00_140R3024R0003_Piping___Structural_Steel_IDIQ_Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Structural Steel and Piping IDIQ Federal contract opportunity
- Solicitation number
- 140R3024R0003
About this file
This document is a solicitation for a multiple-award Indefinite Delivery Indefinite Quantity (IDIQ) contract for structural steel and piping repair and replacement services at Hoover Dam, Parker Dam, and Davis Dam. The Bureau of Reclamation, Interior Region 8: Lower Colorado Basin is seeking proposals for this requirement, with an anticipated award of two or more contracts. The ordering period will be 5 years, with a cumulative value not to exceed $11,000,000. Task Order 1 for "N1 Cooling Rings" is expected to be awarded at the time of the IDIQ contract award, with an estimated value between $1,000,000 and $5,000,000. Offerors must complete and submit pricing for Task Order 1 as part of their proposal. The NAICS code is 237110, Water and Sewer Line Structure Construction, with a small business size standard of $45 million in average annual receipts. A site visit is scheduled for June 4, 2024, and written questions are due by June 7, 2024.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R3024R0003
Contract No. TBD
Full and Open Competition
Structural Steel and Piping Repair IDIQ – Multiple-
Award Indefinite Delivery / Indefinite Quantity (IDIQ) for Hoover Dam, Parker Dam, and Davis Dam
U.S. Department of the Interior
Bureau of Reclamation
Interior Region 8: Lower Colorado Basin
This page intentionally left blank
FOREWORD
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair IDIQ
The BOR, Interior Region 8: Lower Colorado Basin is seeking to award a multiple-award Indefinite
Delivery Indefinite Quantity (IDIQ) contract for structural steel and piping repair and replacement.
Contractors must provide all personnel, equipment, tools, materials, and supervision as well as any additional items and services necessary to provide work as defined in these Specifications and individual task orders. All work is to be performed at Hoover Dam, Parker Dam, and Davis Dam. Additionally, the
Government anticipates that Task Order 1 for “N1 Cooling Rings” will be awarded at the time of award of IDIQ contract(s).
This acquisition is being procured under Federal Acquisition Regulations Part 15, Contracting by
Negotiation. Offerors are cautioned to carefully review the offer submission requirements contained in
Section L and the evaluation criteria and standards contained in Section M. To be considered qualified for this work, offerors must fully address all evaluation factors. Reference Section L, for instructions and
Section M, paragraph M.2 for evaluation factors and acceptability standards. The Government anticipates making award without discussions.
NAICS: The North American Industry Classification System (NAICS) code for this acquisition is
237110, Water and Sewer Line Structure Construction, which has a small business size standard of $45.0 million in average annual receipts.
MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition
Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, the estimated magnitude of each task order will range between $100,000.00 and $250,000.00; $250,000 and $500,000; $500,000 and $1,000,000; and $1,000,000 and $5,000,000.
MULTIPLE AWARDS: The Government intends to issue two (2) or more awards under this Indefinite-
Delivery/Indefinite-Quantity (IDIQ) solicitation, but it reserves the right to award more, less, or none at all.
In accordance with FAR 19.702(a)(2) If a Large Business submits a proposal it must submit a subcontracting plan as part of its package. Large Businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan.
IDIQ VALUE: The ordering period for the proposed IDIQ contract(s) will be for five (5) years from the date of contract award with the cumulative/maximum amount of all task orders not exceeding
$11,000,000.00. The minimum order guarantee is $2,500.00. The Government does not guarantee an awardee will receive more than the contract’s minimum guarantee. Task order procedures are identified in F.4 Task Order Issuance Procedures.
TASK ORDER 1: The Government anticipates that Task Order 1 will be awarded at the time of award of
IDIQ contract(s). In accordance with Federal Acquisition Regulation (FAR) 36.204 Disclosure of the
Magnitude of Construction Projects, the estimated magnitude of each task order will range between
$1,000,000 and $5,000,000.
SITE VISIT: See Section L.6, FAR 52.236-27 Site Visit (Construction) for information regarding the organized site visit. A site visit will be held on 06/04/2024 at 10:00am local time. The site visit will be held at Hoover Dam. Contact Ronald “Scott” Pringle, rpringle@usbr.gov if you intend to attend the site visit. If no notification is received from interested vendors, the site visit will be cancelled.
mailto:rpringle@usbr.gov
Project Title
Personal Protective Equipment will be required. Participants must bring steel toe shoes and hard hat to do the walk through.
Vendors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the price of the work to be performed, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after award of the contract.
WRITTEN QUESTIONS: Requesting Clarification. Offerors may submit written questions requesting clarification of solicitation requirements. All questions shall be received no later than 06/07/2024 at 2:00pm.
Questions received after that date may not be entertained. ONLY WRITTEN QUESTIONS WILL RECEIVE
A RESPONSE. Each question submitted shall contain the following information: document name, document date, specific page, paragraph, clause or other definitive citation for which clarification is requested. All questions shall be submitted electronically via email to Ronald “Scott” Pringle at rpringle@usbr.gov.
Answers will be provided to only questions submitted in writing, and all answers will be provided in an amendment through the Contracting Opportunities via SAM.gov.
OFFER SUBMISSION: See solicitation Section L.10, 1452.215-81 Proposal Instructions--Bureau of
Reclamation, which specifies the number of copies of each proposal volume to be furnished with the
Offeror's proposal.
For date and place of receipt of quotes see the Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442 form.
For the date, place, and time of Offer Submission, See Standard Form (SF) 1442.
OTHER NOTES TO OFFERORS: For information regarding Bureau of Reclamation’s publication
“Reclamation Safety and Health Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause WBR 1452.223-81 Safety and Health.
mailto:rpringle@usbr.gov
Table of Contents
Project Title i
TABLE OF CONTENTS
TABLE OF CONTENTS
PART I – THE SCHEDULE
SECTION A – Solicitation/Contract Form – SF-1442 A-1
SECTION B - Supplies or Services and Prices/Costs
B.1 The Requirement B-1
B.2 Price Schedule B-1
SECTION C – Description/Specifications/Statement of Work C-1
C.1 Statement of Work/Specifications C-1
SECTION D - Packaging and Marking – Not applicable D-1
SECTION E - Inspection and Acceptance E-1
E.1 52.252-2 Clauses Incorporated by Reference E-1
SECTION F - Deliveries or Performance F-1
F.1 52.252-2 Clauses Incorporated by Reference F-1
F.2 52.211-10 Commencement, Prosecution, and Completion of Work F-1
F.3 Task Order Issuance Procedures F-1
SECTION G - Contract Administration Data G-1
G.1 1452.201-70 Authorities and Delegations G-1
G.2 1452.201-80 Contracting Officer’s Representative’s Authorities and
Limitations
G-2
G.3 DOI-AAAP-0028 V3 Invoice Platform (IPP)—Treasury Electronic Invoicing
System
G-3
G.4 DOI-AAAP-0050 V2 Notice to Contractors-Contractor Performance
Assessment Reporting System
G-3
G.5 1452.242-80 Post Award Conference—Bureau of Reclamation G-5
G.6 Government Administration Personnel G-5
SECTION H - Special Contract Requirements – Not applicable H-1
PART II - CONTRACT CLAUSES
SECTION I - Contract Clauses I-1
I.1 52.252-2 Clauses Incorporated by Reference I-1
I.2 52.204-30 Federal Acquisition Supply Chain Security Act Orders – Prohibition
Alt II
I.4
I.3 52.216-18 Ordering I.8
I.4 52.216-19 Order Limitations I.9
I.5 52.216-22 Indefinite Quantity I.9
I.6 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction
I.10
I.7 52.222-35 Equal Opportunity for Veterans I-11
I.8 52.222-36 Equal Opportunity for Workers with Disabilities I-11
Project Title ii
I.9 52.225-9 Buy American - Construction Materials I-11
I.10 52.228-1 Bid Guarantee I-16
I.11 52.228-13 Alternative Payment Protections I-16
I.12 52.244-6 Subcontracts for Commercial Items I.13
I.13 52.252-6 Authorized Deviations in Clauses I-17
I.14 1452.228-70 Liability Insurance - Department of the Interior I-19
I.15 1452.201-80 Contracting Officer’s Representative’s Authorities and
Limitations -- Bureau of Reclamation
I-19
I.16 1452.223-80 Asbestos-Free Warranty - Bureau of Reclamation I-21
I.17 1452.223-81 Safety and Health - Bureau of Reclamation I-21
I.18 1452.223-82 Ensuring Adequate COVID-19 Safety Protocols in Federal
Buildings and Federally Controlled Facilities
I-22
I.19 1452.231-81 Equipment Ownership and Operating Expense - Bureau of
Reclamation
I-22
I.20 1452.232-81 Payment for Mobilization and Preparatory Work - Bureau of
Reclamation
I-24
I.21 1452.236-80 Other Contracts (Deviation) I.25
I.22 1452.236-84 Preservation of Cultural Resources - Bureau of Reclamation I-26
I.23 1452.237-80 Security Requirements - Bureau of Reclamation I-27
I.24 1452.243-80 Modification Proposals – Alternate IV - Bureau of Reclamation I-31
I.25 Safety Data Submittal Requirements - Bureau of Reclamation - Lower
Colorado Region
I-32
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - List of Attachments J-1
J.1 Applicability of Documents J-1
J.2 List of Contract Documents J-1
PART IV-REPRESENTATIONS AND INSTRUCTIONS
(This part will be removed after award.)
SECTION K - Representations, Certifications and Other Statements of Offerors K-1
K.1 52.252-1 Solicitation Provisions Incorporated by Reference K-1
K.2 52.204-8 Annual Representations and Certifications K-1
K.3 52.204-24 Representation Regarding Certain Telecommunications and Video
Surveillance Services or Equipment
K-5
K.4 52.204-26 Covered Telecommunications Equipment or Services-
Representation
K-7
K.5 52.204-29 Federal Acquisition Supply Chain Security Act Orders –
Representation and Disclosures
K-8
K.6 52.209-7 Information Regarding Responsibility Matters K-8
K.7 52.209-13 Violation of Arms Control Treaties or Agreements--Certification K-9
SECTION L - Instructions, Conditions and Notices to Offerors L-1
L.1 52.252-1 Solicitation Provisions Incorporated by Reference L-1
L.2 52.211-1 Availability of Specifications Listed in the GSA Index of Federal
Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-
L-1
L.3 52.216-1 Type of Contract L-2
L.4 52.222-5 Construction Wage Rate Requirements—Secondary Site of Work L-2
L.5 52.225-10 Notice of Buy American Requirement - Construction Materials L-2
L.6 52.236-27 Site Visit (Construction) – Alternate I L-3
Project Title iii
L.7 52.252-5 Authorized Deviations in Provisions L-4
L.8 1452.233-02 Service of Protest L-4
L.9 1452.215-80 Source Selection Evaluation Procedures - Bureau of Reclamation L-4
L.10 1452.215-81 Proposal Instructions -- Bureau of Reclamation L-5
L.11 1452.233-82 Notice of Proposed Partnering - Bureau of Reclamation L-13
L.12 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line
Item - Bureau of Reclamation
L-14
SECTION M - Evaluation Factors for Award M-1
M.1 1452.215-82 Evaluation for Award -- Quality Predominance -- Bureau of
Reclamation
M-1
Project Title iv
This page left intentionally blank
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Bureau of Reclamation
Lower Colorado Region
Regional Office 500 Fir Street
R30
Boulder City NV 89005
Ronald (scott) Pringle 7022938569
1x
140R3024R0003
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Structural Steel and Piping Repair and Replacement for Hoover Dam
-IDIQ.
Proposals can be sent to: See Foreword section of the solicitation.
Estimated Price Range - Each IDIQ Contract: Each IDIQ Contact: More than
$10,000,000. Estimated Price Range - Task Order 1, N1 Cooling Rings: Between
$1,000,000.00 and $5,000,000.00.
NAICS Code: 237110 Water and Sewer Line and Related Structures Construction
Full and Open Competition (Unrestricted)
Reference block 13.a. of this form - See Solicitation section L.13(b) for the number of copies of each proposal volume to be furnished.
Reference Blocks 11&12 of this form - Requirements are to be specified at the task order level. Each base IDIQ contract award will have an ordering period of five
(5)years from the date of award, with a cumulative/maximum amount of all task orders.
Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 0 calendar days and complete it within ________________ ________________ calendar days after receiving
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
5/23/2024
06/25/2024
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Luis Gallardo
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R3024R0003
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Project Title
Section B – Supplies or
Services and Prices/Costs
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
IDIQ
Page B-1
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 THE REQUIREMENT
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section
L.9. Failure to comply with these requirements may result in a proposal being determined unacceptable.
(d) Offerors shall complete the schedule(s) in Section B and Request for Proposals, SF-1442.
(e) The quantities stated in the Schedule(s), other than those identified as "lump sum," are estimated quantities for evaluation of offers, and no claim shall be made against the Government for variations in the quantities stated.
(f) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for
Mobilization and Preparatory Work Schedule Line Item.”
B.2 PRICE SCHEDULE
Price schedules will be included within each Task Order.
*** To be determined on individual task order
NOTE: In lieu of completing the Schedule above for IDIQ contract award price evaluation/consideration, offerors must complete and submit the Price Schedules Attachment 04 for Task Order 1. See solicitation
Section L.9 for pricing proposal instructions and solicitation Section M.1 for discussion of Price as an evaluation factor.
Attachment 2 Fixed Price Schedules
Item No. Schedule of
Supplies/Services
Quantity Estimated
Quantities
Unit of
Measure
Unit Price Extended
Amount
*0001 *TBD *TBD *TBD *TBD *TBD *TBD
*0002 *TBD *TBD *TBD *TBD *TBD *TBD
*0003 *TBD *TBD *TBD *TBD *TBD *TBD
*0004 *TBD *TBD *TBD *TBD *TBD *TBD
*0005 *TBD *TBD *TBD *TBD *TBD *TBD
*0006 *TBD *TBD *TBD *TBD *TBD *TBD
Total for Schedule *TBD
Section B – Supplies or
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page B-2
Section C – Supplies or
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page C-1
SECTION C – DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
C.1 STATEMENT OF WORK/SPECIFICATIONS
The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities
(except as otherwise specified) to perform the requirement specified in the Statement of Work, Specifications, Drawings and Photographs contained in Attachment Nos. 1 – 10 of this solicitation.
Section C – Description and Specifications
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page C-2
This page intentionally left blank.
Section D – Packaging and Marking
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page D-1
SECTION D – PACKAGING AND MARKING
(There is no additional information in this section)
Section D – Packaging and Marking
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page D-2
Section E – Inspection and Acceptance Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition
Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date
52.246-12 Inspection of Construction AUG 1996 https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/diar
Section E – Inspection and Acceptance Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page E-2
Section F – Deliveries or
Performance
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior
Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract.
52.211-13 Time Extensions SEP 2000
52.211-18 Variation in Estimated Quantity APR 1984
52.242-14 Suspension of Work APR 1984
52.247-34 F.O.B Destination NOV 1991
The Variation in Estimated Quantity clause shall be applicable to the estimated quantities in the price schedule of any task orders issued under this contract.
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK
APR 1984
The Contractor shall be required to (a) commence work under this contract within (TBD FOR EACH
TASK ORDER) after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (TBD EACH
INDIVIDUAL TASK ORDER). The time stated for completion shall include final cleanup of the premises.
F.3 TASK ORDER ISSUANCE PROCEDURES
(a) General. Task Orders will be issued under this contract in the form and manner set forth below.
(1) Task orders will be issued on a Firm-Fixed-Price basis.
(2) Work under this contract will be ordered by individual orders issued on Standard Form 1442 to the Contractor by any Interior Region 8 Lower Colorado Basin Contracting Officer having the appropriate warrant authority. In the case of an urgent requirement, the Contracting Officer may issue written notice to the Contractor to begin immediate work under a task order. Task Orders may include drawings and Statement of Work.
(b) Order Placement Procedures.
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page F-2
(1) The Government will issue a written request for proposal (RFP) electronically via e-mail which will include the proposed Statement of Work (SOW), drawings, maps (if applicable), pricing schedule(s) and any other submission instruction, including the due date for receipt of proposals. All other terms and conditions will be contained in the basic contract. However, any minor/pertinent changes to these terms and conditions, including applicable fill-ins for certain clauses and additional contract direction or details specifically pertaining to the task order, will also be identified in the RFP and incorporated into the individual task order. Contractor must acknowledge receipt of each RFP.
(2) A proposal shall not include any terms and conditions that would conflict with the contract terms and conditions; otherwise, the proposal may be considered non-responsive and rejected without further consideration.
(3) Each RFP will state whether the contractor’s proposal is to be submitted as a lump sum price or whether the proposal price is to include a detailed cost breakdown for evaluation. The lump sum price shall include the contractor’s best price for the item(s) including all applicable costs such as, but not limited to, cost of subcontractors, cost of miscellaneous equipment, materials, services, G&A, overhead, reasonable profit, and shipping (FOB Destination). In those instances where a detailed cost breakdown is required, the contractor’s price proposal shall identify the proposed quantity and type of labor, labor rates, material and equipment, shipping (FOB
Destination), G&A, overhead, and a reasonable profit estimated for the type and complexity of the work required under the individual proposed delivery/task order. Estimated travel-related costs, if applicable, should also be provided in the proposal price. Payment for travel-related costs will be reimbursed based on allowable costs in accordance with the Federal Travel Regulations.
Maximum lodging and per diem rates are identified at http://www.gsa.gov.
(4) All provisions and clauses included in this solicitation and resulting IDIQ contract will apply to RFPs for resulting Task orders, unless otherwise noted on a task order basis. Additional contract clauses may be inserted into the task order as applicable for the work ordered. The notice for each Task Order will provide any required "fill-ins" for provisions and clauses and other specific information/direction pertaining to the task order, including, but not limited to:
• Magnitude of construction/estimated price range (FAR36.204).
• Details regarding Commencement, Prosecution, and Completion of Work (reference FAR
Clause 52.211-10).
(d) Other Ordering Requirements.
(1) Labor standards for contracts involving construction (Construction Wage Rate Requirements) are applicable to individual task order requirements. Pricing for the IDIQ is based on the wage determination attached to the RFP. In the event a work site differs, the applicable wage determination will be included in the RFP for that specific task order and a price adjustment may be requested, in accordance with the applicable clause.
(2) Bonding requirements. Reference solicitation Section I for FAR Clause 52.228-15, Performance and Payment Bonds – Construction, and FAR Clause 52.228-1, Bid Guarantee. Bid Bond, Performance Bond and Payment Bond forms are attached at solicitation/contract Section J, List of
Attachments.
http://www.gsa.gov/
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page F-3
(3) Certified Payroll Reports. For each task order issued, the awardee shall be required to furnish weekly certified payrolls (prime and subcontractor) in accordance with Contract Clause I.1, FAR
Clause 52.222-8, Payrolls and Basic Records. Funds will be retained by the Government from progress payments until all payroll reports are submitted.
(4) Release of Claims. Reference Contract Clause 1452.204-70, Release of Claims. For each order issued, the awardee shall be required to furnish a Release of Claims prior to final payment.
(5) Insurance. Reference Contract Clause WBR 1452.228-70, Liability Insurance – Department of the Interior. The contractor is required to procure and maintain liability insurance during the term of the contract. It is the responsibility of the contractor to provide updated insurance certificates when insurance policies expire.
(6) Competition in Subcontracting. The contractor shall select subcontractors (including suppliers) on a competitive basis to the maximum practical extent consistent with the objectives and requirements of the contract.
(e) Minimum Guarantee. The Government will order, and the contractor shall furnish services costing the Government at least $2,500.00 during the five (5) -year IDIQ contract ordering period.
(f) Monetary Limitations. The cumulative/maximum amount of all task orders shall not exceed
$11,000,000.00.
(g) Limitations on Subcontracting (LOS). In accordance with FAR 52.219-14, Limitations on
Subcontracting, the Contractor shall submit an LOS for each task order expected to exceed $250,000.00.
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page F-4
This page intentionally left blank
Section G – Contract
Administration Data
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page G-1
SECTION G – CONTRACT ADMINSTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS-
DEPARTMENT OF THE INTERIOR
SEPT 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The
COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The
Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the
COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the
Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting
Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page G-2
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.2 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S
AUTHORITIES AND LIMITATIONS--BUREAU OF
RECLAMATION
MAY 2018
(a) Performance of the work under this contract shall be subject to the technical direction of the
Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the
Contractor on all technical matters relating to the contract. The COR will supervise or oversee all
Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting
Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the
COR in the manner prescribed by this clause and within its authority under the provisions of this clause.
If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page G-3 direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
G.3 DOI-AAAP-0028 V3 ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS – INTERNET PAYMENT
PLATFORM (IPP)
APR 2013
Payment requests must be submitted electronically through the U. S. Department of the Treasury's
Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the
Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4
Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: NONE
However, the contractor must submit an electronic copy of the IPP invoice along with copies of certified payroll to the Contract Specialist at rpringle@usbr.gov for approval before the invoice is submitted into IPP.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4 DOI-AAAP-0050 V3 NOTICE TO CONTRACTORS—CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING
SYSTEM
DEC 2015
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts.
The Department of the Interior (DOI) has implemented the Contractor Performance Assessment https://www.ipp.gov/ https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page G-4
Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for
Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the
Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date).
The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page G-5
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
G.5 WBR 1452.242-80 POSTAWARD CONFERENCE - BUREAU OF RECLAMATION JUL 1993
(a) Prior to the Contractor starting work, a post award conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project
Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the requirement. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.
(c) The Contractor shall include any associated costs for attendance at the conference in its offer.
G.6 CONTRACTOR’S ADMINISTRATION PERSONNEL
Name: _____________________________
Address: ____________________________
City/State/Zip: _______________________
Telephone No.: ______________________
Fax No.: ____________________________
Email: _____________________________
Contractor must complete and submit with proposal.
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page G-6
Section H – Special
Contract Requirements
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
(There is no additional information in this section.)
Section H – Special
Contract Requirements
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page H-2
Section I – Contract
Clauses
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page I-1
SECTION I – CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior
Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract:
52.202-1 Definitions JUN 2020
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions on Subcontractor Sales to the Government JUN 2020
52.203-7 Anti-Kickback Procedures JUN 2020
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity MAY 2014
52.203-12 Limitation on Payments to Influence Certain Federal Transactions JUN 2020
52.203-13 Contractor Code of Business Ethics and Conduct JUN 2020
52.203-14 Display of Hotline Poster(s) JUN 2020
52.203-17 Contractor Employee Whistleblower Rights NOV 2023
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018
52.204-14 Service Contract Reporting Requirements OCT 2016
52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on ByteDance Covered Application JUN 2023
52.209-6 Protecting the Government's Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility
Matters
OCT 2018
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015
52.210-1 Market Research NOV 2021
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page I-2
52.215-2 Audit and Records--Negotiation JUN 2020
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
AUG 2011
52.215-12 Subcontractor Cost or Pricing Data JUN 2020
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications JUN 2020
52.215-18 Reversion or Adjustment for Plans for Postretirement Benefits Other than Pensions
JULY 2005
52.215-19 Notification of Ownership Changes OCT 1997
52.215-21 Alt IV Requirements for Certified Cost or Pricing Data and Data Other Than
Certified Cost or Pricing Data--Modifications - Alternate IV (Oct
2010)
NOV 2021
52.219-8 Utilization of Small Business Concerns SEP 2023
52.219-9 Alt II Small Business Subcontracting Plan – Alternate II (NOV 2016) SEP 2023
52.219-16 Liquidated Damages-Subcontracting Plan SEP 2021
52.219-28 Post-Award Small Business Program Rerepresentation SEP 2023
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation MAY 2018
52.222-6 Construction Wage Rate Requirements AUG 2018
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records JUL 2021
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination--Debarment MAY 2014
52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition of Segregated Facilities APR 2015
52.222-26 Equal Opportunity SEP 2016
52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015
52.222-34 Project Labor Agreement MAY 2010
52.222-37 Employment Reports on Veterans JUN 2020
52.222-40 Notification of Employee Rights Under the National Labor Relations
Act
DEC 2010
52.222-50 Combating Trafficking in Persons OCT 2020
52.222-54 Employment Eligibility Verification OCT 2015
52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017
52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts
SEP 2013
52.223-3 Alt I Hazardous Material Identification and Material Safety Data (Jan 1997)
- Alternate I (Jul 1995)
FEB 2021
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-9 Estimated of Percentage of Recovered Material Content for EA MAY 2008
Solicitation No.
140R3024R0003
Project Title
Structural Steel and Piping Repair
Page I-3
Designated Items Alt I (May 2008)
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and
Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While
Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021
52.227-1 Authorization and Consent JUN 2020
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement JUN 2020
52.227-4 Patent Indemnity--Construction Contracts DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-5 Insurance--Work on a Government Installation JAN 1997
52.228-11 Individual Surety - Pledges of Assets FEB 2021
52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014
52.228-14 Irrevocable Letter of Credit NOV 2014
52.228-15 Performance and Payment Bonds--Construction JUN 2020
52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) FEB 2021
52.229-3 Federal, State, And Local Taxes FEB 2013
52.230-2 Cost Accounting Standards JUNE 2020
52.232-5 Payments Under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-23 Assignment of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts JAN 2017
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business Subcontractors MAR 2023
52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991) MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .