About this file

This document is a Scope of Services agreement between the Florida Department of Transportation (FDOT) and H.W. Lochner, Inc. for a transportation infrastructure design project in Pinellas County, Florida. The project involves roadway improvements on State Road 688 (Ulmerton Road) from west of 38th Street North to west of Interstate 275. The contract encompasses comprehensive engineering and design services, including roadway analysis, structural design, utility coordination, environmental permitting, surveying, photogrammetry, mapping, and geotechnical investigations.

The project scope includes reconstructing an eight-lane divided urban roadway with six through lanes and right-turn lanes, 12-foot lanes, a 30-foot median, curb and gutter, and sidewalks. The design will also involve milling and resurfacing sections, reconstructing the existing SR 686 (Roosevelt Blvd) flyover, and addressing intersection improvements at 38th Street, 34th Street, Egret Boulevard, and Feather Sound Drive/Carillon Parkway. Key components include replacing traffic signals, adding mast arms, designing overhead guide signs, and implementing comprehensive utility coordination with multiple utility agencies. The contract is structured with multiple phase submittals and will require detailed technical documentation, quality control reviews, and coordination with various local and state agencies throughout the design process.

View the file

Other files

File Type Posted
CN-550000-C8N38-00030000.pdf PDF
CN-550000-C8N38-00060000.pdf PDF
CN-550000-C8T78-00120000.pdf PDF
CN-550000-C8N38-00040000.pdf PDF
CN-550000-C8N38-00020000.pdf PDF
CN-550000-C8N38-00050000.pdf PDF
CN-550000-C8N38-00070000.pdf PDF
CN-550000-C8N83-W0020100.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised: 05/25/07

02/07/07

12/21/06

EXHIBIT “A”

SCOPE OF SERVICES

FOR

FINANCIAL PROJECT ID: 257147-1-32-01

FEDERAL PROJECT NO. SFTL 280 R

S.R. 688 (ULMERTON RD.) FROM W. OF 38

TH

ST. N. TO W. OF I-275

DISTRICT SEVEN

PINELLAS COUNTY

FPN: 257147-1-32-01

i

TABLE OF CONTENTS

1 PURPOSE __________________________________________________________________________ A-1

2 PROJECT DESCRIPTION ____________________________________________________________ A-2

2.1 Roadway (Activities 3.0, 4.0, and 5.0) ____________________________________________A-2

2.2 Drainage (Activity 6.0) ________________________________________________________A-4

2.3 Utility Coordination (Activity 7.0) ______________________________________________A-4

2.4 Permits (Activity 8.0) _________________________________________________________A-4

2.5 Structures (Activities 9.0 – 18.0) ________________________________________________A-4

2.6 Signing and Pavement Markings (Activities 19.0 and 20.0) __________________________A-4

2.7 Signals (Activity 21.0 and 22.0) _________________________________________________A-5

2.8 Lighting (Activity 23.0 and 24.0) _______________________________________________A-5

2.9 Landscape Architecture (Activities 25.0 and 26.0) _________________________________A-5

2.10 Survey (Activity 27.0) ________________________________________________________A-5

2.11 Photogrammetry (Activity 28.0) ________________________________________________A-5

2.12 Mapping (Activity 29.0) _______________________________________________________A-5

2.13 Geotechnical (Activity 30.0) ___________________________________________________A-5

2.14 Architecture (Activity 31.0) ____________________________________________________A-5

2.15 Project Schedule _____________________________________________________________A-5

2.16 Submittals __________________________________________________________________A-6

2.17 Provisions for Work __________________________________________________________A-9

2.18 Services to be Performed by the DEPARTMENT ________________________________ A-14

3 PROJECT GENERAL TASKS ________________________________________________________ A-15

3.1 Public Involvement _________________________________________________________ A-17

3.2 Joint Project Agreements ____________________________________________________ A-17

3.3 Specifications Package Preparation ____________________________________________ A-17

3.4 Contract Maintenance _______________________________________________________ A-18

3.5 Value Engineering (Multi-Discipline Team) Review ______________________________ A-18

3.6 Prime Project Manager Meetings ______________________________________________ A-19

3.7 Other Project General Tasks _________________________________________________ A-19

4 ROADWAY ANALYSIS _____________________________________________________________ A-19

4.1 Typical Section Package _____________________________________________________ A-19

4.2 Pavement Design Package ____________________________________________________ A-19

4.3 Access Management _________________________________________________________ A-19

4.4 Horizontal/Vertical Master Design Files ________________________________________ A-19

4.5 Cross Section Design Files ____________________________________________________ A-20

4.6 Traffic Control Analysis _____________________________________________________ A-20

4.7 Master TCP Design Files _____________________________________________________ A-20

4.8 Design Variations and Exceptions _____________________________________________ A-20

4.9 Design Report ______________________________________________________________ A-20

4.10 Computation Book and Quantities _____________________________________________ A-20

4.11 Cost Estimate ______________________________________________________________ A-21

4.12 Technical Special Provisions __________________________________________________ A-21

4.13 Other Roadway Analysis _____________________________________________________ A-21

4.14 Field Reviews ______________________________________________________________ A-21

4.15 Technical Meetings _________________________________________________________ A-21

4.16 Quality Assurance/Quality Control ____________________________________________ A-21

4.17 Independent Peer Review ____________________________________________________ A-21

4.18 Supervision ________________________________________________________________ A-21

4.19 Coordination _______________________________________________________________ A-21 ii

5 ROADWAY PLANS _________________________________________________________________ A-21

5.1 Key Sheet _________________________________________________________________ A-21

5.2 Summary of Pay Items Including Quantity Input ________________________________ A-21

5.3 Drainage Map ______________________________________________________________ A-21

5.4 Interchange Drainage Map ___________________________________________________ A-21

5.5 Typical Section Sheets _______________________________________________________ A-21

5.6 General Notes/Pay Item Notes ________________________________________________ A-21

5.7 Summary of Quantities ______________________________________________________ A-21

5.8 Box Culvert Data Sheet ______________________________________________________ A-21

5.9 Bridge Hydraulics Recommendation Sheets _____________________________________ A-21

5.10 Summary of Drainage Structures ______________________________________________ A-21

5.11 Optional Pipe/Culvert Material _______________________________________________ A-21

5.12 Project Layout _____________________________________________________________ A-21

5.13 Plan/Profile Sheet ___________________________________________________________ A-21

5.14 Profile Sheet _______________________________________________________________ A-21

5.15 Plan Sheet _________________________________________________________________ A-21

5.16 Special Profile ______________________________________________________________ A-21

5.17 Back of Sidewalk Profile Sheet ________________________________________________ A-22

5.18 Interchange Layout Sheet ____________________________________________________ A-22

5.19 Ramp Terminal Details (Plan View) ___________________________________________ A-22

5.20 Intersection Layout Details ___________________________________________________ A-22

5.21 Miscellaneous Detail Sheet ___________________________________________________ A-22

5.22 Drainage Structure Sheet ____________________________________________________ A-22

5.23 Miscellaneous Drainage Sheets ________________________________________________ A-22

5.24 Lateral Ditch Plan/Profile ____________________________________________________ A-22

5.25 Lateral Ditch Cross Sections __________________________________________________ A-22

5.26 Retention/Detention Ponds Detail Sheet ________________________________________ A-22

5.27 Retention Pond Cross Sections ________________________________________________ A-22

5.28 Cross Section Pattern Sheet __________________________________________________ A-22

5.29 Roadway Soil Survey Sheet ___________________________________________________ A-22

5.30 Cross Sections ______________________________________________________________ A-22

5.31 Traffic Control Plan Sheets ___________________________________________________ A-22

5.32 Traffic Control Cross Section Sheets ___________________________________________ A-22

5.33 Traffic Control Detail Sheets _________________________________________________ A-22

5.34 Utility Adjustment Sheets ____________________________________________________ A-22

5.35 Selective Clearing and Grubbing ______________________________________________ A-22

5.36 Erosion Control Plan ________________________________________________________ A-22

5.37 SWPPP ___________________________________________________________________ A-23

5.38 Project Control Network Sheet ________________________________________________ A-23

5.39 Interim Standards __________________________________________________________ A-23

5.40 Utility Verification Sheet (SUE Data) __________________________________________ A-23

5.41 Quality Assurance/Quality Control ____________________________________________ A-23

5.42 Supervision ________________________________________________________________ A-23

6 DRAINAGE ANALYSIS _____________________________________________________________ A-23

6.1 Determine Base Clearance Water Elevation _____________________________________ A-23

6.2 Pond Siting Analysis and Report ______________________________________________ A-23

6.3 Design of Cross Drains ______________________________________________________ A-23

6.4 Design of Roadway Ditches ___________________________________________________ A-23

6.5 Design of Outfalls ___________________________________________________________ A-23

6.6 Design of Stormwater Management Facility (Offsite Pond) ________________________ A-24

6.7 Design of Stormwater Management Facility (Roadside Ditch as Linear Pond) _________ A-24

6.8 Design of Flood Plain Compensation Area ______________________________________ A-24

6.9 Design of Storm Drains ______________________________________________________ A-24

6.10 Optional Culvert Material____________________________________________________ A-24 iii

6.11 French Drain Design ________________________________________________________ A-24

6.12 Drainage Wells _____________________________________________________________ A-24

6.13 Drainage Design Documentation Report ________________________________________ A-24

6.14 Bridge Hydraulic Report _____________________________________________________ A-24

6.15 Temporary Drainage Analysis ________________________________________________ A-24

6.16 Cost Estimate ______________________________________________________________ A-25

6.17 Technical Special Provisions __________________________________________________ A-25

6.18 Other Drainage Analysis _____________________________________________________ A-25

6.19 Field Reviews ______________________________________________________________ A-25

6.20 Technical Meetings _________________________________________________________ A-25

6.21 Quality Assurance/Quality Control ____________________________________________ A-25

6.22 Independent Peer Review ____________________________________________________ A-25

6.23 Supervision ________________________________________________________________ A-25

6.24 Coordination _______________________________________________________________ A-25

7 UTILITIES ________________________________________________________________________ A-25

7.1 Kickoff Meeting ____________________________________________________________ A-26

7.2 Identify Existing UAO(s) _____________________________________________________ A-26

7.3 Make Utility Contacts _______________________________________________________ A-26

7.4 Exception Coordination ______________________________________________________ A-27

7.5 Preliminary Utility Meeting __________________________________________________ A-27

7.6 Individual/Field Meetings ____________________________________________________ A-27

7.7 Collect and Review Plans and Data from UAO(s)_________________________________ A-27

7.8 Subordination of Easements Coordination ______________________________________ A-27

7.9 Pre-Phase III Utility Conflict Resolution/Constructability Meeting __________________ A-28

7.10 Review Utility Markups and Work Schedules and Processing of Schedules and

Agreements ________________________________________________________________ A-28

7.11 Utility Coordination/Follow up ________________________________________________ A-28

7.12 Utility Constructability Review _______________________________________________ A-28

7.13 Additional Utility Services____________________________________________________ A-28

7.14 Processing Utility Work by Highway Contractor (UWHC) _________________________ A-29

7.15 Contract Plans to UAO(s) ____________________________________________________ A-29

7.16 Certification/Close-out ______________________________________________________ A-29

7.17 Other Utilities ______________________________________________________________ A-29

8 ENVIRONMENTAL PERMITS _______________________________________________________ A-29

8.1 Preliminary Project Research _________________________________________________ A-29

8.2 Complete Permit Involvement Form – N/A ______________________________________ A-29

8.3 Establish Wetland Jurisdictional Lines _________________________________________ A-30

8.4 Agency Verification of Wetland Data __________________________________________ A-30

8.5 Complete and Submit All Required Applications _________________________________ A-30

8.6 Prepare Dredge and Fill Sketches _____________________________________________ A-31

8.7 Prepare USCG Permit Sketches _______________________________________________ A-31

8.8 Prepare Easement Sketches __________________________________________________ A-31

8.9 Prepare Right-of-Way Occupancy Sketches _____________________________________ A-31

8.10 Prepare Coastal Construction Control Line (CCCL) Permit Sketches _______________ A-31

8.11 Prepare Tree Permit Information – N/A ________________________________________ A-31

8.12 Mitigation Coordination and Meetings _________________________________________ A-31

8.13 Mitigation Design – N/A _____________________________________________________ A-31

8.14 Environmental Clearances ___________________________________________________ A-31

8.15 Other Environmental Permits ________________________________________________ A-31

8.16 Technical Meetings _________________________________________________________ A-31

8.17 Quality Assurance/Quality Control ____________________________________________ A-31

8.18 Supervision ________________________________________________________________ A-32

8.19 Coordination _______________________________________________________________ A-32 iv

9 STRUCTURES – SUMMARY AND MISCELLANEOUS TASKS AND DRAWINGS __________ A-32

9.1 Index of Drawings __________________________________________________________ A-32

9.2 Project Layout _____________________________________________________________ A-32

9.3 General Notes and Bid Item Notes _____________________________________________ A-32

9.4 Incorporate Florida Department of Transportation Standards _____________________ A-32

9.5 Incorporate Report of Core Borings ___________________________________________ A-32

9.6 Existing Bridge Plans ________________________________________________________ A-32

9.7 Computation Book and Quantities _____________________________________________ A-32

9.8 Cost Estimate ______________________________________________________________ A-32

9.9 Technical Special Provision___________________________________________________ A-32

9.10 Field Reviews ______________________________________________________________ A-32

9.11 Technical Meetings _________________________________________________________ A-32

9.12 Quality Assurance/Quality Control ____________________________________________ A-32

9.13 Independent Peer Review ____________________________________________________ A-32

9.14 Supervision ________________________________________________________________ A-32

9.15 Coordination _______________________________________________________________ A-32

10 STRUCTURES – BRIDGE DEVELOPMENT REPORT ___________________________________ A-32

General Requirements A-33

10.1 Bridge Geometry ___________________________________________________________ A-33

10.2 Ship Impact Data Collection– N/A _____________________________________________ A-33

10.3 Ship Impact Criteria – N/A ___________________________________________________ A-33

Superstructure Alternatives A-33

10.4 Short Span Concrete – N/A ___________________________________________________ A-33

10.5 Medium Span Concrete ______________________________________________________ A-33

10.6 Long Span Concrete – N/A ___________________________________________________ A-33

10.7 Structural Steel_____________________________________________________________ A-33

Foundation and Substructure Alternatives A-33

10.8 Pier/Bent Types ____________________________________________________________ A-33

10.9 Shallow Foundations ________________________________________________________ A-33

10.10 Deep Foundations___________________________________________________________ A-33

Moveable Span – N/A A-33

10.11 Data Collection and Design Criteria – N/A ______________________________________ A-33

10.12 Movable Span Geometrics and Clearances – N/A _________________________________ A-33

10.13 Deck System Evaluation – N/A ________________________________________________ A-33

10.14 Framing Plan Development – N/A _____________________________________________ A-33

10.15 Main Girder Preliminary Design – N/A _________________________________________ A-33

10.16 Conceptual Span Balance/Counterweight – N/A __________________________________ A-33

10.17 Support System Development – N/A ___________________________________________ A-33

10.18 Drive Power Calculations – N/A _______________________________________________ A-33

10.19 Drive System Development – N/A ______________________________________________ A-33

10.20 Power and Control Development – N/A _________________________________________ A-33

10.21 Conceptual Pier Design – N/A _________________________________________________ A-33

10.22 Foundation Analysis (FL PIER) – N/A __________________________________________ A-33

10.23 Tender Visibility Study – N/A _________________________________________________ A-33

Other BDR Issues A-34

10.24 Aesthetics _________________________________________________________________ A-34

10.25 TCP/Staged Construction Requirements ________________________________________ A-34

10.26 Constructability Requirements ________________________________________________ A-34

10.27 Abutment Slope/Wall Evaluation ______________________________________________ A-34

10.28 Quantity and Cost Estimates _________________________________________________ A-34

10.29 Quantity and Cost Estiamte – Movable Span – N/A _______________________________ A-34

10.30 Wall Type Justification ______________________________________________________ A-34

Report Preparation A-34

10.31 Exhibits ___________________________________________________________________ A-34 v

10.32 Exhibits – Movable Span – N/A _______________________________________________ A-34

10.33 Report Preparation _________________________________________________________ A-34

10.34 Report Preparation – Movable Span – N/A ______________________________________ A-34

10.35 BDR Submittal Package _____________________________________________________ A-34

Preliminary Plans A-34

10.36 General Notes Sheets ________________________________________________________ A-34

10.37 Plan and Elevation Sheets ____________________________________________________ A-34

10.38 Construction Staging ________________________________________________________ A-34

10.39 Superstructure Section Sheets ________________________________________________ A-34

10.40 Substructure Section Sheets __________________________________________________ A-34

10.41 Movable Span – General Notes Sheets – N/A ____________________________________ A-34

10.42 Movable Span – Plan and Elevation Sheets – N/A ________________________________ A-34

10.43 Movable Span – Clearance Diagram – N/A ______________________________________ A-34

10.44 Movable Span – Bascule Pier Layouts – N/A _____________________________________ A-34

10.45 Movable Span – Bascule Leaf Section – N/A _____________________________________ A-34

10.46 Movable Span – Bascule Leaf Framing Plan _____________________________________ A-34

10.47 Movable Span – Machinery Layouts – N/A ______________________________________ A-34

10.48 Movable Span – Control Logic Diagram – N/A ___________________________________ A-34

11 STRUCTURES – TEMPORARY BRIDGE - N/A _________________________________________ A-35

12 STRUCTURES – SHORT SPAN CONCRETE BRIDGE - N/A ______________________________ A-35

13 STRUCTURES – MEDIUM SPAN CONCRETE BRIDGE _________________________________ A-35

General Layout Design and Plans A-35

13.1 Overall Bridge Final Geometry _______________________________________________ A-35

13.2 Expansion/Contraction Analysis ______________________________________________ A-35

13.3 General Plan and Elevation __________________________________________________ A-35

13.4 Construction Staging ________________________________________________________ A-35

13.5 Approach Slap Plan and Details _______________________________________________ A-35

13.6 Miscellaneous Details. _______________________________________________________ A-35

End Bent Design and Plans A-35

13.7 End Bent Geometry _________________________________________________________ A-35

13.8 Wingwall Design and Geometry _______________________________________________ A-35

13.9 End Bent Structural Design __________________________________________________ A-35

13.10 End Bent Plan and Elevation _________________________________________________ A-35

13.11 End Bent Details ____________________________________________________________ A-35

Intermediate End Bent Design and Plans A-35

13.12 Bent Geometry _____________________________________________________________ A-35

13.13 Bent Stability Analysis _______________________________________________________ A-35

13.14 Bent Structural Design ______________________________________________________ A-35

13.15 Bent Plan and Elevation _____________________________________________________ A-35

13.16 Bent Details ________________________________________________________________ A-35 Pier Design and Plans A-35

13.17 Pier Geometry _____________________________________________________________ A-35

13.18 Pier Stability Analysis _______________________________________________________ A-35

13.19 Pier Structural Design _______________________________________________________ A-35

13.20 Pier Plan and Elevation ______________________________________________________ A-35

13.21 Pier Details ________________________________________________________________ A-36

Miscellaneous Substructure Design and Plans A-36

13.22 Foundation Layout__________________________________________________________ A-36

13.23 Fender System – N/A ________________________________________________________ A-36

Superstructure Deck Design and Plans A-36

13.24 Finish Grade Elevaton (FGE) Calculation_______________________________________ A-36

13.25 Finish Grade Elevations _____________________________________________________ A-36

13.26 Bridge Deck Design _________________________________________________________ A-36

13.27 Bridge Deck Reinforcing and Concrete Quantities ________________________________ A-36 vi

13.28 Diaphragm Design/Jacking Loads _____________________________________________ A-36

13.29 Superstructure Plan _________________________________________________________ A-36

13.30 Superstructure Section ______________________________________________________ A-36

13.31 Miscellaneous Superstructure Details __________________________________________ A-36

Reinforcing Bar Lists A-36

13.32 Reinforcing Bar List ________________________________________________________ A-36

Continuous Concrete Girder Design A-36

13.33 Section Properties __________________________________________________________ A-36

13.34 Material Properties _________________________________________________________ A-36

13.35 Construction Sequence ______________________________________________________ A-36

13.36 Tendon Layouts ____________________________________________________________ A-36

13.37 Live Load Analysis __________________________________________________________ A-36

13.38 Temperature Gradient ______________________________________________________ A-36

13.39 Time Dependent Analysis ____________________________________________________ A-36

13.40 Stress Summary ____________________________________________________________ A-36

13.41 Ultimate Moments __________________________________________________________ A-36

13.42 Ultimate Shear _____________________________________________________________ A-36

13.43 Construction Loading _______________________________________________________ A-36

13.44 Framing Plan ______________________________________________________________ A-36

13.45 Girder Elevation, including Grouting Plan and Vent Locations _____________________ A-37

13.46 Girder Details ______________________________________________________________ A-37

13.47 Erection Sequence __________________________________________________________ A-37

13.48 Splice Details ______________________________________________________________ A-37

13.49 Girder Deflections and Camber _______________________________________________ A-37

Simple Span Concrete Design A-37

13.50 Prestressed Beam ___________________________________________________________ A-37

13.51 Prestressed Beam Schedules __________________________________________________ A-37

13.52 Framing Plan ______________________________________________________________ A-37

Load Rating A-37

13.53 Load Ratings ______________________________________________________________ A-37

14 STRUCTURES – STRUCTURAL STEEL BRIDGE ______________________________________ A-37

General Layout Design and Plans A-37

14.1 Overall Bridge Final Geometry _______________________________________________ A-37

14.2 Expansion/Contraction Analysis ______________________________________________ A-37

14.3 General Plan and Elevation __________________________________________________ A-37

14.4 Construction Staging ________________________________________________________ A-37

14.5 Approach Slab Plan and Details _______________________________________________ A-37

14.6 Miscellaneous Details ________________________________________________________ A-37

End Bent Design and Plans A-37

14.7 End Bent Geometry _________________________________________________________ A-37

14.8 Wingwall Design and Geometry _______________________________________________ A-37

14.9 End Bent Structural Design __________________________________________________ A-37

14.10 End Bent Plan and Elevation _________________________________________________ A-37

14.11 End Bent Details ____________________________________________________________ A-37

Intermediate Bent Design and Plans A-38

14.12 Bent Geometry _____________________________________________________________ A-38

14.13 Bent Stability Analysis _______________________________________________________ A-38

14.14 Bent Structural Design ______________________________________________________ A-38

14.15 Bent Plan and Elevation _____________________________________________________ A-38

Pier Design and Plans A-38

14.16 Bent Details ________________________________________________________________ A-38

14.17 Pier Geometry _____________________________________________________________ A-38

14.18 Pier Stability Analysis _______________________________________________________ A-38

14.19 Pier Structural Design _______________________________________________________ A-38

14.20 Pier Plan and Elevation ______________________________________________________ A-38 vii

14.21 Pier Details ________________________________________________________________ A-38 Miscellaneous Substructure Design and Plans A-38

14.22 Foundation Layout__________________________________________________________ A-38

14.23 Fender System – N/A ________________________________________________________ A-38

Superstructure Deck Design and Plans A-38

14.24 Finish Grade Elevation (FGE) Calculation ______________________________________ A-38

14.25 Finish Grade Elevations _____________________________________________________ A-38

14.26 Bridge Deck Design _________________________________________________________ A-38

14.27 Bridge Deck Reinforcing and Concrete Quantities ________________________________ A-38

14.28 Superstructure Plan _________________________________________________________ A-38

14.29 Superstructure Section ______________________________________________________ A-38

14.30 Miscellaneous Bridge Deck Details _____________________________________________ A-38

Reinforcing Bar Lists A-38

14.31 Reinforcing Bar List ________________________________________________________ A-38

Structural Steel Plate Girder Design A-38

14.32 Unit Modeling ______________________________________________________________ A-38

14.33 Section Design _____________________________________________________________ A-38

14.34 Stiffener Design and Locations ________________________________________________ A-39

14.35 Cross-frame Design _________________________________________________________ A-39

14.36 Connections _______________________________________________________________ A-39

14.37 Bearing Assembly Design and Detailing (with Jacking Analysis) ____________________ A-39

14.38 Splice Design _______________________________________________________________ A-39

14.39 Shear Stud Connectors ______________________________________________________ A-39

14.40 Deflection Analysis __________________________________________________________ A-39

14.41 Framing Plan ______________________________________________________________ A-39

14.42 Girder Elevation____________________________________________________________ A-39

14.43 Structural Steel Details ______________________________________________________ A-39

14.44 Splice Details ______________________________________________________________ A-39

14.45 Girder Deflections and Camber _______________________________________________ A-39

Structural Steel Box Girder Design A-39

14.46 Unit Modeling ______________________________________________________________ A-39

14.47 Section Design _____________________________________________________________ A-39

14.48 Stiffener Design and Locations ________________________________________________ A-39

14.49 Interior Cross Frame Design _________________________________________________ A-39

14.50 Exterior Cross Frame Design _________________________________________________ A-39

14.51 Connections _______________________________________________________________ A-39

14.52 Bearing Assembly Design and Detailing (with Jacking Analysis) ____________________ A-39

14.53 Splice Design _______________________________________________________________ A-39

14.54 Shear Stud Connectors ______________________________________________________ A-39

14.55 Deflection Analysis __________________________________________________________ A-39

14.56 Framing Plan ______________________________________________________________ A-39

14.57 Girder Elevation____________________________________________________________ A-39

14.58 Structural Steel Details ______________________________________________________ A-39

14.59 Splice Details ______________________________________________________________ A-39

14.60 Girder Deflections and Camber _______________________________________________ A-39

Load Ratings A-40

14.61 Load Ratings ______________________________________________________________ A-40

15 STRUCTURES – SEGMENTAL CONCRETE BRIDGES - N/A ____________________________ A-40

16 STRUCTURES – MOVABLE SPAN - N/A ______________________________________________ A-40

17 STRUCTURES – RETAINING WALL _________________________________________________ A-40

General Requirements A-40

17.1 Key Sheets _________________________________________________________________ A-40

17.2 Horizontal Wall Geometry ___________________________________________________ A-40

Permanent Proprietary Walls A-40 viii

17.3 Vertical Wall Geometry______________________________________________________ A-40

17.4 Semi Standard Drawings _____________________________________________________ A-40

17.5 Wall Plan and Elevations (Control Drawings) ___________________________________ A-40

17.6 Details ____________________________________________________________________ A-40

Temporary Proprietary Walls A-40

17.7 Vertical Wall Geometry______________________________________________________ A-40

17.8 Semi Standard Drawings _____________________________________________________ A-40

17.9 Wall Plan and Elevations (Control Drawings) ___________________________________ A-40

17.10 Details ____________________________________________________________________ A-40

Cast-in-Place Retaining Walls – N/A A-40

17.11 Design ____________________________________________________________________ A-40

17.12 Vertical Wall Geometry______________________________________________________ A-40

17.13 General Notes ______________________________________________________________ A-40

17.14 Wall Plan and Elevations (Control Drawings) ___________________________________ A-40

17.15 Sections and Details _________________________________________________________ A-40

17.16 Reinforcing Bar List ________________________________________________________ A-40

Other Retaining Walls A-40

17.17 Design ____________________________________________________________________ A-40

17.18 Vertical Wall Geometry______________________________________________________ A-41

17.19 General Notes, Tables and Miscellaneous Details _________________________________ A-41

17.20 Wall Plan and Elevations ____________________________________________________ A-41

17.21 Details ____________________________________________________________________ A-41

18 STRUCTURES - MISCELLANEOUS __________________________________________________ A-41

Concrete Box Culverts A-41

18.1 Concrete Box Culverts _______________________________________________________ A-41

18.2 Concrete Box Culverts Extensions _____________________________________________ A-41

Strain Poles A-41

18.3 Steel Strain Poles ___________________________________________________________ A-41

18.4 Concrete Strain Poles _______________________________________________________ A-41

Mast Arms A-41

18.5 Mast Arms ________________________________________________________________ A-41

Overhead/Cantilever Sign Structure A-41

18.6 Cantilever Sign Structures ___________________________________________________ A-41

18.7 Overhead Span Sign Structures _______________________________________________ A-41

18.8 Special (Long Span) Overhead Sign Structures __________________________________ A-41

18.9 Monotube-Overhead Sign Structure ___________________________________________ A-41

18.10 Bridge Mounted Signs (Attached to Superstructure) ______________________________ A-41

High Mast Light Foundations A-41

18.11 High Mast Lighting Structures ________________________________________________ A-41

Sound Barrier Walls (Ground Mount) – N/A A-41

18.12 Horizontal Wall Geometry ___________________________________________________ A-41

18.13 Vertical Wall Geometry______________________________________________________ A-41

18.14 Semi-Standard Drawings ____________________________________________________ A-41

18.15 Control Drawings ___________________________________________________________ A-41

18.16 Design for Wall Height Covered by Standard ____________________________________ A-41

18.17 Design for Wall height not Covered by Standards ________________________________ A-42

18.18 Aesthetic Details ____________________________________________________________ A-42

Special Structures – N/A A-42

18.19 To Be Determined By District – N/A ___________________________________________ A-42

18.20 Other Structures-N/A _______________________________________________________ A-42

19 SIGNING AND PAVEMENT MARKING ANALYSIS ____________________________________ A-42

19.1 Traffic Data Analysis. _______________________________________________________ A-42

19.2 No Passing Zone Study – N/A _________________________________________________ A-42

19.3 Reference and Master Design File _____________________________________________ A-42 ix

19.4 Multi Post Sign Support Calculations __________________________________________ A-42

19.5 Sign Panel Design Analysis ___________________________________________________ A-42

19.6 Sign Lighting/Electrical Calculations ___________________________________________ A-42

19.7 Quantities _________________________________________________________________ A-42

19.8 Computation Book – N/A ____________________________________________________ A-42

19.9 Cost Estimates _____________________________________________________________ A-42

19.10 Technical Special Provisions – N/A ____________________________________________ A-43

19.11 Other Signing and Pavement Marking Analysis __________________________________ A-43

19.12 Field Reviews ______________________________________________________________ A-43

19.13 Technical Meetings _________________________________________________________ A-43

19.14 Quality Assurance/Quality Control ____________________________________________ A-43

19.15 Independent Peer Review – N/A _______________________________________________ A-43

19.16 Supervision ________________________________________________________________ A-43

19.17 Coordination _______________________________________________________________ A-43

20 SIGNING AND PAVEMENT MARKING PLANS ________________________________________ A-43

20.1 Key Sheet _________________________________________________________________ A-44

20.2 Summary of Pay Items Including Trns*port Input _______________________________ A-44

20.3 Tabulation of Quantities _____________________________________________________ A-44

20.4 General Notes/Pay Item Notes ________________________________________________ A-44

20.5 Project Layout – N/A ________________________________________________________ A-44

20.6 Plan Sheet _________________________________________________________________ A-44

20.7 Typical Details – N/A ________________________________________________________ A-44

20.8 Guide Sign Work Sheet(s) ____________________________________________________ A-44

20.9 Traffic Monitoring Site ______________________________________________________ A-44

20.10 Cross Sections ______________________________________________________________ A-44

20.11 Special Service Point Details – N/A _____________________________________________ A-44

20.12 Special Details – N/A ________________________________________________________ A-44

20.13 Interim Standards – N/A _____________________________________________________ A-44

20.14 Quality Assurance/Quality Control ____________________________________________ A-44

20.15 Supervision ________________________________________________________________ A-45

21 SIGNALIZATION ANALYSIS ________________________________________________________ A-45

21.1 Traffic Data Collection ______________________________________________________ A-45

21.2 Traffic Data Analysis ________________________________________________________ A-45

21.3 Signal Warrant Study _______________________________________________________ A-45

21.4 Systems Timings ____________________________________________________________ A-45

21.5 Reference and Master Signalization Design File __________________________________ A-45

21.6 Reference and Master Interconnect Communication Design File ____________________ A-45

21.7 Overhead Street Name Sign Design ____________________________________________ A-45

21.8 Pole Elevation Analysis ______________________________________________________ A-45

21.9 Traffic Signal Operation Report – N/A _________________________________________ A-45

21.10 Quantities _________________________________________________________________ A-45

21.11 Cost Estimate ______________________________________________________________ A-46

21.12 Technical Special Provisions __________________________________________________ A-46

21.13 Other Signalization Analysis – N/A ____________________________________________ A-46

21.14 Field Reviews ______________________________________________________________ A-46

21.15 Technical Meetings _________________________________________________________ A-46

21.16 Quality Assurance/Quality Control ____________________________________________ A-46

21.17 Independent Peer Review ____________________________________________________ A-46

21.18 Supervision ________________________________________________________________ A-46

21.19 Coordination _______________________________________________________________ A-47

22 SIGNALIZATION PLANS ___________________________________________________________ A-47

22.1 Key Sheet _________________________________________________________________ A-47

22.2 Summary of Pay Items Including Trns*port Inut ________________________________ A-47 x

22.3 Tabulation of Quantities _____________________________________________________ A-47

22.4 General Notes/Pay Item Notes ________________________________________________ A-47

22.5 Plan Sheet _________________________________________________________________ A-47

22.6 Interconnect Plans __________________________________________________________ A-47

22.7 Traffic Monitoring Site ______________________________________________________ A-47

22.8 Guide Sign Worksheet _______________________________________________________ A-48

22.9 Special Details – N/A ________________________________________________________ A-48

22.10 Special Service Point Details – N/A _____________________________________________ A-48

22.11 Mast Arm/Monotube Tabulation Sheet _________________________________________ A-48

22.12 Strain Pole Schedule – N/A ___________________________________________________ A-48

22.13 TCP Signal (Temporary) _____________________________________________________ A-48

22.14 Temporary Detection Sheet ___________________________________________________ A-48

22.15 Utility Conflict Sheet – N/A ___________________________________________________ A-48

22.16 Interim Standards – N/A _____________________________________________________ A-48

22.17 Quality Assurance/Quality Control ____________________________________________ A-48

22.18 Supervision ________________________________________________________________ A-48

23 LIGHTING ANALYSIS ______________________________________________________________ A-48

23.1 Lighting Justification Report _________________________________________________ A-48

23.2 Lighting Design Analysis Report ______________________________________________ A-48

23.3 Aeronautical Evaluation _____________________________________________________ A-49

23.4 Voltage Drop Calculations ___________________________________________________ A-49

23.5 FDEP Coordination and Report – N/A _________________________________________ A-49

23.6 Reference and Master Design Files ____________________________________________ A-49

23.7 Temporary Lighting – N/A ___________________________________________________ A-49

23.8 Design Documentation _______________________________________________________ A-50

23.9 Quantities _________________________________________________________________ A-50

23.10 Cost Estimate ______________________________________________________________ A-50

23.11 Technical Special Provisions – N/A ____________________________________________ A-50

23.12 Other Lighting Analysis – N/A ________________________________________________ A-50

23.13 Field Reviews ______________________________________________________________ A-50

23.14 Technical Meetings – N/A ____________________________________________________ A-50

23.15 Quality Assurance/Quality Control ____________________________________________ A-50

23.16 Independent Peer Review – N/A _______________________________________________ A-51

23.17 Supervision ________________________________________________________________ A-51

23.18 Coordination _______________________________________________________________ A-51

24 LIGHTING PLANS _________________________________________________________________ A-51

24.1 Key Sheet _________________________________________________________________ A-51

24.2 Summary of Pay Item Sheet Including Trns*port Input ___________________________ A-51

24.3 Tabulation of Quantities _____________________________________________________ A-51

23.4 General Notes/Pay Item Notes ________________________________________________ A-51

23.5 Pole Data and Legend & Criteria ______________________________________________ A-51

24.6 Service Point Details ________________________________________________________ A-51

24.7 Project Layout – N/A ________________________________________________________ A-52

24.8 Plan Sheet _________________________________________________________________ A-52

24.9 Special Details – N/A ________________________________________________________ A-52

24.10 Temporary Lighting Data and Details – N/A _____________________________________ A-52

24.11 Traffic Control Plan Sheets – N/A _____________________________________________ A-52

24.12 Interim Standards – N/A _____________________________________________________ A-52

24.13 Quality Assurance/Quality Control ____________________________________________ A-52

24.14 Supervision ________________________________________________________________ A-52

25 LANDSCAPE ARCHITECTURE ANALYSIS - N/A ______________________________________ A-52

26 LANDSCAPE ARCHITECTURE PLANS - N/A __________________________________________ A-52 xi

27 SURVEY __________________________________________________________________________ A-52

27.1 Horizontal Project Network Control (HPNC) ____________________________________ A-53

27.2 Vertical Project Network Control (VPNC) ______________________________________ A-54

27.3 Alignment and/or Existing Right-of-Way Lines __________________________________ A-54

27.4 Aerial Targets ______________________________________________________________ A-54

27.5 Reference Points ____________________________________________________________ A-54

27.6 Topography (2D) Y, Field Edit ________________________________________________ A-55

27.7 Digital Terrain Model (DTM) _________________________________________________ A-55

27.8 Roadway Cross Sections/Profiles ______________________________________________ A-55

27.9 Side Street Surveys _________________________________________________________ A-55

27.10 Underground Utitilities ______________________________________________________ A-55

27.11 Outfall Survey _____________________________________________________________ A-55

27.12 Drainage Survey ____________________________________________________________ A-56

27.13 Bridge Survey ______________________________________________________________ A-56

27.14 Channel Survey _____________________________________________________________ A-56

27.15 Pond Site Survey ___________________________________________________________ A-56

27.16 Mitigation Survey - N/A ______________________________________________________ A-56

27.17 Jurisdiction Line Survey _____________________________________________________ A-56

27.18 Geotechnical Support _______________________________________________________ A-56

27.19 Sectional/Grant Survey ______________________________________________________ A-56

27.20 Subdivision Location ________________________________________________________ A-57

27.21 Maintained R/W - N/A _______________________________________________________ A-57

27.22 Boundary Survey - N/A _______________________________________________________ A-57

27.23 Water Boundary Survey - N/A _________________________________________________ A-57

27.24 Right-of-Way Staking _______________________________________________________ A-57

27.25 Right-of-Way Monumentation ________________________________________________ A-57

27.26 Line Cutting _______________________________________________________________ A-57

27.27 Work Zone Safety __________________________________________________________ A-57

27.28 Miscellaneous Surveys _______________________________________________________ A-58

27.29 Supplemental Surveys - N/A __________________________________________________ A-58

27.30 Document Reserach _________________________________________________________ A-58

27.31 Field Review _______________________________________________________________ A-58

27.32 Technical Meetings _________________________________________________________ A-58

27.33 Quality Control/Quality Assurance ____________________________________________ A-58

27.34 Supervision ________________________________________________________________ A-58

27.35 Coordination _______________________________________________________________ A-58

28 PHOTOGRAMMETRY ______________________________________________________________ A-58

28.1 Flight Preparation __________________________________________________________ A-59

28.2 Control Point Coordination __________________________________________________ A-59

28.3 Mobilization _______________________________________________________________ A-59

28.4 Flight Operations ___________________________________________________________ A-59

28.5 Film Processing ____________________________________________________________ A-59

28.6 Photo Products _____________________________________________________________ A-59

28.7 Scanning __________________________________________________________________ A-59

28.8 Lidar _____________________________________________________________________ A-60

28.9 Aerial Triangulation ________________________________________________________ A-60

28.10 Surfaces ___________________________________________________________________ A-60

28.11 Ortho Generation ___________________________________________________________ A-60

28.12 Rectified Digital Imagery (Georeferenced) ______________________________________ A-60

28.13 Mosaicking ________________________________________________________________ A-60

28.14 Sheet Clipping _____________________________________________________________ A-60

28.15 Topographics (3D) __________________________________________________________ A-60

28.16 Planimetrics (2D) ___________________________________________________________ A-60

28.17 Drainage Basin _____________________________________________________________ A-60 xii

28.18 CADD Edit ________________________________________________________________ A-60

28.19 Data Merging ______________________________________________________________ A-60

28.20 Miscellaneous ______________________________________________________________ A-60

28.21 Field Review _______________________________________________________________ A-60

28.22 Meetings __________________________________________________________________ A-61

28.23 Quality Control/Quality Assurance ____________________________________________ A-61

28.24 Supervision ________________________________________________________________ A-61

28.25 Coordination _______________________________________________________________ A-61

29 MAPPING _________________________________________________________________________ A-61

Mast…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .