This is a plan document (Exhibition 6) prepared by the Oregon Department of Transportation for a construction project on Pacific Highway East (OR99E) near Basilio Drive in Hubbard, Marion County. The project scope includes constructing concrete curbs, gutters, sidewalks, and ADA-compliant curb ramps; installing storm sewer pipe, manholes, and inlets; constructing asphalt concrete pavement; and installing flashing beacons with rectangular rapid flashing beacon (RRFB) assemblies. The detailed construction plans specify two curb ramp installations (CR01 and CR02) along the highway segment at mile posts 28.85 to 28.91, with accompanying sidewalk and drainage infrastructure. The plans incorporate standard Oregon Department of Transportation design standards and reference numerous standard drawing specifications including drainage structures, curb and gutter details, traffic control provisions, signing and striping requirements, and signal installation details. Work includes 12 square feet of new safety yellow truncated domes at each curb ramp location, installation of type CG-1 concrete inlets, 3-inch PVC drain pipe under sidewalks, 12-inch storm sewer pipe, and manhole construction at specified elevations and stations.
The project documentation reflects coordination with multiple agencies and includes traffic control staging plans with temporary pedestrian access routes and tubular markers spaced at 10-foot maximum intervals. Two existing utility poles are identified for beacon installation (TSSU IDs 3F580 and 3F581), with detailed equipment specifications for pedestrian signal mounts, pushbuttons, solar panels, and rapid flashing bar signs. The plans designate a project engineer registered in Oregon (PE License 86981, renewal date 12-31-2027) and include design personnel assignments. The document references compliance with Oregon Utility Notification Center rules under OAR 952-001-0100 and emphasizes safety-first protocols for construction. All plan sheets are marked as final electronic documents available upon request, with the project file updated as of April 27, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017014_Att B_Sample Public Improvement Contract.docx | DOCX document | |
| 00017014_Att A Form A-2_Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00017014_Exh 5 to Sample Contract_Specifications.docx | DOCX document | |
| 00017014_ITB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
59V-084
MARION COUNTY
PACIFIC HIGHWAY EAST
OR99E: NEAR BASILIO DR. (HUBBARD) PROJECT
R_M25049_ts_01.dgn :: Default 4/27/2026 3:39:36 PM hwye07x
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
A02 Index Of Sheets Cont. & Std. Dwg. Nos.
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
A01A01EDIT TEXT
(503) 232-1987).
The Oregon Utility Notification Center Is
The Center (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
Through OAR 952-001-0100.
Those Rules Are Set Forth In OAR 952-001-0001
By The Oregon Utility Notification Center.
Oregon Law Requires You To Follow Rules Adopted
ATTENTION:
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
A F E
Y
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E
F E authority.
and approved by the ODOT Chief Engineer or their delegated
Exceptions to these standards, if any, have been submitted
These plans were developed using ODOT design standards.
PLANS PREPARED FOR MAINTENANCE
BY: ________________________________
Signature & date
Robert E. Harrison - R2 Tech Ctr. Mgr.
Print name and title
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
HILLSBORO
DALLAS
Redmond
Val ley Jordan
STATE OF OREGON
DEPARTMENT OF TRANSPORTATION
PLANS FOR PROPOSED PROJECT
DRAINAGE, PAVING, CURB RAMPS, SIGNING & SIGNALS
C
T. 4 S., R. 1 W., W.M.
O
N E
MTRAPED
G
R
OI
ATROPS
MP 29.0
PACIFIC HWY. EAST
NINA PL.
BAINES BLVD.
M
ILL CREEK LN.
KU
RT
H
AV
E.BAINES BLVD.
TH
THOM
AS W
AY
M.P. 28.85
ST
ST.
6T
AVE.
VICKIE
O
NBEAMCT.
3R D
'A' 'C'
'B'
'D'
'E'
'F'
PARK
SHOPS
BARENDSE
KARI LN.
CIR.
PARKW
AYBLVD.
PACIFICLINDSEY
BASILIO
RUDOMETKIN
DR.
DR.
ELM ST.
ASH
BI
LO
U
AL
ER
APLE ST.
AVE.
ALLEN PL.
CT.
PA
IF
IC
PEGGYS
LN.
SAUNDERS
4T
7T
5T
9T
JUNE 2026
o o d b u r n
PROJECT SITE
NINA PL.
ILL CREEK LN.
Y.
EA
1E
UN
IO
RR
CI
FI
99E
2N
1S
Station Gas
MarketHUBBARD
OREGON TRANSPORTATION COMMISSION
TRANSPORTATION
INTERIM DIRECTOR OF
COMMISSIONER
VICE CHAIR
CHAIR
Lisa Sumption
Vacant
Phil Chang
Jeff Baker
Lee Beyer
Julie Brown
R_M25049_ts_01.dgn :: Default 4/27/2026 3:39:36 PM hwye07x
R_M25049_ts_01.dgn :: Default 4/27/2026 3:39:38 PM hwye07x
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
PROJECT NUMBER
NO.
SHEET
SEE SHEET A01
A02http://www.oregon.gov/ODOT/Engineering/Pages/Standards.aspx
Standard Drawings located on the web at:
SHEET NO. DESCRIPTION
INDEX OF SHEETS, CONT.
ROADWAY DETAILS
Curb Ramp Components And Legend- RD900
Curb Ramp Legend And Corner Identification- RD901
Standard Dwg. Nos.
BA01 Details
ROADWAY CONSTRUCTION
C01 General Construction
Sidewalk Joints And Transition Panels- RD722
Curb Ramp Details BB03 Incl.
BB01 Thru
Standard Manhole Details- RD336
Pipe To Structure Connections- RD339
24" Manholes- RD343
Standard Manhole Base Section- RD344
Pipe To Manhole Connections- RD345
Manhole Covers And Frames- RD356
Gutter Transition At Inlet- RD363
Frames & Grates For Concrete Inlets- RD365
Concrete Inlets Type CG-1, CG-2- RD366
Curbs- RD700
Combination Curb Ramp- RD932
Combination Curb Ramp Single Ramp- RD938
No R/W Map
EA01, EA02 Traffic Control Plan
TRAFFIC CONTROL
LA01
SIGNS
Signing & Striping Plan
Tables, Abrupt Edge and PCMS Details- TM800
Temporary Sign Supports- TM821
Temporary Pedestrian Accessible Routes- TM844
2-Lane, 2-Way Roadways- TM850
Combination Curb Ramp- RD930
LA02 Sign and Post Data Table
MA01
SIGNALS
Flashing Beacon Plan
MA02 Existing Utilities
MA03 Details
Sign Installation Details- TM200
Pedestal Foundation and Traffic Signal Assembly- TM457
Pedestrian Signal Mount and Pedestrian Pushbutton Details- TM467
Rectangular Rapid Flashing Beacon (RRFB) Assemblies- TM493
Pavement Marking Standard Detail Blocks- TM503
Intersection Pavement Markings (Crosswalk, Stop Bar & Bike Lane Stencil)- TM530
3 Second Gust Wind Speed Map- TM671
Sign Attachments- TM676
Perforated Steel Square Tube (PSST) Anchor Foundation- TM687
Perforated Steel Square Tube (PSST) Sign Support Installation- TM681
BC01 Pipe Data
Trench Backfill, Bedding, Pipe Zone And Multiple Installations- RD300
Multi-Post Breakaway Sign Supports Notes- TM600
Multi-Post Breakaway Sign Supports Details- TM601
Triangular Base Breakaway Multi-Directional Slip Base Design- TM602
Breakaway Sign & Luminaire Supports - Support Location Guidelines- TM635
Miscellaneous Sign Placement Details- TM201
Inlet Protection Type 2, 3, 6, 7, 10 And 11- RD1010
R_M25049_ts_01.dgn :: Default 4/27/2026 3:39:38 PM hwye07x
RENEWS: 12-31-2027
86981PE
RE
GI
ERE
D PROFESSIONALEN
GINEER
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:CADD Tech:
Designer:
SHEET NO.
Reviewer:
DETAILS
Derryl James
N/A
James Darnell Jr.
Jeff Larson
R_M25049_dt_01.dgn :: Default 4/27/2026 3:39:41 PM hwye07x sidewalk
Concrete drain pipe
3" PVC
P a y l im it
PLAN
A A
(Normal sidewalk cross slope)
(Max. 2.0% finished surface slope)
Slope 1.5 % max.
2. All concrete shall be commercial grade concrete.
Place contraction joint over top of pipe.
1. Use where shown on plans, and allowed by jurisdiction.
GENERAL NOTES FOR ALL DETAILS:
24"
Top of sidewalk wire reinforcement
4x4 - W4xW4 welded
Contraction joint
2"
4" drain pipe
3" PVC
18"
3"
SECTION A-A
Sidewalk joint
Sl.
1:3
Sl. 1:3
PROFILE
Sidewalk
3" drainage pipe
1' 1'
Slope 1.0%
BA01
R_M25049_dt_01.dgn :: Default 4/27/2026 3:39:41 PM hwye07x
CURB RAMP DETAILS
R_M25049_dt_02.dgn :: 1 to 5 4/27/2026 3:39:46 PM hwye07x
TFC
TBC
TBC
TFC
FG
PAVEMENT REPLACEMENT AT CURB RAMPS
Ramp
Arrows to point downward
SLOPE DIRECTION
6"
Counter slope var. 1.5 % to
7.5 %
Ramp runs slope
4%
CURB RUNNING SLOPE = 4%
see general notes 1 and 2)
(Shown for reference only, Indicates full height curb & gutter, Gtr. line
See general note 2 directed towards the gutter.
For curb ramps with the counter slope
OPTION "B"
see general notes 2 and 3)
Indicates standard curb, Gutter line
6"
5.0% ≤ C
RS ≤ 7
.5% Max.
Tooled dummy joint
Thkn. - 4" Aggr. base directed towards the gutter and CRS ≥ 5%
See general note 2
CURB RUNNING SLOPE ≥ 5%
OPTION "C"
Ramp run slope must equal curb running slope.
Monolithic curb const. reqd.
6"See general note 2
CURB RUNNING SLOPE ≤ 2%
see general notes 1 and 2)
Indicates full height curb & gutter, Gtr. line directed away from the gutter.
OPTION "A"
≤ 1.5%
(See dwg. no. RD722) Contraction joint
1'
Sawcut
Nom. comp. thkn. - 12" Aggregate base
Nom. thkn. - 4" Commercial asphalt ACP base course
Nom. thkn. - 3" Commercial asphalt ACP wearing course
2' 1.4'
Gtr.
LEGEND
E=X" FG xxx.xx XX+XX.XX, xx.xx, curb exposure point Station, offset, elevation, Ramp number
Softscape
R#
2. Width to match adjacent gutter pan, if present.
GENERAL NOTES
3. For profile and cross slope, see project plans.
1. See dwg. no. RD700, and project plans, for additional curb details.
5. For curb ramp legend (See dwg. nos. RD900 & RD901)
4. Curb exposure E = 3" to 9". Vary as shown on project plans, or as directed.
(Example transition from E = 0 & CRS = 4% to E = 7" CRS = 1.5%)
6. Curb Running slope to transition between E= 0 and E = Full height curb (3" to 9").
1st lift - 2" 2nd lift - 2" Curb & gutter
BB01
R_M25049_dt_02.dgn :: 1 to 5 4/27/2026 3:39:46 PM hwye07x
DESIGN EXCEPTION
CROSSING CLOSURE
LRM NO.
CORNER POSITION
RAMP NO.
HWY:
M.P.:
R_M25049_dt_02.dgn :: 1 to 5 4/27/2026 3:39:55 PM hwye07x
(For location, see sht. C01)
"CR01" CURB RAMP
SCALE 1" = 5'
6. For curb ramp curb and gutter details (See sht. BC01).
5. Sawcut and replace pavement per pavement replacement detail (See sht. BC01).
See dwg. RD722, for sidewalk joint details.
4. Construct concrete joints as shown on plans, or as directed by Engineer.
3. For curb ramp detail legend (See sht BC01 and dwg. nos. RD900 & RD901)
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES
PACIFIC HWY. EAST (OR99E)
FG 184.16
40+00, 10.3' Rt.
FG 184.25
40+05.94, 10.2' Rt.
FG 184.65
40+11.90, 7.7' Rt.
FG 184.66
40+11.94, 10.1' Rt.
FG 184.71
40+17.90, 7.6' Rt.
FG 184.72
40+17.94, 10' Rt.
FG 184.64
40+24.02, 9.9' Rt.
FG 184.25
39+99.99, 16.1' Rt.
FG 184.34
40+06.02, 16.2' Rt.
FG 184.69
40+12.02, 16.2' Rt.
FG 184.77
40+18.02, 16.1' Rt.
FG 184.70
40+24.04, 15.9' Rt.
P .O .T
"C
.O
.3
"C
FG 185.18
40+17.80
FG 185.20
40+11.80
E=0
tr. 185.21G
40+05.80
.1
.7
.2
.6
0%
6'
.5
1.3%
6.1'
.9
1.1%
5.9%
6.9%
1.5%
5.9'
1.4%
.6
.8
tr. 185.15G
40+25.36
R1
3" drain pipe
GF 0.3%
BB02
081AAI00
28.91
R_M25049_dt_02.dgn :: 1 to 5 4/27/2026 3:39:55 PM hwye07x
R_M25049_dt_02.dgn :: 1 to 5 4/27/2026 3:39:56 PM hwye07x n c re te w lk n c re lk
(For location, see sht. C01)
"CR02" CURB RAMP
6. For curb ramp curb and gutter details (See sht. BC01).
5. Sawcut and replace pavement per pavement replacement detail (See sht. BC01).
See dwg. RD722, for sidewalk joint details.
4. Construct concrete joints as shown on plans, or as directed by Engineer.
3. For curb ramp detail legend (See sht BC01 and dwg. nos. RD900 & RD901)
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
SCALE 1" = 5'
E=6"
G 185.43F
10+34.02, 14.1' Lt.
G 185.71F
10+62.31, 6.6' Lt.
G 185.69F
10+57.04, 6.7' Lt.
tr. 185.14G
10+58.08
G 185.66F
10+49.26, 9.7' Lt.
E=5.7"
tr. 185.15G
10+62.19
BC 185.63T
10+62.20, 0.7' Lt.
G 185.35F
10+34.02, 7.7' Lt.
BC 185.26T
10+34.02, 0.5' Lt.
tr. 185.26G
10+34.02
tr. 185.16G
10+46.01
G 185.57F
10+47.08, 4.2' Lt.
BC 185.61T
10+56.86, 0.7' Lt.
(Match)
G 185.55F
9+99.95, 6.5' Lt.
G 185.55F
10+05.33, 6.7' Lt.
G 185.58F
10+11.34, 8.8' Lt.
G 185.42F
10+28.01, 14.1' Lt.
F 185.35P
10+28.02, 8.1' Lt.
F 185.38P
10+24.39, 7.9' Lt.
F 185.33P
10+28.02, 6' Lt.
BC 185.44T
9+99.99, 0.6' Lt.
E=5.7"
tr. 184.95G
10+00
BC 185.46T
10+05.91, 0.7' Lt.
G 185.49F
10+13.29, 3.3' Lt.
tr. 184.96G
10+03.78
tr. 185.10G
10+15.87
BC 185.26T
10+28.02, 0.5' Lt.
tr. 185.25G
10+28.02
0%
0.4%
8.6'
12.1'
0.1%
2.3%
10'
0.2%
11.3'
0.3%
5.6'
.3
.0
.4
8.5'
9.9'
2.2'
2.2%
10'
11.4'
5.4' d
.R .C
.R
.8
7 "
P .O
.O
R1
BC 185.54T
10+13.03, 0.60' Lt.
BC 185.65T
10+47.24, 0.60' Lt.
GF 0.3%
BB03
081AAI00
28.91
R_M25049_dt_02.dgn :: 1 to 5 4/27/2026 3:39:56 PM hwye07x
4 PIPE DATA 3 CURB RAMP DETAILS 2 DETAILS 1 TYPICAL SECTIONSSheet Title Level
RD346
RD345
RD344
RD343
RD342
RD340
RD339
RD338
RD336
RD335
RD334
RD332
RD330
RD328
RD327
RD326
RD325
RD324
RD322
RD321
RD320
RD319
RD318
RD317
RD316
RD312
RD310
RD308
RD306
RD304
RD302
RD300
RD399
RD398
RD393
RD391
RD390
RD388
RD386
RD384
RD382
RD380
RD378
RD376
RD374
RD373
RD372
RD371
RD370
RD368
RD367
RD366
RD365
RD364
RD363
RD362
RD360
RD358
RD356
RD354
RD352
RD350
RD348
Large Precast Manhole
Pipe To Manhole Connections
Standard Manhole Base Section
24" Manholes
Shallow Manholes
Storm Sewer Pollution Control Manhole
Pipe To Structure Connections
Standard Sanitary Sewer Manhole
Standard Manhole Details
Standard Storm Sewer Manhole
Locator Post
Pipe Slope Anchors - Concrete
Pipe Slope Anchors - Metal
Slotted CMP Drain Details
Coupling Bands For Corrugated Metal Pipe
Safety End Section For Concrete, PVC, HDPE & Polypropylene Pipe
Safety End Section For Metal Pipe
Paved End Slope With Removable Safety Bar(s)
Paved End Slope For Culverts 60" Maximum Pipe Size
Miscellaneous Culvert Details
Sloped Ends For Concrete Pipe
Culvert Embankment Protection And Riprap Pads
Sloped Ends For Metal Pipe
Subsurface Drain
Shallow/Deep Trench Service Connection, Blocking and Markers
Bore Casing Detail
Concrete Encasement, Cradle, and Cap Details
Arch Pipe Backfill/Compaction
Street Cut
Trench Backfill, Bedding, Pipe Zone And Multiple Installations
Stormwater Treatment and Storage Facility Field Markers
Culvert ID Marker
Fill Height Tables For Polypropylene Pipe
Fill Height Table For Steel Reinforced HDPE Pipe
Fill Height Table For Corrugated HDPE Pipe
Fill Height Tables For PVC Pipe
Fill Height Table For Circular Concrete Pipe
Fill Height Tables For Aluminum & Steel Spiral Rib Pipe
Fill Height Tables For Aluminum & Steel Arch Pipe
Fill Height Tables For Aluminum & Steel Corrugated Pipe
Type "3" Catch Basin, Frame and Grate
Inlet Cap & Inlet Adjustment
Miscellaneous Drainage Structures Siphon Box, Area Drainage Basin Or Field Inlet
Concrete Inlet Top, Option 2 Type CG-3
Concrete Inlet Top, Option 1 Type CG-3
Concrete Inlet Base Type CG-3
Ditch Inlet Type D
Concrete Inlets Type M-E, M-O, B And B-SL
Curb Inlet Channel
Concrete Inlets Type CG-1, CG-2
Frames & Grates For Concrete Inlets
Concrete Inlets Type G-1, G-2, G-2M, and G-2MA
Gutter Transition At Inlet
Sanitary Cleanout
Manhole Frame Adjustment
Manhole Slope Protectors
Manhole Covers And Frames
Carry Through Manhole - Storm
Outside Drop Manholes
Sanitary Sewer Piped Inside Drop Connection for Manholes
Manhole With Inlet
Other material, see remarks column=X
Corrugated steel=St
Plastic=Pl
Concrete=Co
Corrugated aluminum=Al
Asbestos cement=AB
Abbreviations for existing pipe materials
Epoxy coated=Ep
Chevron industrial membrane=CIM
Uncoated=U
Polyethylene inside lining, polymeric outside=PO
Polymeric, 10 Mil. thkn. coated both sides=PM
Abbreviations for protective coatings for metal pipe
Elliptical (5% nominal elongation)= E
Round= R
Pipe - Arch=A axis, prior to loading
Cross-sectional shape of pipe normal to longitudinal line for each type of material.
aluminum are acceptable alternates use a separate materials. When galvanized iron or steel and
Cross-sectional dimensions may vary with different of cover shall be measured to subgrade.
for any given run of pipe may vary. Design height used to select pipe materials. The height of cover
Design height of cover is the critical design height the pipe involved.of applicable for the type of material and the diameter
5. All pipes shall conform to the AASHTO specification
4. Dimensions shown are nominal.
Std. Dwg. No. RD326.
metal or corrugations. For connecting details, see
3. Extension of existing metal culverts may be of unlike material throughout.
2. A new pipe culvert installation shall be of like
1. A check ( ) indicates column heading applies.
FOOTNOTES:
GENERAL NOTES:
3 "2
12 " x
B
L
IG
V
CIRCULAR OR ELLIPTICAL
SIZE IN (Inches)
LENGTH IN FEET
PIPE
PIPE - ARCH
HELICAL
Seam or Lock
Welded
Riveted
LENGTH DIMENSIONS
SECTIONAL
CROSS-
SPAN RISE
(Feet-Inches) (Feet)
IN
(P
FO
(R
PP
(C
IT
LV
TI
SI
PH
EW
SA
(S
K S)
J
SL
PE
IM
FE
TR
EN
PH R
SI
IV
(H
S)
USE / INSTALLATION CRITERIA
(F
(Inches)
SIZE
RND
EQUIV.
RADII
CORNER
TREATMENT
TERMINAL
LT.
RT.
SL
60" Dia.
Over
Conc. Pipe
Not For
SK
No.
THKN.
PLATE
SS
"4 1" x 2
RIVETED, WELDED OR LOCK SEAM
SIZE OF CORRUGATIONS
ALUMINUM
IP
il e p u ly
SPIRAL RIB
SMOOTH WALL
SPIRAL RIB
SMOOTH WALL
PLATE THKN.
PLATE THKN.
HELICAL CORRUGATED METAL
ALTERNATE MATERIALS
ALUMINIZED OR GALVANIZED IRON AND STEEL
SIZE OF CORRUGATIONS
RIVETED, WELDED OR LOCK SEAM
1" x 2
11 3" x 1" COATING
44333
IZ
ED
LU
3 "2
12 " x
3 4
LOCK SEAM
3 4
" O.C.2 1@ 11
" x 1"4
Or
1@ 7
3" x 4
3" x 1"
1@ 11
" x 1"4
Or
1@ 7
3" x 4
LOCK SEAM
COATING
LU
4 4
PLASTIC & IRON
IL
PI
PO
LY
PR
PY
LE
E, LL
PO
LY
PY
E, PV
PS
I S
IF
FN
SO
LI
FO
RIGID
REINF.
CONCRETE
PRE-CAST
II
I
IV V
PT
, T
PI
SE
IA
ET
LA
ES
MANHOLES
CONC.
(Feet) (In.)
TYPE
INLETS
APPURTENANCES
EXTENSION
FT
(Feet)
EX
TG
. P
TE
REMARKS
SP
EC
-I
-P
EC
Required Number
OITATROPS
PIPE DATA
R_M25049_pd_01.dgn :: Default 4/27/2026 3:39:59 PM hwye07xR_M25049_pd_01.dgn :: Default 4/27/2026 3:39:59 PM hwye07x
3.0
6 11
110.0
Drain under sidewalk
-1
MH connects to extg. sewer
3.2
BC01
R_M25049_pd_01.dgn :: Default 4/27/2026 3:39:59 PM hwye07x
GENERAL CONSTRUCTION
R_M25049_pl_01.dgn :: Default 4/27/2026 3:40:04 PM hwye07x
J JJ
Sec. 34, T. 4 S., R.1 W., W.M.
HUBBARD
IL
. (P
R/W
K
"RW" LINE
Extg. easement
(See dwg. no. RD700)
Const. curb and gutter
(See dwg. nos. RD930, RD932 & RD938)
(For details, see sht. BB02)
PCC surfacing on new surface - 12 sq. ft.
Inst. safety yellow truncated domes
Const. curb ramp, combination
Const. PCC sidewalk
(For details, see sht. BB03)
PCC surfacing on new surface - 12 sq. ft.
Inst. safety yellow truncated domes
Const. curb ramp, combination
Const. PCC sidewalk
(See dwg. no. RD700)
Const. standard curb
(See dwg. nos. RD300, RD363, RD365 & RD366)
Const. type "CG-1" inlet
Sta. "RW" 996+11.60, 23.7 Lt.
RD344, RD345 & RD356)
(See dwg. nos. RD336, RD339, RD343, FL out - 181.83' (N 12") extg.
FL in - 183.03' (E 12")
FL in - 181.84' (S 12") extg.
5' depth, sl. 1.0%
Inst. 12" storm sew. pipe - 11'
Extra for manhole over extg. sewers
Const. manhole
Sta. "RW" 996+10.79, 34.3' Lt.
(For details, see sht. BA01)
5' depth, sl. 1.0%
Inst. 3" PVC drain pipe - 11'
Sta. "RW" 995+81.30, 27.9' Rt.
(For sht. nos., see sht. A02, signals)
Inst. RRFB - 2
(See dwg. no. RD1010)
Const. inlet protection (Type 7)
C01
R_M25049_pl_01.dgn :: Default 4/27/2026 3:40:04 PM hwye07x
Jakob Eibel
Christina LaFleur
John Hampton
DPROFESSIONALEN
102078
RENEWS: 06-30-2027
JU
LY 11,20
JO
HARLESHAM
Under construction on 10' max. spacing
28" Tubular markers
STAGE I
Access Route
2-Way Temporary Pedestrian
OR99E near Bassilo Dr (Hubbard)
TRAFFIC CONTROL PLAN
ACCOMPANIED BY DWGS.:
TM800, TM821, TM844, TM850
EA01
TZ_M25049_PS_01.dgn :: Default 4/27/2026 3:40:07 PM hwye07x
Jakob Eibel
Christina LaFleur
DPROFESSIONALEN
102078
RENEWS: 06-30-2027
JU
LY 11,20
JO
HARLESHAM
Under construction on 10' max. spacing
28" Tubular markers
STAGE II
Access Route
2-Way Temporary Pedestrian
OR99E near Bassilo Dr (Hubbard)
TRAFFIC CONTROL PLAN
EA02
TZ_M25049_PS_01.dgn :: Default 4/27/2026 3:40:09 PM hwye07x
19 BUTTERFLY DETAILS 18 GEOTECHNICAL DATA 17 SIGNING PLAN, SIGN DETAILS & SIGN AND POST DATA TABLE 16 SIGNING PLAN AND SIGN DETAILS 15 SIGNING PLAN 14 SIGNING & STRIPING PLAN 13 SIGNING & STRIPING LEGEND 12 SIGNING & STRIPING DETAILS 11 SIGN REMOVAL PLAN 10 SIGN LEGEND 9 SIGN INSTALLATION PLAN 8 SIGN DETAILS & SIGN AND POST DATA TABLE 7 SIGN DETAILS 6 SIGN BRIDGE DETAILS 5 SIGN & POST DATA TABLE 4 MISCELLANEOUS 3 MEDIAN MOUNTED SIGN SUPPORT DETAILS 2 FLASHER DETAILS 1 CANTILEVER DETAILSSheet Title Level
UNIT FILE CODE
DFI/TSSU NO.
28.90
SIGNING & STRIPING PLAN
S. Ginsbach
C. LaFleur
TM635, TM671, TM676, TM681, and TM687.
To be accompanied by Standard Drawings TM200, TM201 TM503, TM530, FEET
50 25 50 white bars
Inst. staggered continental crosswalk 2'
PARKING
NO
NOTE:
borders are existing signs.
Signs shown with broken
Remove and save existing sign (N) and remove (M) sign support
Reinstall existing sign (N) on new (M) sign support
Sign 1
N = Sign Number
M = Material
Material options:
W = Wood Sign Post
ST = Perforated Steel Square Tube Sign Support
Pacific Hwy East (OR99E) lm tre t u m tk in riv
Install 28" Surface Mounted Tubular Marker - White
Rotation: 56.76 ° Scale: 1" = 50' directed by the Engineer.
remain in place unless otherwise
Existing signs not shown are to determined in the field.
are approx. with exact locations to be
The locations of sign installations shown
6 Bars
CW-SC
RSN
RIN
RS1
RI1
CW-SC
V. 13, 2
IS
INA L. L
87,105
RENEWS: 12-31-2026 LA01
S-23551
TM_M25049_stpl_01.dgn :: Default 4/27/2026 3:40:12 PM hwye07x
OR99E: NEAR BASILLO DR (HUBBARD) PROJECT
S. Ginsbach
S-23552
SIGN AND POST DATA TABLE
RENEWS: 12-31-2026 LA02N/A
TM_M25049_stpl_01.dgn :: Sign_Post_Table 4/27/2026 3:40:14 PM hwye07x
17 TEMPORARY SIGNAL PLAN 16 TEMPORARY DETECTOR PLAN 15 TEMPORARY RAMP METER PLAN 14 SIGNAL PLAN 13 REMOVAL PLAN 12 RED LIGHT ENFORCEMENT PLAN 11 RAMP METER PLAN 10 RAILROAD PREEMPTION PLAN 9 PEDESTRIAN SIGNAL PLAN 8 MISCELLANEOUS 7 LEGEND 6 INTERCONNECT PLAN 5 FLASHING BEACON PLAN 4 FIRE SIGNAL PLAN 3 EXISTING UTILITIES 2 DETECTOR PLAN 1 DETAILSSheet Title Level
FLASHING BEACON PLAN
Derek Moore sign (W11-2) ASTM type IX sheeting
Install (N=number) aluminum (36"x36") pedestrian crossing
Install (N=number) RRFB rapid flashing bar sign R10-25
Install pushbutton with mount & instruction
Install solar panel energy source pointing arrow plaque (W16-7P) ASTM type IX sheeting
Install (N=number) aluminum (18x30") diagonal downward foundation
Install pedestal with frangible base on number (N=number)
L E G E N D
Traffic Section Approval
OR99E at MP 28.90
PACIFIC HWY EAST AT ELM ST
FLASHING BEACON PLAN
TSSU ID 3F580
Sta. 995+80, 29.8' Rt
Pole 1
TSSU ID 3F581
Sta. 995+80, 23.9' Lt
Pole 2
20 10 20
New PGE owned Pole
RRFB
PBH
SOL
AR
RRFB
SOL
SOL RRFB
ACCOMPANIED BY DWGS.:
TM457, TM467, and TM493
RENEWS: 12-31-2026 MA01
24596
3F581 3F580, TS_M25049_sgps_01.dgn :: Default 4/27/2026 3:40:18 PM hwye07x
17 TEMPORARY SIGNAL PLAN 16 TEMPORARY DETECTOR PLAN 15 TEMPORARY RAMP METER PLAN 14 SIGNAL PLAN 13 REMOVAL PLAN 12 RED LIGHT ENFORCEMENT PLAN 11 RAMP METER PLAN 10 RAILROAD PREEMPTION PLAN 9 PEDESTRIAN SIGNAL PLAN 8 MISCELLANEOUS 7 LEGEND 6 INTERCONNECT PLAN 5 FLASHING BEACON PLAN 4 FIRE SIGNAL PLAN 3 EXISTING UTILITIES 2 DETECTOR PLAN 1 DETAILSSheet Title Level
EXISTING UTILITIES
Traffic Section Approval
EXISTING UTILITY PLAN
20 10 20
RENEWS: 12-31-2026 MA02
24597
TS_M25049_sgps_01.dgn :: Default 4/27/2026 3:40:19 PM hwye07x
17 TEMPORARY SIGNAL PLAN 16 TEMPORARY DETECTOR PLAN 15 TEMPORARY RAMP METER PLAN 14 SIGNAL PLAN 13 REMOVAL PLAN 12 RED LIGHT ENFORCEMENT PLAN 11 RAMP METER PLAN 10 RAILROAD PREEMPTION PLAN 9 PEDESTRIAN SIGNAL PLAN 8 MISCELLANEOUS 7 LEGEND 6 INTERCONNECT PLAN 5 FLASHING BEACON PLAN 4 FIRE SIGNAL PLAN 3 EXISTING UTILITIES 2 DETECTOR PLAN 1 DETAILSSheet Title Level arrow (zero) to equipment located on the pedestal.
show the degrees clockwise from plan sheet north pedestals. Degrees shown in the pole entrance chart
The north arrow shown relates to zero degrees on
PEDESTAL ORIENTATION DIAGRAM
of
Head Signal
Pedestrian
� of Vehicle Signal H ead
� of Pedestrian Signal Head
Ø may be located on a pedestal.
is a clarification of angles of equipment that Equipment shown on the orientation diagram
EQUIPMENT ON POLE
DEG.
SIGNAL
PED.
CABINET
TERM.
SIGN
SIGNAL
TRAFFIC
P O L E E N T R A N C E C H A R T
DEPTH
FOUNDATION
REQUIRED
3 See TM457
NO. NO.
TYPE
1 PPMA01
POLE
CELL
ELECTRIC
PHOTO
NUMBER
FOUNDATION
PUSHBUTTON
PED.SHEET
MA01 PP
34 & 214
33 & 21333 3 See TM457
STE
RED PROFESSIONALEN
ISTINA L. L
AFL
RENEWS: 12-31-2026 MA03
24598
TS_M25049_sgps_01.dgn :: Default 4/27/2026 3:40:21 PM hwye07x
File details come from the government source that posted it. Updated .