This document is a series of Task Work Orders issued by the Florida Department of Transportation (FDOT), District 4, for professional surveying and utility locating services. The primary contractor is InfraMap Corp, located in West Palm Beach, Florida, operating under Contract No. C-8G69. The documents cover multiple task work orders spanning from 2007 to 2010, with various amendments and modifications to the original contract.

The task work orders primarily involve utility designation, subsurface utility engineering (SUE), and utility locating services for various state road projects in Florida counties including Broward, Palm Beach, Indian River, and St. Lucie. The total contract authorizations across these work orders range from approximately $493,628 in the initial task work order to over $726,509 by the final documented task work order. Each task work order covers specific road segments, with scopes including electronic designation of site utilities, field sketching, test hole excavation to confirm utility locations, records research, and coordination with utilities and FDOT surveyors. The contract appears to be an indefinite delivery vehicle allowing for multiple task-based assignments with flexible funding allocations and periodic amendments to adjust project scope and compensation.

View the file

Other files

File Type Posted
ContractDeliverablesExport (1).csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMEN1,Ce TROt!OP8MAjiOI~ ~

~l~n 375-030-25

TASK WORK ORDER FOR PRu... t:~1.i 1~2, PROCUREMENT 05105 i 1--1 \..-17 Page 1 016

Consultant: InfraMap Corp '---' ~ -, \ )i \ \ i Address: 1860 OLD okeechobee Road ;U ~ SEP \ 820~LJ \Suite 514

West Palm Beach, Florida 33407

\ DISTRICT IV

·""' ..... ~Itd I) "'...... .-nr,ONTRACTUAL.

(To be entered uppn execution of TW.O.) 16}\!bfcfe~~\:''''' ,... ~ ~ , Date: 8/8/2007 Task Wor r er No.: 2SJ:..BY.!CES_

Contract No. C-8G69 Payment FM No.: 23002953201

Brief Task Description:

Designate and pothole (4) mast arms, (57) drainage structures, (1) cantilever sign, and 8,000 feet for proposed drainage pipe.

Additionally designate areas for (60) light polees .

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services). All services required under this Task Work Order will be completed on or before: 9/21/2009

The total amount or the limiting amount of the compensation will be: $81,297.65

Compensation elements are as follows:

Element Description Method of Compensation Amount Est* b.U.E. Services (LA4) Units worked at loaded billing rates in Table 6

$81.297.6~ E n $O.O( eITS ,. ~ $0.0< _. -'"

~~!~Wl1~:X)_JL~\ - - $0.0<

A.I&;a.... -.

Page 1 Tota $81,297.6~

Page 2 thru 6 Subtota $0.0<

Tota $81,297.6:

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive. Balance remaining $106,371.95 KEO

Assignment completion due date 10/19/2007

Total authorizations to date (including this one):

$493,628.05 i ./

Departmental Approval:

~EJ:LC!Robert H. Hughan District Surveyor (name) (title) (signatt1re) /J

Consultant Acceptance: A£?Jay Scagliola Proiect Administrator (name) (title) f/ (Signature) ,*L'1mi'tlng or Estimated/Budgeted Amount.

Distribution

"A~~"~'~~AArn"""_~AnO' · ~~-~~\\7>~n TASK WORK ORDER AMENDMENT FOR ~ PROCURE~I:Ir-1

FOR PROFESSIONAL SERVICES SEP i 8 2007 21~ Consultant:

InfraMap Corp

-J"lW'Tn i"'" 1\ VI\) , flIv, I vAddress:

1860 Old Okeechobee Road. Suite 514. West Palm Beach, Florida 33407 PROFESSIONAL &OTHER CONTRA Contract Number: (To be entered upon executi n ofTask Work Orde ) C-8G69 Date: 8/30/2007

Payment FM No. (must be the same as original Task Work Order):

Amendment No. 1 to Task Work Order No. 20 23002953201

Purpose of Amendment:

Add senior engineer to assignment

TUAL

Check all applicable terms: o The time for completion of services for the subject task work order is extended thnu o The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 0.00.;..;..;;..;;...----o The subject task work order is hereby canceled (no work has been performed and no payment is due).

181 The total amount for services performed under this task work order is increased by $ 21,105.00 The additional funds will be allocated to the following compensation elements described below.

o The total amount for services performed under this task work order is decreased by $ 0.00

The decrease in funds will be allocated to the following compensation elements described below.

o There is no increaseldecrease in the task work order amount. funds are only redistributed between compensation elements. Revised compensation elements are described below.

Compensation Element Method of Previous This Amendment SubtotalDescription Compensation Amount Amount r:>ue Services (LA4) Units worked at loaded billing ates in Table 6 $81,297.61 $21,105.0( $102,402.6

$O.OC $O.OC $O.O(

$O.O( $O.O( $0.0(

V'f, $O.O( $O.OC $O.O(

- ~:y r~

REVU;WN>.~( ,"

i

$O,OC $O.OC $O.O(

DAT~: '-"'\ .... ./

$O,OC $O,OC $O,O(

Page 1 subtotals $21.105,OC $102,402,61

Page 2 through 5 subtotals $O,OC $O,O( his Amendment [r,W,O.

otal rotal o Other Notes: $21,105.0C $102,402,6:

Check if Estimate

An independent assessment of the staff hours and quantities fopr the proposed services has been performed and bund fair, reasonable and competitive.. Balance remaining $282.810.53 KEO

Attachments:

otal Contract Authorizations to Date Including this Amendment $ 517,189.47 Departmental Approval:

Robert H. Hughan District Surveyor name)

Consultant Acceptance:

title

Jay Scagliola Project Administrator name (title

Distribution:

http:282.810.53 http:21,105.00

STATE OF FLORIDA DePARTMENT OF TRANSPORTATIO

TASK WORK ORDER AMENDMENT

FOR PROFESSIONAL SERVICE

Consultant:

InfraMap Corp

Address:

1860 Old Okeechobee Road, Suite 514, West Palm Beach, Florida, 33407

Contract Number: (To be entered upon e cution of Task Wor C-8G69 Date: 11/2/2007 i PROFESSIONA &

Amendment No. 2 to Task Work Order No. 20

Purpose of Amendment:

Additional survey time for added drainage structures

Payment FM No. (must be the same as origi .'

23002953201

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru o The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authoriz.ed against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order S o The subject task work order is hereby canceled (no work has been performed and no payment is due).

181 The total amount for services perfomned under this task work order is increased by $ 2,411.22

The additional funds will be allocated to the following compensation elements described below.

o o The total amount for services performed under this task work order is decreased by S 0.00 The decrease in funds will be allocated to the following compensation elements described below.

There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Compensation Element Method of Previous This Amendment Subtotal

Description Compensation Amount Amount p.U.E. Services (LA4) Units worked at loaded billing rates in Table 6 $102,402.6~ $2,411.2~ S104,813.8

$O.OC

/1

$0.0 $O.OC

I I $O.OC $0.0 SO.OC

I J /

CITS ~W{ $O.O! $0.0 $O.OC

REVIElA 'f\~~~1) 1\\

'-" SO.O! $O.O! $0.0(

na."I'R.-_.

$O.O( $O.OC $O.OC

Page 1 subtotals $2,411.2 $104.813.87

Page 2 through 5 subtotals $O.DC $O.DC

This Amendment W.o.

otal Total o Other Notes: $2,411.2, $104,813.81

Check if Estimate

An independent assessment of the staff hours and quantities for the proposed services has been perfomned and found fair, reasonable and competitive.

Balance remaining $271,145.61 KEO

Attachments:

otal Contract Authorizations to Date Including this Amendment $ 528,854.39 Departmental Approval:

Robert H. Hughan District Surveyor name) tille) onsultant Acceptance:

Jay Scagliola Project Administrator name (title)

Distribution:

http:271,145.61 http:2,411.22 http:authoriz.ed

I~~t- ~w~~

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 37~30-26 ,

TASK WORK ORDER AMENDMENT FORM IU'\ DEC 1 1P~o~tENT02105;

FOR PROFESSIONAL SERVICES -_JConsultant: DISTFilCf IVInfra Map Corp .'" ,~-~

11vrt:vvIUI~ML &. U JNtH GUN IAddress; f{!ICTUAL 1860 Old Okeechobee Road, Suite 514, West Palm Beach, Florida 33407 , SERVICES

(To be entered upon execution of Task Work Order Amenament) Contract Number:

Date: 11/30/2007

Payment FM No. (must be the same as original Task Work Order):

C-8G69

Amendment No. 3 to Task Work Order No. 20 23002953201

Purpose of Amendment:

Added survey to perform SUE work on relocated drainage ditch

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru o The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order S 0.00

.::..:.;;;;.:::.---- o The subject task work order is hereby canceled (no work has been performed and no payment is due).

181 The total amount for services performed under this task work order is increased by $ 8,017.12=.c...:...:...:.=...___

The additional funds will be allocated to the following compensation elements described below.

o The total amount for services performed under this task work order is decreased by S 0.00.::..:.;;;;.:::.---- The decrease in funds will be aliocated to the following compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Compensation Element Method of Previous This Amendment Subtotal

Check if Description Compensation Amount Amount Estimate

!S.U.E. Services (LA4) Units worked at loaded billing $112,830.9~ ~rates in Table 6 $104,813.8 $8,017.1

SO.OC SO.OC $O.OC 0

n SO.OC SO.OC $O.OC 0

~V $O.OC SO.OC $O.OC 0

I--- ~\):;~ 'tUREVIEW]~~ $O.OC SO.O( SO.OC 0

DATE: >-p h v' I 0\.? so.oc SO.oc so.oc

Page 1 subtotals S8,017.1 $112,830.9~

Page 2 through 5 subtotals SO.OC SO.OC his Amendment .W.O.

otal Total o Other Notes: $8,O17.1~ $112,830.9~ i

I

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive.

Balance remaining $215,528.85 KEO

Attachments:

otal Contract Authorizations to Date Including this Amendment S 584,471.15 epartmental Approval:

Robert H. Hughan District Surveyor name title onsultant Acceptance:

Jay Scagliola Project Administrator name) title

Distribution:

http:215,528.85 http:8,017.12

STATE OF FLORIDA DEPARTMENT OF TRANSPORTAnON 375-030-26

PROCUREMENTTASK WORK ORDER AMENDMENT FORM

02/05

FOR PROFESSIONAL SERVICES

Consultant;

InfraMap Corp.

Address;

1860 Old Okeechobee Road, Suite 514, West Palm Beach, Florida 33407

Contract Number:

C-8G69

(To be entered upon execution of Task Work Order Amendment) Date: 11/13/2007

Amendment No, 4 to Task Work Order No, 20 Payment FM No. (must be the same as original Task Work Order):

23002953201

Purpose of Amendment:

Additional survey time required for drainage ditch

Check all applicable terms: o The time for completion of services for the subject task work order is extended Ihru o The subject task work order is hereby closed, Final payment for the task work order has been paid. No addilional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 0.00

""'"''-''----- o The subject task work order is hereby canceled (no work has been performed and no payment is due).

181 The total amount for services performed under this task work order is increased by $ .::31.:.2:,:5:..:5:..:,.4.,;;2=-___ The additional funds will be allocated to the following compensation elements described below.

o The total amount for services performed under this task work order is decreased by $ 0.00

The decrease in funds will be allocated to the following compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Method of Previous This Amendment Check ifCompensation Element SubtotalAmount AmountDescription Compensation Estimate

S.U.E. Services (LA4) Units worked at loaded billing rales in Table 6 $112,830.9~ $3,255.42 $116,086.41 ~

P r- [\

$O.OC $O.OC $O,OCII~ 0~(C;~ IWI! 11

l_J '--./ '----' '-'--

-~-- so.oc $O.oc $O.oc 0'I f\\

- l/u \ ~ I DEC 2 12007 $O.oc $O.oc $O.oc 0- !

! L- DISTRICT iV $O.oc $O.oc $O.oc 0 "lnn["'ttN'lmllll q. ,..;...... <:;"" r;ONiFlACT JAL : ,'v' rv"lIv''''''st.MVle'ES _.~.- _,J::.r.. $O.oc $O.O($O.OC."' ~,,~ 0

L Page 1 subtotals $3,255.4~ $116,086.41

Page 2 through 5 subtotals $O.O($0.00 CITS rrhis Amendment rr·w.O.

trotal ~olal

$3,255.4:;

REVIEWED BY,&U

$116,086.41o otD'&~E: \ - ()}

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive.

Balance remaining $208,881.48 KEO

Attachments:

otal Contract Authorizations 10 Date Including this Amendment $ 591.118.52 Departmental Approval:

Robert H. Hughan name

District Surveyor title onsultant Acceptance:

Jay Scagliola name

Project Administrator title

Distribution:

http:208,881.48 http:116,086.41 http:116,086.41 http:116,086.41 http:3,255.42

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375-030-26

02105

FOR PROFESSIONAL SERVICES

I Consultant:

Infra Map Corp

Address:

1860 Old Okeechobee Road, Suite 201, West Palm Beach, Florida 33409

Contract Number:

C-8G69

(To be entered upon execution ofTask Work Order Amendment) Date: 9/4/2009

Amendment No. 5 to Task Work Order No. 20 Payment FM No. (must be the same as original Task Work Order):

23002953201

Purpose of Amendment:

close out work order 57-07

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru

181 The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 904.54 o The subject task work order is hereby canceled (no work has been performed and no payment is due).

The total amount for services performed under this task work order is increased by $ 0.00 o .=;;..0..-____ o The total amount for services performed under this task work order is decreased by $ 0.00.::.:..::.-=---- The decrease in funds will be allocated to the following compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Page 1 subtotals PSU Page 2 through 5 subtotals ~hi-s~Am--en-d~m-e~nt~~.W~.O~.-------1Reviewed By: a&n otal otal o Other Notes: Date Submitted: e'l1~.6~ $0.0 elTS Approved Date: __ New Contract: ___

Compensation Element Description

Method of Compensation

Previous Amount

$0.0

$0.0

$0.0

This Amendment Amount

$0.0

$0.0

$0.0

Subtotal

$0.0

Check if Estimate

Attachments:

olal Contract Authorizations to Date Including this Amendment $ 0.00

Departmental Approval:

Robert H. Hughan District Surveyor name title onsultant Acceptance:

Jay Scagliola Project Administrator name title

Distribution:

~p E~~~~W~~~~!STATE OF FLORIDA DEPARTMENT OF TRANSPO

TASK WORK ORDER FOR PROFESSIC

NOV 1 ~ ,nn7rj.ge of 6

Consultant: InfraMap Corp

Address: 1860 Old Okeechobee Road DISTRICT IV Suite 514 PROFESSIONAL &OTHER CONTRACTUAL West Palm Beach, Florida 33409 SER~_gE~

(To be entered upon execution ofT.W.O.)

Task Work Order No.: 21

Date: 11/212007

Contract No. C-8G69 Payment FM No,: 23002953201

Brief Task Description:

see attached

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services). All services required under this Task Work Order will be completed on or before: 9/2112009

The total amount or the limiting amount of the compensation will be: $6,599,64

Compensation elements are as follows:

Element Description Method of Compensation Amount Est* p,U£ Services (LA4) Units worked at loaded billing rates in Table 6

$6,599,6 E f\ $O.O(

~N $O.O( pITS .~ ,'\)..~nB~P. '\ ~ - $O.O(

·J:t,DW- \ \.-l\:)-v - Page 1 Tota $6,599.6L- DA.LP - \. Page 2 thru 6 Subtota $O,O(

Tota $6,599.6L

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive. Balance remaining $264,545.97 KEO

Assignment completion due date 11/16/2007

Total authorizations to date (including this one):

$535,454.03

Departmental Approval: ItL6);X X~ Robert H. Hughan District Surve~or

• (name) (title) (lignatu~) //

Consultant Acceptance: $~Ja~ Scagliola Project Administrator (name) (title) /' (sign~)

'Limiting or Estimated/Budgeted Amount. /' Dlstnbutlon

October 31, 2007

Mr. Robert H. Hughan, PLS District Surveyor Florida Dept. of Transportation Surveying and Mapping - District 4 3400 W. Commercial Blvd.

Ft. Lauderdale, FL 33309

InfraMap Corp # 07302

Reference: Contract FM No. : 23002953201 Contract No.: C-8G69 project FM No.: 4153171 State Project No.: 93140-xxxx CITS Work Order No.:21 State Road: 700 County: Palm Beach Survey Log No. : 85-07 Requested By: Cassandra Piche 954-777 4335 Limits: Guardrail from St 31+10 to

42+00 Rt

As requested in your letter dated (October 17, 2007), InfraMap Corp (IMC) is pleased to submit the following proposal for utility locating costs associated with the above referenced project. The work to be performed and contract fees, are as follows:

DESIGNATION OF UTILITIES

Utility designation will be performed in the areas as marked on the supplied plan sheets. We will identify potential confl ts within the marked locations. When conflicts are identified, a test hole will be dug to confirm the location, elevation and type of utility. Our standard test hole report will be generated for each test hole showing the pertinent information and this turned over to the F.D.O.T. project surveyors. Detailed field notes will be generated those areas where there are no utility conflicts. The general tasks to be performed include the following in addition to the specified scope:

*Records research and eval.

*Coordination with utilities, F.D.O.T. surveyors and engineers.

*Electronic ignation of site utilities.

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375-030-25

02105

FOR PROFESSIONAL SERVICES

I Consultant:

InfraMap Corp

Address:

1860 Old Okeechobee Road, Suite 201, West Palm Beach, Florida 33409

Contract Number:

C-8G69

(To be entered upon execution of Task Work Order Amendment) Date: 9/412009

Amendment No. 1 to Task Work Order No. 21 Payment FM No. (must be the same as original Task Work Order):

23002953201

Purpose of Amendment:

close out work order 85-07

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru

181 The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 226.14=:..;...:..-=----o The subject task work order is hereby canceled (no work has been performed and no payment is due).

o The total amount for services performed under this task work order is increased by $ 0.00

The additional funds will be allocated to the following compensation elements described below.

o The total amount for services performed under this task work order is decreased by $ 0.00 =-=----- The decrease in funds will be allocated to the following compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Compensation Element Method of Previous This Amendment Check if SubtotalCompensation Amount AmountDescription Estimate

$O.OC $O.OC $O.OC 0

.'-. ... "... y ... ." $O.OC $O.OC $O.OC 0

JtJ 0 ; 2010 $O.OC $O.OC $O.OC 0

DISiRI;i IV $O.OC $O.OC $O.OC 0 iAI o. I"oiTUCD"'''''' ...... ,"'''IIAI

~ ~.............,-- ,,-SeRvI CES $O.OC $O.oC $O.OC 0

$O.OC $O.OC SO.OC 0

Page 1 subtotals $O.OC $O.OCPSU Page 2 through 5 subtotals $O.OC $O.OC rrhis Amendment rr.w·O.Reviewed By: ~ irotal Irotal

Date Submitted: alJl'itt4 $O.OC $O.OC o Other NoteCITS Approved Date: _'__ New Contract: ___

Attachments:

otal Contract Authorizations to Date Including this Amendment $ 0.00 Departmental Approval:

Robert H. Hughan District Surveyor onsultant Acceptance:

Jay Scagliola Project Administrator name title

,,'re,mO.MO£pAAm'~O"""~OR" Q~~~w~ ~4ro~' TASK WORK ORDER FOR PROFESSION l ~f\=-= . .. PR( CU E~;/~~ r\ Pae 016

Consultant: InfraMap Corp U \j j NOV iJ 12007 L:/ Address: 1860 Old Okeechobee Roar L ...._

Suite 514 Dlb i Hii.i i IV West Palm Beach, Florida 33409 PROFESSIONAL &OTHER CONTRACTUAL

SERVICES

(To be entered upon execution ofT.W.O.)

Task Work Order No.: 22 Date: 10/2212007

Contract No. C-8G69 Payment FM No.: 23002953201

Brief Task Description:

see attached

Scanning and surveying light poles only

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached ~~~(Scope of Services). All services required under this Task Work Order will be completed on or before: g,~er2ee9 9 2.1 &(109 ~

The total amount or the limiting amount of the compensation will be: $4.021.43

Compensation elements are as follows:

Element Description Method of Compensation Amount Est*

~. U, E. Services (LA4) Units worked at loaded billing rates in Table 6

$4,021.4; E

$0.0(

1\ I $0.0(

"~~10 $0.0{ .....0 _.. -oQn

:.-~, fE'WEl? I:f~:Ji::J~ 1 -- Page 1 Tota $4,021.4 p

~-- Page 2 thru 6 Subtota $O.O(.......~.

U,J;IIo"- Tota $4,021.4

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive. Balance remaining $278,789.10 KEO

Assignment completion due date 11/29/2007

Total authorizations to date (including this one):

$521,210.90

Departmental Approval:

LLi~Robert H. Hughan District Surveyor (name)

Consultant Acceptance:

Jay Scagliola (name)

(title)

Proiect Administrator (title)

(si~tyre»)<. ~

/,/ /' (signature)

I

I

·Llmltlng or Estimated/Budgeted Amount.

October 22 I :i,007

Mr. Robert:. H"

District Surveyor

Florida Dept of 'I'rans],:-cl""Cacion

Surveying and Nappi:n;; ;3 ct 4

3400 ~V'. Commercial E,,;, .... ..,. ....~,Ft. Lauderdale, FL .. ~ ~".e, to

Inira."1ap Corp #

Reference; Cont :~ ~o: 23002953201

Cent C-8G69

Projc:":I: ""::: :,,~). : 4138421

State.S: .,2e': No.: 93100-xxxx errs ';"].;}:c G:cd~r No. : 22

State P0~ : 25/US27

Palm Beach l~:.,:; IJ,::; 88- 07

Kenzot J"asmin 954-777-4462 Hendry Coun t::.o north of SR 80

InfraMap Corp (INC) ,,~; to submit the followIng proposal for utility l')cating CC':" C;:i eS£r..)ciated with (surveying designat:ing 1:5 light: .j "":.:; from station 660+71 to station 676+95 I offset 51 ft., rig]::t) ,- the above referenced proj !Bet as described in S(:()7>";: c, '. ",~, 'I'he work to performed and contract fees are a.s i"7;:,.

DESIGN-~TrON OF UTIL.~ "

Utili ty deSignation "7~ 1.," hC>. p9rformed in the areSl.s El.F: mCl.rk~d Or' the supplied plan shec Vie 11 identify paten 1 conflicts wi thin the mcl:l:ked lo;::;"'.:;.or.<!3, 1.rTnen conflicts are identified, a test hole wilL be Oliq \.0 cu,~f the location, elevation and type of utility. OU.::;'" SC.~l ... ;;:",~;:.. ..: :(;;::.;'" report will be for each test hol (:; shOt'!:Lr:£i ~::'-E' p~::t.inent inforrna tion and this tl.:;;cned over to the F, D.O. rp, ~.;. 'i~<t :;urveyors. Detailecl field notes will be gene~::atec1 ::,::,,~:, :' a r~~as Ttv"here there are no utility conflicts. 'I'he g-en:'??:2.' to be performed include the tollowing. in addi tiun 1:'..1 '.:•.:1s specified scope!

*Records rese,irch a:nc:c·,,:::::'ieval.

*Coordina t ion with '!..l t i. :::: ';;:;5 j F. D.O. T. surveyors and eng~nee!'s.

*Electronic :iL::signa';.i'::~ :::~ t~ utilities.

E0/(;0 39'Vd Ii119S9nSI 81:L0 L80(;/51/01

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER AMENDM [IlISRM FOR PROFESSIONAL SER IEWED BY PSU -I-ll--

Consultant:

Infra Map Corp

,Address:

1860 Old Okeechobee Road Suite 514 West Palm Beach Florida 33409

DATE:

Contract Number:

C-8G69

(To be entered upon execution ofTask Work Order Amendment) Date: 11/2/2007

Amendment No. 1 to Task Work Order No. 22 Payment FM No. (must be the same as original Task Work Order):

23002953201

Purpose of Amendment:

Add guardrail and light pole test holes

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru o The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 0.00

;:;.;.;:;..~----o The subject task work order is hereby canceled (no work has been performed and no payment is due).

181 The total amount for services perfonned under this task work order is increased by $ 41,422.45

The additional funds will be allocated to the following compensation elemenls described below.

o The lolal amount for services perfonned under this task work order is decreased by $ 0.00

The decrease in funds will be allocated to the follOwing compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Compensation Element Method of Previous This Amendment Subtotal

Description Compensation Amount Amount p.U.E. Services (LM) Units worked at loaded billing rates in ...· "'.

$4,021.4 $41,422.4f $45,443.8~

~~(G\§,~~V'G n\ $O.OC $O.OC $O.OC

~<~J-

\ \ \ , \-./.J i

$O.OC $O.OC $O.OC

l\ \,) NOV ,~ 1..1 ~Uf I $O.oc$O.oc $O.oc

I 1 '--5\SfRiCi \\J $O.oc $O.oc $O.oc

.... "'''',('\II.lIII ~ ()THERCONiR{l.C1U{l.L WMurl::.\J\JIV''' '-SEfWIO S .-I

....... SO.OC $0.0( SO.OC

Page 1 subtotals $41,422.4f $45.443.8E

Page 2 through 5 subtotals SO.OC SO.OC

[This Amendment irotal if.w·o.

'rota I o Other Notes: $41,422.4~ $45,443.8E

Check if Estimate

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive.

Balance remaining $223,123.52 KEO

Assignment completion due date 11/30/2007

Attachments:

otal Contract Authorizations to Date Including this Amendment $ 576,876.48 .

Departmental Approval:

Robert H. Hughan name

District Surveyor title onsultant Acceptance:

Jay Scagliola name

Project Administrator title

Distribution:

http:223,123.52 http:41,422.45

02105

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375-030·26

PROCUREMENTTASK WORK ORDER AMENDMENT FORM

FOR PROFESSIONAL SERVICES

Consultant:

Infra Map Corp

Address:

1860 Old Okeechobee Road, Suite 514, West Palm Beach, Florida 33409 i

Contract Number:

C-8G69

(To be entered upon execution of Task Work Order Amendment) Date: 11/30/2007

Amendment No. 2 to Task Work Order No. 22 Payment FM No. (must be the same as original Task Work Order):

23002953201

Purpose of Amendment:

Additional test holes to complete assignment

Check all applicable terms:

o The time for completion of services for the subject task work order is extended thru o The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 0.00

.::.:..;;..:=----o The subject task work order is hereby canceled (no work has been performed and no payment is due).

181 The total amount for services performed under this task work order is increased by $ 3,391.95

The additional funds will be allocated to the following compensation elements described below.

::.c..:::..:...o The total amount for services performed under this task work order is decreased by $ 0.00 ____

The decrease in funds will be allocated to the following compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

PreviOUS This Amendment Check ifCompensation Element Method of Subtotal Estimate

~.U.E. Services

Description Compensation Amount Amount

(LA4) Units worked at loaded billing rates in Table 6 $3,391.9f $48,835.8$45,443.8 181

$O.OC $O.OC$O.OC 0

$O.OC $O.OC$O.OC 0~(f CITS $O.OC $O.OC$O.OC 0lJBY~U~:uiMO-JL...... --- ,J,:/( ~ ~U' I $O.OC $O.OC$O.OC 0DATE:

$O.OC$O.OC$O.OC 0

Page 1 subtotals $3,391.9: $48,835.8

Page 2 through 5 subtotals $O.OC SO.OC

!This Amendment [r.w.O.

iTotal Total

$3,391.9~ $48,835.8o Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive.

Balance remaining $212,136.90 KED

Attachments:

otal Contract Authorizations to Date Including this Amendment $ 587,863.10 name title i Jay Scagliola Project Administrator name) title http:587,863.10 http:212,136.90 http:3,391.9f http:3,391.95

Description p

Method of Compensation

~kN 04 2010

Ol5Rlct IV

Previous Amount

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

This Amendment Amount

Subtotal Check if Estimate

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375,03Q..26

PROCUREMENTTASK WORK ORDER AMENDMENT FORM

FOR PROFESSIONAL SERVICES

Consultant:

InfraMap Corp

Address:

1860 Old Okeechobee Road, Suite 201, West Palm Beach, Florida 33409

Contract Number:

C·8G69

(To be entered upon execution of Task Work Order Amendment) Date: 9/4/2009

Amendment No. 3 to Task Work Order No. 22 Payment FM No. (must be the same as original Task Work Order):

23002953201

Purpose of Amendment:

close out work order 88·07

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru

181 The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 2,041.05

=~;:;...;;..---o The subject task work order is hereby canceled (no work has been performed and no payment is due), o The total amount for services performed under this task work order is increased by $ 0.00.:.;....'-'----- The additional funds will be allocated to the following compensation elements described below.

o The total amount for services performed under this task work order is decreased by $ 0.00

The decrease in funds will be allocated to the following compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

PSI I Page 1 subtotalsl-____$_O_._0-t-_____-l

'I./1 ~age 2 through 5 subtotals $0.0

Reviewed By: n.J~ I=hc-:-is--=A-m-en-:'dm-e-nt--l::::-:-W-:-:".O'=-.-----l otal otal

Date Submitted: I) \ It 5.1i ()o Other Notes: $0.0 eiTS Approved Date: _-

New Contract: __

Attachments:

otal Contract Authorizations to Date Including this Amendment $ 0.00 Departmental Approval:

Robert H, Hughan name onsultant Acceptance:

Jay Scagliola name

District Surveyor

Project Administra title tor title http:2,041.05

VI

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375-030-25" '.

U.REMENTTASK WORK ORDER FOR PROFESSIONAL SERVlrES . 05105IZ. age 1 of 6 ..

Consultant: InfraMap Corp '. ·.:i.

L- r

Address: 1860 Old Okeechobee Road

Suite 514 West Palm Beach. Florida 33409

(To be entered upon execution ofTW.O.)

Date: 2/5/2008

Task Work Order No.: 23

Contract No. C-8G69 Payment FM No.: 23002953201

Brief Task Description:

see attached

In accordance with the above referenced contract. you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services). All services required under this Task Work Order will be completed on or before: 9/21/2009

The total amount or the limiting amount of the compensation will be: $1.133.59

Compensation elements are as follows:

Element Description Method of Compensation Amount Est* j.UE Services (LA4) Units worked at loaded billing rates in Table 6

$1.133.5~ E

$O.O(

$O.O(

~/ $O.O( lJl·J,." .- RVPSU ~ Page 1 Tota $1.133.5~

REV J.EA.......; I C) /O'/) - Page 2 thru 6 Subtota $O.O(

DAT.tA!- Tota $1.133.5f

Other Notes:

An independent assessment of the staff hours and quantities for the vproposed services has been performed and found fair.

reasonable and competitive. Balance remaining $211.003.31 KEO

Assignment completion due date 2/15/2008

Total authorizations to date (including this one):

$588.996.69

Departmental Approval: /ltffriVRobert H. Hughan District Surveyor (name) (title) r '1sigr¢ur~ --

Consultant Acceptance: ~~Jay Scagliola Project Administrator (name) (title) /' ' {Srg nature)

*Limiting or Estimated/Budgeted Amount. /

February I, 2008

District Surveyor Florida Dept. Transportation Surveying and Mapping - strict 4 3400 W. Commercial Blvd.

Ft. Lauderdale FL 333091

InfraMap Corp # N/A

Reference: Contract FM No. : 23002953201 Contract No. : C-8G69 Project FM No.: N/A State Project No.: N/A CITS Work Order No. :23 State Road: N/A County: Palm Beach•Survey Log No.: N/A Requested By: Scott Harris Limits: Boca Airport

As requested in your letter dated (October 171 2007), InfraMap Corp (IMC) is pleased to submit the following proposal for utility locating costs associated with the above referenced project. The work to be performed and contract fees, are as follows:

DESIGNATION OF UTILITIES

Utility designation will be performed in the areas as marked on the supplied plan sheets. We will identify potential conflicts within the marked locations. When conflicts are identified, a test hole will be dug to confirm the location, elevation and type of utility. Our standard test hole report will be generated for each test hole showing the pertinent information and this turned over to the F.D.O.T. project surveyors. Detailed field notes will be generated for those areas where there are no utility confl ts. The general tasks to be performed include the following in addition to the specified scope:

*Records research and retrieval.

*Coordination with utilities, F.D.O.T. surveyors and engineers.

*Electronic designation of site utilities.

*F ld sketching of designated utilities.

05105

STATE OF FLORIDA DEPARTMENT OFT DRE:~EIVED YO""""

TASK WORK ORDER FOR PROFEt~1tr~I PROCUREMENT

Consultant: Infra Map Corp. JYIf\I\ 1 V lUUU

Address: 1860 Old Okeechobee Road DISTRICT IV Suite 514 PROfESSIONAL &OTHER CONTRACTUALWest Palm Beach, Florida 33409

SERVICES

(To be entered upon execution of T.W.C.)

Task Work Order No.: 24

Date: 2/28/2008

Contract No. C-8G69 Payment FM No.: 23002953201

Brief Task Description:

see attached k&CITS REVIEWED BY p~ ':DATE: 3-&&#

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services). All services required under this Task Work Order will be completed on or before: 9/21/2009

The total amount or the limiting amount of the compensation will be: $4,978.72

Compensation elements are as follows:

Element Description Method of Compensation Amount Est·

:l.U.E. Services LA4) Units worked at loaded billing rates in Table 6

$4,978.7 E

$O.O(

$O.O(

$0.0(

Page 1 Tota $4,978.7.

Page 2 thru 6 Subtota $O.OC

Tota $4,978.7~

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive. Balance remaining $206,024.59 KEO

ASSignment completion due date 3/14/2008

Total authorizations to date (including this one):

$593,975.41

Departmental Approval: J£tfi1:r;fC2Robert H. Hughan District Surve;tor (name) (title) (signjlUre) , Y--'

Consultant Acceptance:

Ja;t Scagliola Project Administrator

(name) (title) f/ ~ignature) , /'Limiting or Estimated/Budgeted Amount.

Dlstnbutlon

February 25,2008

District Surveyor Florida Dept. of Transportation Surveying and Mapping - District 4 3400 W. Commercial Blvd.

Ft. Lauderdale, FL 33309

InfraMap Corp # N/A

Reference: Contract FM No.: 23002953201 Contract No. : C-8G69 Project FM No. : 23036715201 State Project No.: 94060-xxxx CITS Work Order No.:24 State Road: A-I-A County: St. Lucie Survey Log No. : 11-08 Requested By: Jorge Corrales-(954) 777-4657 Limits: Sta.306+40.00 to Sta.

328+80.00

As requested in your letter dated (February 15, 2008), InfraMap Corp (IMC) is pleased to submit the following proposal for utility locating costs associated with the above referenced project. The work to be performed and contract fees, are as follows:

DESiGNATiON OF UTiLiTIES

Utility designation will be performed in the areas as marked on the supplied plan sheets. We will identify potential conflicts within the marked locations. When conflicts are identified, a test hole will be dug to confirm the location, elevation and type of utility. Our standard test hole report will be generated for each test hole showing the pertinent information and this turned over to the F.D.O.T. project surveyors. Detailed field notes will be generated for those areas where there are no utility conflicts. The general tasks to be performed include the following in addition to the specified scope:

*Records research and retrieval.

*Coordination with utilities, F.D.O.T. surveyors and engineers.

*Electronic designation of site utilities.

*Field sketching of designated utilities.

http:328+80.00 http:Sta.306+40.00

PROCUREMENTTASK WORK ORDER FOR PROFESSIONAL SERVICES

05105 Page 1 or6/"

Consultant: fnfraMap Corp. errs ~., - nV'PAll ~ ~ .

Address: 1860 Old Okeechobee Road Kl!A V J.D ......~i-/a~ Suite 514 DATE:- i;J West Palm Beach, Florida 33407

(To be entered upon execution of T.W.O.)

Task Work Order No.: 25

Date: 4/9/2008

Contract No. C-8G69 Payment FM_NO':,:r_l~09~~53701J"'" .'

Brief Task Description: .,. . Ct'VEtiI~ see attached

')R~'r\ '1" ('J"'4 \' .'r-<;iI'

.• 'ilS·:::;CT \./ r'c,';'" r.:_":,," l :,~,.,~/ ..",\..;a """t ''oj,,, In accordance with the above referenced con~ract, you are authQf;i~~; ~/It\e&Sk~ -aet~iIEraYn attached Exhibit A (Scope of Services). All services required under this Task Work Order will be'co on or~ft?r.~CES 9/21/2009

The total amount or the limiting amount of the compensation will be: $1,763.56

Compensation elements are as follows:

Element Description p.U.E. Services

Method of Compensation

(LA4) Units worked at loaded billing rates in Table 6

Amount

$1,763.5

Est*

E

$0.0

$0.01

$O.O(

Page 1 Tota

Page 2 thru 6 Subtota

Tota

$1,763.5E

$0.0(

$1,763.5E

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive. Balance remaining $204,261.03 KEO

Assignment completion due date 4/21/2008

Total authorizations to date (including this one):

$595,738.97 ~ Departmental Approval:

Robert H. Hughan District Surveyor Jdtj-})( / ~ (name) (title) '(signature) lJ

Consultant Acceptance:

Jay Scagliola Project Administrator dh (name) (title) // ~ignature)

'Llmltlng or Estimated/Budgeted Amount.

Distribution http:595,738.97 http:204,261.03 http:1,763.56

April 7,2008

District Surveyor Florida Dept. Transportation Surveying and Mapping - District 4 3400 W. Commercial Blvd.

Ft. Lauderdale, FL 33309

InfraMap Corp # N/A

Reference: Contract FM No. : 23002953201

Contract No.: C 8G69

Project FM No. : 2304315

State Project No.: 89040 xxxx

CITS Work Order No. :25

State Road: A-1-A

County: Martin

Survey Log No.: 27 08

Requested By: Jose Guerrero 954-677-5274

Limits: A-1-A Sewall's Point Road

As requested in your letter dated (April 3, 2008), InfraMap Corp (IMC) is pleased to submit the following proposal for utility locating costs associated with the above referenced project. The work to be performed and contract fees, are as follows:

DESIGNATION OF UTILITIES

Utility designation will be performed in the areas as marked on the supplied plan sheets. We will identify potential conflicts within the marked locations. When conflicts are identified, a test hole will be dug to confirm the location, elevation and type of utility. Our standard test hole report will be generated for each test hole showing the pertinent information and this turned over to the F.D.O.T. project surveyors. Detailed field notes will be generated for those areas where there are no utility conflicts. The general tasks to be performed include the following in addition to the specified scope:

*Records research and ret eval.

*Coordination with utilities, F.D.O.T. surveyors and engineers.

*Field sketching of designated utilities.

Page 1 ot6

'Limiting or Estimated/Budgeted Amount.

Distribution

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

Consultant:

Address:

InfraMap Corp

1860 Old Okeechobee Road Suite 514 West Palm Beach, Florida 33409

(To be entered upon execution of T.w.O.)

Date: 6/23/2008

Contract No. f2 ... 11 r; f.n q BriefTask Description:

see attached

Task Work Order No.: 26

Payment FM No.: 23002953201

375-030·25

PROCUREMENT

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services). All services required under this Task Work Order will be completed on or before: 10/30/2008

The total amount or the limiting amount of the compensation will be: $2,152.08

Compensation elements are as follows:

Element Description Method of Compensation Amount

S.U.E. Services LA4) Units worked at loaded billing rates in Table 6

$2,152.01:

_ 1_ li'- , III 1~ $O.O(

$O.O(.'- - $O.O(

JUL VV &,Y'" Page 1 Tota $2,152.m

Page 2 thru 6 Subtota $O.O(

Tota $2,152.m

Other Notes:P\{Ur..",,~ S£RV\C£S An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competitive Balance remaining $202,108.95 KEO

ASSignment completion due date 7/6/2008

Total authorizations to date (including this one):

$597,891.05

Departmental Approval:

Robert H. Hughan District Surveyor (name)

Consultant Acceptance:

(title)

E

Jay Scagliola Project Administrator (name) (title) )tfIgnature)

Est·

June 23, 2008

District Surveyor Florida Dept. of Transportation Surveying and Mapping - District 4 3400 W. Commercial Blvd.

Ft. Lauderdale, FL 33309

InfraMap Corp # N/A

Reference: Contract FM No. : 23002953201 Contract No.: C-8G69 Project FM No. : 228229 5 State Project No.: 86080-xxxx CITS Work Order No.:26 State Road: 84 County: Broward Survey Log No. : 40-08 Requested By: Jose Guerrero Limits: SR 84/Red Road

As requested in your letter dated (June 19, 2008), InfraMap Corp (IMC) is pleased to submit the following proposal for utility locating costs associated with the above referenced project. The work to be performed and contract fees, are as follows:

DESIGNATION OF UTILITIES

Utility designation will be performed in the areas as marked on the supplied plan sheets. We will identify potential conflicts within the marked locations. When conflicts are identified, a test hole will be dug to confirm the location, elevation and type of utility. Our standard test hole report will be generated for each test hole showing the pertinent information and this turned over to the F.O.O.T. project surveyors. Detailed field notes will be generated for those areas where there are no utility conflicts. The general tasks to be performed include the following in addition to the specified scope:

*Records research and retrieval.

*Coordination with utilities, F.D.O.T. surveyors and engineers.

PROCUREMENTTASK WORK ORDER AMENDMENT FORM

RE

02105

FOR PROFESSIONAL~ES

Consultant: - Infra Map Corp.

Address: •

. 1860 Old Okeechobee Road, Suite 514, West Palm Beach, Florida 33409

Contract Number: (To be entered upon executi

~C_._8G_6_9______________________________________~D~at_e:_~~(8,~12~ga~~~~~~~~~~~~~~~~~~~~~'~'L- Payment FM No. (must be the sam

Amendment No. to Task Work Order No. 26 23002953201

Purpose of Amendment:

Add test holes to complete assignment

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru o The subject task work order is hereby closed. Final payment for the task work order has been paid_ No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be reoovered from this task work order $ 0.00

The subject task work order is hereby canceled (no work has been performed and no payment is due).

The total amount for services performed under this task work order is increased by $ 915.25 ~:..c::..;,--_____181

The total amount for services performed under this task work order is decreased by $ 0.00 o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised

Compensation Element Description

Method of Compensation

Previous Amount

This Amendment Amount Subtotal Check if

Estimate

.U.E. Services LA4) Units worked al loaded billing ates in Table 6

UL 282008

SERVICES

$915.2

$0.0

$0.0

$0.0

$0.0 o o o o o Page 1 subtotals $915.2 $3,067.3 r-------------r-----------~ Page 2 through 5 subtotals $0.0 $0.0

~h~is~A~m-e-n-d~m-e-n~t--~.vv~.O~.------~ otal otal

$915.2 $3,067.3o Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been perfonned and found fair, reasonable and competitive.

Balance remaining $187,990.87 KEO

Attachments:

olal Contract Authorizations to Date Including this Amendment $ 612,009.13 epartmental Approval:

Roberet H. Hughan

(name) onsultant Acceptance:

Jay Scagliola

(name

District Surveyor title)

Project Administrator title http:187,990.87

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375·030-26

PROCUREMENTTASK WORK ORDER AMENDMENT FORM

FOR PROFESSIONAL SERVICES

Consultant:

InfraMap Corp

Address:

'1860 Old Okeechobee Road, Suite 201, West Palm Beach, Florida 33409

Contract Number: (To be entered upon execution of Task Work Order Amendment) C-8G69 Date: 9/4/2009

Payment FM No. (must be the same as original Task Work Order):

Amendment No. 2 to Task Work Order No. 26 23002953201

Purpose of Amendment:

close out work order 40-08

Check all applicable terms: o The time for completion of services for the subject task work order is extended thru jgJ The subject task work order is hereby closed. Final payment for the task work order has been paid. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ 785.72

"-'-"-'-'-""'---- o The subject task work order is hereby canceled (no work has been performed and no payment is due).

o The total amount for services performed under this task work order is increased by $ 0.00 =-=----- The additional funds will be allocated to the following compensation elements described below.

o The total amount for services performed under this task work order is decreased by $ 0.00

The decrease in funds will be allocated to the following compensation elements described below.

o There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Page 1 subtotals $0.0PSUe 2 through 5 subtotalsl-----$-O-.O-+------$O-.--lo

Reviewed By: M ~:!IAmendment $0.0o Other Notes: Date Submitted: ",AS/If?

elTS Approved Date: ___

New Contract:

Description

Method of Compensation

Previous Amount

$0.0

$0.0 o

$0.0

$0.0 $0.0 o

This Amendment Amount

Subtotal

$0.0

W.O.

olal

$0.0

Check if Estimate o o o o

Attachments:

otal Contract Authorizations to Date Including this Amendment $ 0.00 name title

Jay Scagliola Projecl Administrator name title

Distribution: _______________

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375·030·25

TASK WORK ORDER FOR PROFESSIONAL SERVICES P~

tJREMENT

Page 1 of6

Consultant: InfraMap Corp eITS ",) Address: 1860 Old Okeechobee Road REVIEWED BY PSU 1I ~

Suite 514 DATE: -,-7-or;.West Palm Beach, Florida 33409 - (To be entered upon execution of T.W.O.)

Task Work Order No.: 27 Date: 6/24/2008

Contract No. C-8G69 Payment FM No.: ZJooZ'IS'32.D I

BriefTask Description:

see attached

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services). All services required under this Task Work Order will be completed on or before: 10/30/2008

The total amount or the limiting amount of the compensation will be: $5,375.97

Compensation elements are as follows:

Element Description Method of Compensation Amount Est* p.UE Services (LA4) Units worked at loaded billing rates in Table 6

$5,375.9 E.- - I~ -( - ,I 1- ... $O.O(-- - - --- $0.0(

JUI 02201 J $O.O(

\ DISTRICT N Page 1 Tota $5,375.9

PROFESSIONAL &OTHER CONTRACnJAl Page 2 thru 6 Subtota $O.O(

SERVICES Tota $5,375.9

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed and found fair, reasonable and competive. Balance remaining $196,732.98 KEO

Assignment completion due date 6/27/2008

Total authorizations to date (including this one):

$603,267.02 A C

LUX)~Departmental Approval:

Robert H. Hughan District Surve~or (name)

Consultant Acceptance:

Ja~ Scagliola (name)

·limltlng or EstlmatedlBudgeted Amount.

(title)

, (sigmlfure) ( ...)~

Project Administrator d~ (title) // ~nature)

June 24, 2008

Di ct Surveyor Florida Dept. of Transportation Surveying and Mapping District 4 3400 W. Commercial Blvd.

Ft. Lauderdale, FL 33309 Phone: (954)486 1400 Fax: (954) 777 4591

InfraMap Corp # N/A

Reference: Contract FM No. : 23002953201 Contract No.: C 8G69 Project FM No. : 228583-5 State Project No.: 88010-xxxx CITS Work Order No.:27 State Road: 5 County: Indian River Survey Log No. : 56 08 Requested By: Pedro Santiesteban Phone: (954)777-4592 Limits: Oslo Road to S. Indian

River Blvd.

As requested in your letter dated (June 23, 2008), InfraMap Corp (IMC) is pleased to submit the following proposal utility locating costs associated with the above referenced project. The work to be performed and contract s, are as follows:

DESIGNATION OF UTILITIES

Utility designation will be performed in the areas as marked on the supplied plan sheets. We will identify potenti conflicts within the marked locations. When conflicts are identi ed, a test hole will be dug to confirm the location, elevation and type of utility. Our standard test hole report will be generated for each test hole showing the pertinent information and s turned over to the F.D.O.T.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .