. Both documents relate to District Contract No. E4M61, a Broward County Push-button Contract with Financial Project No. 228229-8-52-01.

The first memorandum concerns modifying existing median to install a U-Turn lane along SR-862, with a total estimated work cost of $810.60. The second memorandum involves installing pedestrian crosswalks, curb cut ramps, and appropriate signage at SR-A1A in the Cities of Pompano Beach, Hillsboro Beach, and Deerfield Beach, with a total estimated work cost of $33,847.80. Both work orders involve Community Asphalt Corp. as the contractor, with John Morris designated as the contact. The work was to be completed in October 2012 and by April 2013, respectively, with construction plans, lane closure analysis, and utility clearance letters attached to each memorandum.

View the file

Other files

File Type Posted
CN-550000-E4M61-00050000.pdf PDF
CN-550000-E4M61-00090000.pdf PDF
00010000-109199.pdf PDF
00030000-109667.pdf PDF
ContractDeliverablesExport.csv CSV file
CN-550000-E4M61-00070000.pdf PDF
CN-550000-DNM29-W0070000.pdf PDF
CN-550000-E4M61-00040000.pdf PDF
CN-550000-E4M61-00060000.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .