0000008606_-_Legal_Notice.pdf
PDF 141 KB Posted
- Attached to
- EXT DPW | PW FRONT SNSM 1ST MNTGMRY PR
- Solicitation number
- SFGOV-0000008606
- Issued by
- San Francisco County, San Francisco City, California
About this file
This is a legal notice and advertisement for bids issued by the City and County of San Francisco, Department of Public Works, for the Front Street and Sansome Street Pavement Renovation and Sewer Replacement project. The scope of work encompasses paving, sewer and drainage improvements, and traffic control along Front Street, Sansome Street, Montgomery Street, and Trenton Street in District 3, with an estimated construction cost of approximately $3,970,000. The project completion timeline is 320 consecutive calendar days. Bids must be submitted online via ShareFile by 2:30 p.m. on September 9, 2026, followed by a live online bid opening via Microsoft Teams. A pre-bid meeting was scheduled for Thursday, August 20, 2026, at 10:00 a.m. via Microsoft Teams conference call. Bid documents and addenda are available for free download from the Public Works Electronic Bid Documents Download site. Digital bid files, Plan Holders Lists, and addenda may be obtained at https://bsm.sfdpw.org/ContractAdmin/Login.aspx, with notices regarding changes distributed via email to plan holders.
The contract will be awarded on a lump sum with unit prices basis to the lowest responsible responsive bidder, with progressive payments to be made throughout the project. A corporate surety bond or certified check for ten percent of the amount bid must accompany each submission. Contractors must hold a Class "A" license and register with the California Department of Industrial Relations as required by Labor Code section 1725.5. An LBE Subcontracting Participation Requirement of 25% applies, with bid discounts available under the Pilot Neighborhood LBE Program for firms located in Supervisorial Districts 3 or project zip codes 94104, 94108, 94111, and 94133. Performance and payment bonds for 100% of the contract award are required per Administrative Code Section 6.22(a). The project is subject to prevailing wage requirements, San Francisco Local Hiring Policy for Construction, Equal Benefits Provisions compliance certification, and Clean Construction requirements. Project Manager Edmund Lee may be contacted at (628) 271-2567 or Edmund.Lee@sfdpw.org, and LBE inquiries should be directed to Winnie Chen at (415) 554-0647 or Winnie.Chen3@sfgov.org.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXT_DPW___PW_FRONT_SNSM_1ST_MNTGMRY_PR.xml | XML file | |
| EXT_DPW___PW_FRONT_SNSM_1ST_MNTGMRY_PR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVERTISEMENT FOR BIDS
CITY & COUNTY OF SAN FRANCISCO
SAN FRANCISCO PUBLIC WORKS
SOURCING EVENT ID: 0000008606
FRONT STREET AND SANSOME STREET PAVEMENT RENOVATION AND SEWER REPLACEMENT
PW FRONT SNSM 1ST MNTGMRY PR
Bids shall be submitted online via ShareFile until 2:30:00 p.m. on September 9, 2026, after which the bid opening will be conducted live online via Microsoft Teams. Contract Administration will email the Microsoft Teams meeting information to all Plan Holders approximately 24 hours prior to Bid Opening.
Digital files of Bid Documents, Plan Holders Lists, and Addenda may be downloaded at no cost from the Public Works Electronic Bid Documents Download site at https://bsm.sfdpw.org/ContractAdmin/Login.aspx. Please visit the Contracts, Bids and Payments webpage at https://bidopportunities.apps.sfdpw.org for more information. Notices regarding Addenda and other bid changes will be distributed by email to Plan Holders.
Scope of Work: located along Front Street, Sansome Street, Montgomery Street, and Trenton Street in District 3 of San Francisco, California and consists of paving, sewer and drainage, traffic control, and all related work.
The time allowed for completion is 320 consecutive calendar days. The estimated construction cost is approximately $3,970,000. For more information, contact the Project Manager Edmund Lee by phone:
(628) 271-2567 or email: Edmund.Lee@sfdpw.org.
On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went into effect. The program requires that all contractors and subcontractors who bid or work on a public works project register and pay an annual fee to the California Department of Industrial Relations (“DIR”).
No contractor or subcontractor may be listed in a bid or awarded a contract for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
This Project shall incorporate the required partnering elements for Partnering Level 2. Refer to Section 01 31 33 - Partnering Procedures for more details.
Pursuant to San Francisco Administrative Code (“Administrative Code”) Section 6.25 and Chapter 25 of the Environment Code, “Clean Construction” is required for the performance of all work.
The Specifications include liquidated damages. Contract will be on a Lump Sum with Unit Prices basis.
Progressive payments will be made.
The Contract will be awarded to the lowest responsible responsive bidder.
A bid may be rejected if the City determines that any of the bid item prices are materially unbalanced to the potential detriment of the City.
Bid discounts, including Pilot Neighborhood LBE Program discounts, may be applied as per Administrative Code Chapter 14B. LBE Subcontracting Participation Requirement is 25%. In accordance with Administrative Code Chapter 14B requirements, good faith efforts may apply. Refer to CMD Form 2B. For details, contact Winnie Chen by phone at (415) 554-0647 or by email at Winnie.Chen3@sfgov.org.
The Neighborhood LBE Pilot Program applies to this project. Firms whose principal place of business is https://bsm.sfdpw.org/ContractAdmin/Login.aspx https://bidopportunities.apps.sfdpw.org/ mailto:Edmund.Lee@sfdpw.org mailto:Winnie.Chen3@sfgov.org located within Supervisorial Districts 3 and/or project zip codes 94104, 94108, 94111, and 94133 may be eligible for additional bid discounts bid discounts as work is anticipated to be performed in these specific neighborhood(s) and zip code(s). Refer to CMD Attachment 1, Section 2.01 on application of the Prime Neighborhood/Zip Code and Subcontracting Neighborhood/Zip Code bid discounts.
A pre-bid meeting will be held by conference call on Thursday, August 20, 2026 starting at 11:00 a.m.
Microsoft Teams Meeting
Call in (audio only) +1 415-906-4659,,624218426# United States, San Francisco Phone Conference ID: 624 218 426#
Join on your computer or mobile app or room device https://teams.microsoft.com/meet/219406178938963?p=tt4HGIzCmolhdGcIDr Meeting ID: 219 406 178 938 963 Passcode: 2CS6BM3d
For information on the City’s Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com.
A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award.
Class "A" license is required to bid.
In accordance with Administrative Code Chapter 6, no bid is accepted and no contract in excess of Threshold is awarded by the City and County of San Francisco Department of Public Works until such time as the Mayor approves the contract for award and the Director of Public Works then issues an order of award.
Beginning on September 1, 2022, no Bid is accepted and no contract in excess of the Threshold Amount is awarded by the City and County of San Francisco until such time the Director of Public Works recommends the contract for award and the Public Works Commission then adopts a resolution awarding the Contract.
Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds.
Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations. Minimum wage rates other than applicable to General Prevailing Wage must comply with San Francisco Labor and Employment Code Article 111: Minimum Compensation.
This Project is subject to the requirements of the San Francisco Local Hiring Policy for Construction (''Policy'') as set forth in Administrative Code Section 6.22(g). Bidders are hereby advised that the requirements of the Policy will be incorporated as a material term of any contract awarded for the Project. Refer to Section 00 73 30 - Local Hiring Requirements of the Project Manual for more information.
Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 of the San Francisco Labor and Employment Code within two weeks after notification of award.
If a bidder objects on any ground to any bid specification or legal requirement imposed by this https://teams.microsoft.com/meet/219406178938963?p=tt4HGIzCmolhdGcIDr mailto:cdp@imwis.com
Advertisement for Bids, the bidder shall, no later than the 10th working day prior to the date of Bid Opening, provide written notice to the Contract Administration Division, San Francisco Public Works, setting forth with specificity the grounds for the objection.
Right reserved to reject any or all bids and waive any minor irregularities.