00014925 Bid Results.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- I-5 Over Buck Creek Rd. Deck Repair
- Solicitation number
- S-73000-00014925
- Issued by
- Douglas County, Oregon
About this file
This document is a bid tabulation for the Oregon Department of Transportation's (ODOT) I-5 Over Buck Creek Road Deck Repair project, involving concrete bridge deck repairs on the southbound lane at Structure No. BR07569A in Douglas County, Oregon. The invitation to bid (ITB No. S-73000-00014925) was issued on 9/30/25, with bid closing scheduled for 9/30/2025 at 2:00 PM, and five contractors submitted competitive bids: Guido Construction Inc., Wildish Standard Paving Co., Farline Bridge Inc., Oregon State Bridge Construction Inc., and Combined Construction Inc. The project requires approximately 19 cubic yards of High Early Strength Concrete (HESC), temporary work zone traffic control, bridge removal, and installation of permanent traffic control systems, with a substantial completion date of November 21, 2025, and a final completion date of December 22, 2025.
The bid tabulation reveals total bid prices ranging from $381,666.00 to $700,040.00, with significant variations across line items such as mobilization, temporary traffic protection, and concrete work. The project is state-funded with an estimated budget between $500,000 and $1,000,000, to be awarded to the lowest responsive bidder. Contractors must be registered in the OregonBuys system, hold a valid Construction Contractors Board license, and comply with State Buy America requirements mandating that steel, iron, and manufactured products be produced in the United States. While no specific set-aside designations for disadvantaged enterprises are mentioned, bidders must demonstrate financial capability, past performance, and compliance with tax laws and non-discrimination requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 7 Oregon Standard Drawings.pdf | ||
| Attachment A Form A-2 Bid Pricing Form.xlsx | XLSX spreadsheet | |
| WCCLS Consulting Request for Proposals.pdf.docx | DOCX document | |
| Exhibit 5 Special Provisions and Specifications.pdf | ||
| 00014925 Invitation to Bid.docx | DOCX document | |
| Exhibit 6 Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 9/30/25 | ||||||||
| ITB No. | S-73000-00014925 | BIDDER | |||||||
| NAME: | Guido Construction Inc. | Wildish Standard Paving Co. | Farline Bridge, Inc | Oregon State Bridge Construction, Inc. | Combined Construction, Inc | ||||
| Bid Closing: | 9/30/2025 at 2:00 PM | CITY/STATE: | Roseburg, OR | Eugene, OR | Stayton, OR | Stayton, OR | Mukilteo, WA | ||
| Description: | I-5 Over Buck Creek Rd. Deck Repair | CCB# | 183146 | 63256 | 194787 | 180779 | 239380 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | TOTAL | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | 31684 | $31,684.00 | $ 42,000.00 | $42,000.00 | $53,000.00 | $53,000.00 | $55,800.00 | $55,800.00 | $ 75,000.00 | $75,000.00 |
| 2 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | 1 | LS | 49160 | $49,160.00 | $ 68,000.00 | $68,000.00 | $25,000.00 | $25,000.00 | $30,000.00 | $30,000.00 | $ 56,400.00 | $56,400.00 |
| 3 | TEMPORARY SIGNS | 740 | SQFT | 18 | $13,320.00 | $ 0.01 | $7.40 | $35.00 | $25,900.00 | $24.00 | $17,760.00 | $ 22.00 | $16,280.00 |
| 4 | SEQUENTIAL ARROW SIGNS | 2 | EACH | 3275 | $6,550.00 | $ 0.01 | $0.02 | $400.00 | $800.00 | $5,000.00 | $10,000.00 | $ 900.00 | $1,800.00 |
| 5 | PORTABLE CHANGEABLE MESSAGE SIGNS | 3 | EACH | 4400 | $13,200.00 | $ 0.01 | $0.03 | $1,500.00 | $4,500.00 | $16,000.00 | $48,000.00 | $ 2,600.00 | $7,800.00 |
| 6 | RADAR SPEED TRAILER | 2 | EACH | 3500 | $7,000.00 | $ 0.01 | $0.02 | $2,500.00 | $5,000.00 | $3,000.00 | $6,000.00 | $ 2,200.00 | $4,400.00 |
| 7 | FLAGGERS | 240 | HOUR | 85 | $20,400.00 | $ 0.01 | $2.40 | $76.00 | $18,240.00 | $75.00 | $18,000.00 | $ 95.00 | $22,800.00 |
| 8 | TEMPORARY BARRICADES, TYPE III | 5 | EACH | 85 | $425.00 | $ 0.01 | $0.05 | $180.00 | $900.00 | $100.00 | $500.00 | $ 90.00 | $450.00 |
| 9 | TEMPORARY PLASTIC DRUMS | 170 | EACH | 18 | $3,060.00 | $ 80.00 | $13,600.00 | $40.00 | $6,800.00 | $45.00 | $7,650.00 | $ 30.00 | $5,100.00 |
| 10 | TEMPORARY NON-REFLECTIVE TAPE ("BLACKOUT") | 560 | FOOT | 15 | $8,400.00 | $ 5.00 | $2,800.00 | $12.50 | $7,000.00 | $12.50 | $7,000.00 | $ 25.00 | $14,000.00 |
| 11 | TEMPORARY BARRIER | 960 | FOOT | 35 | $33,600.00 | $ 40.00 | $38,400.00 | $15.00 | $14,400.00 | $30.00 | $28,800.00 | $ 46.00 | $44,160.00 |
| 12 | TEMPORARY IMPACT ATTENUATOR, NARROW SITE SYSTEM | 1 | EACH | 9777 | $9,777.00 | $ 7,000.00 | $7,000.00 | $3,740.00 | $3,740.00 | $4,500.00 | $4,500.00 | $ 6,900.00 | $6,900.00 |
| 13 | TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED | 1 | EACH | 7350 | $7,350.00 | $ 15,000.00 | $15,000.00 | $1,000.00 | $1,000.00 | $8,400.00 | $8,400.00 | $ 9,000.00 | $9,000.00 |
| 14 | REFLECTIVE BARRIER PANELS | 82 | EACH | 38 | $3,116.00 | $ 40.00 | $3,280.00 | $45.00 | $3,690.00 | $35.00 | $2,870.00 | $ 70.00 | $5,740.00 |
| 15 | REPAIR TEMPORARY IMPACT ATTENUATOR, NARROW SITE SYSTEM | 1 | EACH | 1450 | $1,450.00 | $ 1,500.00 | $1,500.00 | $500.00 | $500.00 | $1.00 | $1.00 | $ 2,500.00 | $2,500.00 |
| 16 | REPAIR TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED | 1 | EACH | 4750 | $4,750.00 | $ 0.01 | $0.01 | $500.00 | $500.00 | $1.00 | $1.00 | $ 2,500.00 | $2,500.00 |
| 17 | MINIMUM DEFLECTION BRIDGE TEMPORARY BARRIER | 90 | FOOT | 85 | $7,650.00 | $ 100.00 | $9,000.00 | $95.00 | $8,550.00 | $140.00 | $12,600.00 | $ 158.00 | $14,220.00 |
| 18 | TEMPORARY WORK ACCESS AND CONTAINMENT | 1 | LS | 28100 | $28,100.00 | $ 40,000.00 | $40,000.00 | $175,000.00 | $175,000.00 | $85,000.00 | $85,000.00 | $ 70,800.00 | $70,800.00 |
| 19 | EROSION CONTROL | 1 | LS | 12000 | $12,000.00 | $ 1,000.00 | $1,000.00 | $2,500.00 | $2,500.00 | $7,500.00 | $7,500.00 | $ 5,000.00 | $5,000.00 |
| 20 | POLLUTION CONTROL PLAN | 1 | LS | 4500 | $4,500.00 | $ 0.01 | $0.01 | $500.00 | $500.00 | $1,000.00 | $1,000.00 | $ 5,000.00 | $5,000.00 |
| 21 | BRIDGE REMOVAL WORK | 1 | LS | 27500 | $27,500.00 | $ 30,000.00 | $30,000.00 | $75,000.00 | $75,000.00 | $85,000.00 | $85,000.00 | $ 91,000.00 | $91,000.00 |
| 22 | REINFORCEMENT, GRADE 60 | 1 | LS | 17664 | $17,664.00 | $ 25,000.00 | $25,000.00 | $32,000.00 | $32,000.00 | $35,000.00 | $35,000.00 | $ 36,050.00 | $36,050.00 |
| 23 | DECK CONCRETE, HIGH EARLY STRENGTH CONCRETE (HESC) | 19 | CUYD | 2950 | $56,050.00 | $ 6,000.00 | $114,000.00 | $3,600.00 | $68,400.00 | $3,600.00 | $68,400.00 | $ 9,300.00 | $176,700.00 |
| 24 | HOT APPLIED JOINT SEALANT | 1 | LS | 2500 | $2,500.00 | $ 6,000.00 | $6,000.00 | $1,500.00 | $1,500.00 | $10,000.00 | $10,000.00 | $ 10,000.00 | $10,000.00 |
| 25 | DELINEATORS, TYPE 5 | 6 | EACH | 250 | $1,500.00 | $ 25.00 | $150.00 | $50.00 | $300.00 | $30.00 | $180.00 | $ 40.00 | $240.00 |
| 26 | MONO-DIRECTIONAL WHITE TYPE IAR MARKERS, RECESSED | 2 | EACH | 230 | $460.00 | $ 200.00 | $400.00 | $200.00 | $400.00 | $200.00 | $400.00 | $ 400.00 | $800.00 |
| 27 | PAVEMENT MARKING TAPE, ROLLED-IN, PATTERNED, WET WEATHER | 700 | FOOT | 15 | $10,500.00 | $ 11.25 | $7,875.00 | $11.25 | $7,875.00 | $11.25 | $7,875.00 | $ 22.00 | $15,400.00 |
| TOTAL | $ 381,666.00 | $ 425,014.94 | $542,995.00 | $ 558,237.00 | $ 700,040.00 |