0000011919_-_Legal_Notice.pdf
PDF 99 KB Posted
- Attached to
- EXT DPW | 1011 Turk St Switchboard, UPS2, & HVAC
- Solicitation number
- SFGOV-0000011919
- Issued by
- San Francisco County, San Francisco City, California
About this file
This is a legal notice issued by the Department of Public Works (DPW) for the City and County of San Francisco, California, regarding a construction contract opportunity for switchboard, UPS, and HVAC replacement work at 1011 Turk Street. The project encompasses three major scopes of work: replacement of existing low-voltage switchboards with associated modifications and commissioning; like-for-like replacement of Uninterrupted Power System (UPS) 2 and relocation of a new low-voltage transformer; and HVAC equipment replacement and improvements in the Telecom Room, Server Room, and UPS1 Room, including air duct modifications and system integration with existing building management systems. The work is designed to maintain facility operations during construction through phased shutdown sequencing and coordinated cutover procedures. The project allows 600 consecutive calendar days for completion. A mandatory on-site pre-bid meeting and site walk is scheduled for Tuesday, September 15, 2026, at 1:00 PM at the project location in San Francisco, with attendees meeting promptly in the lobby. A Class "B" contractor license is required to submit a bid.
The estimated construction cost for this project is approximately $7,800,000. Bid documents, plan holders lists, and addendum information are available for download at no cost through the DPW Electronic Bid Documents Download Site at https://bsm.sfdpw.org/ContractAdmin/Login.aspx. Additional contract and bid opportunity information, including advertisements and bid tabulations, can be accessed through DPW's Contracts & Bid Opportunities portal at https://bidopportunities.apps.sfdpw.org/. Documentation from the pre-bid conference and labor standards requirements, including the Healthcare Security Ordinance and prevailing wage information, are available through the Office of Labor Standards Enforcement (OLSE) website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXT_DPW___1011_Turk_St_Switchboard__UPS2____HVAC.pdf | ||
| EXT_DPW___1011_Turk_St_Switchboard__UPS2____HVAC.xml | XML file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVERTISEMENT FOR BIDS
CITY & COUNTY OF SAN FRANCISCO
SAN FRANCISCO PUBLIC WORKS
Sourcing Event ID No.: 0000011919
1011 TURK STREET SWITCHBOARD, UPS2, AND HVAC REPLACEMENT
(PW 1011 Turk St Swtchbrd, UPS2)
Bids shall be submitted online via ShareFile until 2:30:00 p.m. on October 14, 2026, after which the bid opening will be conducted live online via Microsoft Teams. Contract Administration will email the Microsoft Teams meeting information to all Plan Holders approximately 24 hours prior to Bid Opening. Digital files of Bid Documents, Plan Holders Lists, and Addenda may be downloaded at no cost from the Public Works Electronic Bid Documents Download site at https://bsm.sfdpw.org/ContractAdmin/Login.aspx .
Please visit the Contracts, Bids and Payments webpage at https://bidopportunities.apps.sfdpw.org for more information. Notices regarding Addenda and other bid changes will be distributed by email to Plan Holders.
Scope of Work: The project includes three major scopes of work as summarized herein:
1. Replacement of the existing low-voltage switchboards serving the facility, including associated feeder modifications, terminations testing, and commissioning. The work also includes temporary power provisions, phased shutdown sequencing, and cutover coordination to maintain facility operations during construction.
2. Like-for-like replacement of Uninterrupted Power System (UPS) 2, relocation of a new like-for-like low voltage transformer replacement, and electrical connections to new mechanical equipment.
3. HVAC equipment replacement and improvement in the Telecom Room, Server Room, and UPS1 Room. The work includes air duct and AHU modifications, installation of new air circulation between the Server Room and Telecom Room, system integration with the existing BMS, testing, and commissioning; the work also includes power distribution system and HVAC equipment cutover coordination.
The time allowed for completion is 600 consecutive calendar days. The estimated construction cost is approximately $7,800,000. For more information, contact the Project Manager Lisa Zhuo by phone: (628) 271-2777 or email: Lisa.Zhuo@sfdpw.org .
On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went into effect. The program requires that all contractors and subcontractors who bid or work on a public works project register and pay an annual fee to the California Department of Industrial Relations (“DIR”).
No contractor or subcontractor may be listed in a bid or awarded a contract for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
This Project shall incorporate the required partnering elements for Partnering Level 2. Refer to Section 01 31 33 for more details.
Pursuant to San Francisco Administrative Code (“Administrative Code”) Section 6.25 and Chapter 25 of the Environment Code, “Clean Construction” is required for the performance of all work.
The Specifications include liquidated damages. Contract will be on a Lump Sum Bid Items basis.
Progressive payments will be made.
The Contract will be awarded to the lowest responsible responsive bidder.
https://bsm.sfdpw.org/ContractAdmin/Login.aspx https://bidopportunities.apps.sfdpw.org/ mailto:Lisa.Zhuo@sfdpw.org
A bid may be rejected if the City determines that any of the bid item prices are materially unbalanced to the potential detriment of the City.
Bid discounts, including Neighborhood LBE Pilot Program discounts, may be applied as per Administrative Code Chapter 14B. LBE Subcontracting Participation Requirement is 20%. In accordance with Administrative Code Chapter 14B requirements, good faith efforts may apply. Refer to CMD Form 2B. For details, contact Norbu Dhonyo by phone at (415) 554-0648 or by email at Norbu.Dhonyo@sfgov.org.
The Neighborhood LBE Pilot Program applies to this project. Firms whose principal place of business is located within Supervisorial District 5 and / or project zip codes 94102 may be eligible for additional bid discounts as work is anticipated to be performed in these specific neighborhood(s) and zip code(s).
Refer to CMD Attachment 1, Section 2.01 on application of the Prime Neighborhood/Zip Code and Subcontracting Neighborhood/Zip Code bid discounts.
An on-site pre-bid meeting and site walk will be held on Tuesday, September 15, 2026, at 1:00PM at the project site located at 1011 Turk Street in San Francisco. We will meet promptly at 1:00PM in the lobby.
For information on the City’s Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com .
A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award.
Class "B" license is required to bid.
In accordance with Administrative Code Chapter 6, no bid is accepted and no contract in excess of Threshold is awarded by the City and County of San Francisco Department of Public Works until such time as the Mayor approves the contract for award and the Director of Public Works then issues an order of award.
Beginning on September 1, 2022, no Bid is accepted and no contract in excess of the Threshold Amount is awarded by the City and County of San Francisco until such time the Director of Public Works recommends the contract for award and the Public Works Commission then adopts a resolution awarding the Contract.
Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds.
Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations. Minimum wage rates other than applicable to General Prevailing Wage must comply with San Francisco Labor and Employment Code Article 111: Minimum Compensation.
This Project is subject to the requirements of the San Francisco Local Hiring Policy for Construction (''Policy'') as set forth in Administrative Code Section 6.22(g). Bidders are hereby advised that the requirements of the Policy will be incorporated as a material term of any contract awarded for the Project. Refer to Section 00 73 30 of the Project Manual for more information.
Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 of the San Francisco Labor and Employment Code within two weeks after notification of award.
mailto:Norbu.Dhonyo@sfgov.org mailto:cdp@imwis.com
If a bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the bidder shall, no later than the 10th working day prior to the date of Bid Opening, provide written notice to the Contract Administration Division, San Francisco Public Works, setting forth with specificity the grounds for the objection.
Right reserved to reject any or all bids and waive any minor irregularities.
File details come from the government source that posted it. Updated .