0001-01-075_0926.txt
TXT text file 4 KB Posted
- Solicitation number
- 0001-01-075_0926
- Issued by
- Texas
About this file
This is an Official Advertisement for a State Let Construction Contract issued by the Texas Department of Transportation (TxDOT) for El Paso County, encompassing multiple hazard elimination and safety projects across various highways and roadways. The contract involves safety improvements and infrastructure enhancements at ten distinct project locations throughout El Paso County, including work on State Highway 20, various farm-to-market roads, and local streets. The estimated cost for this comprehensive project is $3,804,564.00, with a completion timeline of 173 working days. Bids were received and opened on September 3, 2026, at 1:00 PM. Prospective bidders were directed to submit bids to the Texas Department of Transportation's Austin Headquarters location, with inquiries directed to Rene Romero at the El Paso district office. The project is identified as STP 2027(089)HES and related supplemental projects designated as STP 2027(126)HESG and STP 2025(976)VRU.
The contract establishes a performance guaranty of $76,000.00 and carries a Disadvantaged Business Enterprise (DBE) goal of 0.0%. Funding is sourced through Surface Transportation Program allocations. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the official project proposal documentation serve as the authoritative sources for bidding information and advertisement, superseding all other informational sources including TxDOT webpages. Bidders are required to utilize these official channels and incorporate any addenda issued during the bidding process.
Text of this file
******* OFFICIAL ADVERTISEMENT *******
*** STATE LET CONSTRUCTION CONTRACT ***
COUNTY: EL PASO HIGHWAY: SH 20, ETC LENGTH: 0 MI
CONTROL NUMBER: 0001-01-075, ETC DBE GOAL: 0.0%
PROJECT NUMBER: STP 2027(089)HES
TYPE: HAZARD ELIMINATION & SAFETY
TIME FOR COMPLETION: 173 WORKING DAYS GUARANTY: 76,000.00
BIDS RECEIVED UNTIL: 1:00 PM September 3, 2026 EST.COST: 3,804,564.00 BIDS WILL BE OPENED: 1:00 PM September 3, 2026
MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION RENE ROMERO
24E-ELPASO
AUSTIN HQ - STASSNEY EL PASO TX 79904
6230 E STASSNEY LN RM MIC3.02 915 8495552
AUSTIN TX 78744-3147
(512) 416-2498
COUNTY CONTROL LIMITS FROM
HIGHWAY PROJECT LIMITS TO
EL PASO 0001-01-075 TEXAS/NEW MEXICO STATE LINE
SH 20 STP 2027(089)HES MESA ST
LENGTH:
EL PASO 0924-06-716 (ON EDGEMERE BLVD) MCRAE BLVD
EDGEMERE STP 2027(126)HESG TIM FOSTER ST
LENGTH:
EL PASO 1046-01-048 MONTANA AVE
FM 659 STP 2025(976)VRU NORTH LOOP DR
LENGTH:
EL PASO 0924-06-721 (ON RESLER DR) TRANSMOUNTAIN RD
RESLER DR STP 2027(126)HESG DESERT PASS
LENGTH:
EL PASO 0674-01-080 INGLEWOOD DR
FM 76 STP 2027(089)HES FM 1281
LENGTH:
EL PASO 0167-01-135 HONDO PASS
US 54 STP 2025(976)VRU KENWORTHY ST
LENGTH:
EL PASO 3451-01-050 FM 76
FM 1281 STP 2025(976)VRU EASTLAKE BLVD
LENGTH:
EL PASO 0001-04-106 STANTON ST
US 62 STP 2027(089)HES CONCEPCION ST
LENGTH:
EL PASO 0924-06-724 (ON YARBROUGH DR) MONTANA AVE
YARBROUGH STP 2027(126)HESG CINECUE DR
LENGTH:
EL PASO 2326-01-032 US 54
FM 2529 STP 2025(976)VRU DYER ST
LENGTH:
EL PASO 0674-01-079 STEWART DR
FM 76 STP 2025(976)VRU N LEE TREVINO DR
LENGTH:
EL PASO 0001-04-107 S SANTA FE ST
US 85 STP 2027(089)HES STANTON ST
LENGTH:
EL PASO 0167-01-136 ELLETHORPE AVE
US 54 STP 2025(976)VRU PAISANO DR
LENGTH:
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .