0000002326_-_Legal_Notice.pdf

PDF 220 KB Posted

Attached to
EXT DPW | SOMArts Cltrl Cntr - ADA Br
Solicitation number
SFGOV-0000002326
Issued by
San Francisco County, San Francisco City, California

About this file

This is a legal notice for the City and County of San Francisco, Department of Public Works (DPW), regarding an ADA Barrier Removal project at SOMArts Cultural Center. The project scope encompasses accessibility improvements to the building's first and second floors, including installation of a new hydraulic LULA (Limited Use Limited Access) lift with an associated machine room and stair, accessible restroom upgrades, and a new drinking fountain on the first floor. Second floor modifications include relocation of the existing kiln to accommodate the new lift and stair. Optional aesthetic upgrades include new restroom flooring and an optional bid alternate for main hall floor renewal with durable epoxy coating. An onsite pre-bid meeting and site walk are scheduled for Wednesday, July 29, 2026 at 10:00 AM at SOMArts Cultural Center, located at 934 Brannan Street, San Francisco. The project timeline allows for 150 consecutive calendar days for completion, and a Class "B" contractor license is required to bid.

The estimated construction cost is approximately $1,500,000. Bidders can access advertisement, tabulation of bids, and awards information through DPW's Contracts & Bid Opportunities website. Bid documents, plan holders lists, and addendum information are available at no cost through the DPW Electronic Bid Documents Download Site. Additional documents including Healthcare Security Ordinance requirements, pre-bid and pre-construction information, and Paid Sick Leave Ordinance fact sheets are available through the Office of Labor Standards Enforcement (OLSE) website. As of March 1, 2015, all contractors and subcontractors listed in bids for public works projects must be registered with the California Department of Industrial Relations (DIR) as required by Labor Code section 1725.

View the file

Other files

File Type Posted
EXT_DPW___SOMArts_Cltrl_Cntr_-_ADA_Br.pdf PDF
EXT_DPW___SOMArts_Cltrl_Cntr_-_ADA_Br.xml XML file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

CITY & COUNTY OF SAN FRANCISCO

SAN FRANCISCO PUBLIC WORKS

Sourcing Event ID No.: 0000002326

SOMARTS CULTURAL CENTER - ADA BARRIER REMOVAL

(PW SOMArts Cltrl Cntr - ADA Br)

Bids shall be submitted online via ShareFile until 2:30:00 p.m. on Wednesday, August 12, 2026, after which the bid opening will be conducted live online via Microsoft Teams. Contract Administration will email the Microsoft Teams meeting information to all Plan Holders approximately 24 hours prior to Bid Opening. Digital files of Bid Documents, Plan Holders Lists, and Addenda may be downloaded at no cost from the Public Works Electronic Bid Documents Download site at https://bsm.sfdpw.org/ContractAdmin/Login.aspx . Please visit the Contracts, Bids and Payments webpage at https://bidopportunities.apps.sfdpw.org for more information. Notices regarding Addenda and other bid changes will be distributed by email to Plan Holders.

Scope of Work: The SOMArts ADA Barrier Removal Project aims to improve public accessibility to the building’s first and second floors. The work includes installing a new hydraulic LULA (Limited Use Limited Access) lift with an associated machine room and stair, as well as providing accessible restroom upgrades and a new drinking fountain on the first floor. On the second floor, the project makes related modifications to accommodate the new lift and stair, including relocating the existing kiln. Along with these accessibility-focused improvements, the project includes limited aesthetic upgrades such as new restroom flooring, with an optional bid alternate to renew the main hall floor with a durable epoxy coating, all as shown on the drawings and as specified in these Specifications.

The time allowed for completion is 150 consecutive calendar days. The estimated construction cost is approximately $1,500,000. For more information, contact the Project Manager Gabriel Lim by phone:

(628) 271-2977 or email: gabriel.lim@sfdpw.org .

On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went into effect. The program requires that all contractors and subcontractors who bid or work on a public works project register and pay an annual fee to the California Department of Industrial Relations (“DIR”).

No contractor or subcontractor may be listed in a bid or awarded a contract for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

This Project shall incorporate the required partnering elements for Partnering Level 1. Refer to Section 01 31 33 for more details.

Pursuant to San Francisco Administrative Code (“Administrative Code”) Section 6.25 and Chapter 25 of the Environment Code, “Clean Construction” is required for the performance of all work.

The Specifications include liquidated damages. Contract will be on a Lump Sum Bid Items basis.

Progressive payments will be made.

The Contract will be awarded to the lowest responsible responsive bidder.

A bid may be rejected if the City determines that any of the bid item prices are materially unbalanced to the potential detriment of the City.

Bid discounts may be applied as per Administrative Code Chapter 14B. The LBE Subcontractor Participation Requirement for this Contract is 16 percent. The requirement has been set less than 20% because the contingencies and the LULA Lift installation represent a substantial portion of the total estimated contract value. For details, contact Winnie Chen by phone at (415) 554-0647 or by email at winnie.chen3@sfgov.org. In accordance with Administrative Code Chapter 14B requirements,.good faith efforts may apply. Refer to CMD Form 2B.

An onsite pre-bid meeting and site walk will be hold on Wednesday, July 29, 2026 at 10:00AM at SOMArts Cultural Center located at 934 Brannan Street, San Francisco.

For information on the City’s Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com .

A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award.

Class "B" license is required to bid.

In accordance with Administrative Code Chapter 6, no bid is accepted and no contract in excess of Threshold is awarded by the City and County of San Francisco Department of Public Works until such time as the Mayor approves the contract for award and the Director of Public Works then issues an order of award.

Beginning on September 1, 2022, no Bid is accepted and no contract in excess of the Threshold Amount is awarded by the City and County of San Francisco until such time the Director of Public Works recommends the contract for award and the Public Works Commission then adopts a resolution awarding the Contract.

Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds.

Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations. Minimum wage rates other than applicable to General Prevailing Wage must comply with San Francisco Labor and Employment Code Article 111: Minimum Compensation.

This Project is subject to the requirements of the San Francisco Local Hiring Policy for Construction (''Policy'') as set forth in Administrative Code Section 6.22(g). Bidders are hereby advised that the requirements of the Policy will be incorporated as a material term of any contract awarded for the Project. Refer to Section 00 73 30 of the Project Manual for more information.

Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 of the San Francisco Labor and Employment Code within two weeks after notification of award.

If a bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the bidder shall, no later than the 10th working day prior to the date of Bid Opening, provide written notice to the Contract Administration Division, San Francisco Public Works, setting forth with specificity the grounds for the objection.

Right reserved to reject any or all bids and waive any minor irregularities.

File details come from the government source that posted it. Updated .