SEGMENT: 02 PERFORM LOAD BANK NOTES:MAKE: KOHLER MODEL: 150REOZJF S/N: SGM32CWVS UNIT: GEN 2 SIZE… and 8 more items
State & local contract award Virginia Awarded
- Contract number
- PO05424542
- Awardee
- Carter Machinery Company Inc
- Contracting organization
- Lawrenceville Correctional Center
- Cumulative value
- $10,320
About this award
Carter Machinery Company Inc. was awarded a contract by Lawrenceville Correctional Center in Virginia on July 30, 2026, with a cumulative value of $10,319.50. The contract encompasses load bank testing services for eight generator units of varying capacities, including six Kohler-manufactured generators (ranging from 60 kilowatts to 150 kilowatts), one Detroit-manufactured 250-kilowatt generator, and associated environmental consumables. Each load bank test segment includes technician labor consisting of one hour connection time, four hours of load bank testing, and one hour disconnection time billed at $174.00 per hour, along with load bank charges calculated at $1.50 per kilowatt and trip charges of $100.00 per segment. All deliverables are designated for warehouse receipt.
The contract represents a time and materials arrangement for generator maintenance and testing services to ensure operational readiness of the facility's backup power systems. The testing procedures are standardized across most segments with consistent labor rates and trip fees, while load bank charges vary based on generator size specifications. No specific period of performance is documented in the contract award information provided, though the July 30, 2026 award date establishes the contract initiation.
Line items
| Item | Total |
|---|---|
| SEGMENT: 02 PERFORM LOAD BANK NOTES:MAKE: KOHLER MODEL: 150REOZJF S/N: SGM32CWVS UNIT: GEN 2 SIZE: 150KW Labor Description Ext Price EPG TECHNICIAN - NORMAL TIME 1,044.00 Total Time and Material Labor: Labor Summary 1 Hour Connect - 4 Hour LB Test - 1 Hour Disconnect at $174.00/hr Misc Description… | $1,369.00 |
| SEGMENT: 04 PERFORM LOAD BANK NOTES:MAKE: KOHLER MODEL: 150ROZ171 S/N: 3899965 UNIT: GEN 4 SIZE: 150KW Labor Description Ext Price EPG TECHNICIAN - NORMAL TIME 1,044.00 Total Time and Material Labor: Labor Summary 1 Hour Connect - 4 Hour LB Test - 1 Hour Disconnect at $174.00/hr Misc Description… | $1,369.00 |
| SEGMENT: 05 PERFORM LOAD BANK NOTES:MAKE: KOHLER MODEL: 80ROZ171 S/N: 389754 UNIT: GEN 5 SIZE: 80KW Labor Description Ext Price EPG TECHNICIAN - NORMAL TIME 1,044.00 Total Time and Material Labor: Labor Summary 1 Hour Connect - 4 Hour LB Test - 1 Hour Disconnect at $174.00/hr Misc Description… | $1,264.00 |
| SEGMENT: 03 PERFORM LOAD BANK NOTES:MAKE: KOHLER MODEL: 60ROZ171 S/N: 389794 UNIT: GEN 3 SIZE: 60KW Labor Description Ext Price EPG TECHNICIAN - NORMAL TIME 1,044.00 Total Time and Material Labor: Labor Summary 1 Hour Connect - 4 Hour LB Test - 1 Hour Disconnect at $174.00/hr Misc Description… | $1,234.00 |
| SEGMENT: 06-PERFORM LOAD BANK KOHLER MODEL: 135RO2171 S/N: 389746-UNIT: GEN 6 SIZE: 1355KW Description Ext Price EPG TECHNICIAN - NORMAL TIME 1,044.00 Total Time and Material Labor: 1,044.00 Labor Summary 1 Hour Connect - 4 Hour LB Test - 1 Hour Disconnect at $174.00/hr Misc Description Ext Price… | $1,346.50 |
| SEGMENT: 07-PERFORM LOAD BANK DETROIT MODEL: 250DSE-S/N: 0761940-UNIT: GEN 7 SIZE:250KW Labor Description Ext Price LOAD BANK - 250KW 764.00 Total Time and Material Labor: 764.00 Misc Description Ext Price TRIP CHARGE 100.00 Total Time and Material Misc: 100.00 Segment 07 Total: 864.00 | $864.00 |
| SEGMENT: 01 PERFORM LOAD BANK NOTES:MAKE: KOHLER MODEL: 150ROZ17 S/N: 389749 UNIT: GEN 1 SIZE: 150KW Labor Description Ext Price EPG TECHNICIAN - NORMAL TIME 1,044.00 Total Time and Material Labor: Labor Summary 1 Hour Connect - 4 Hour LB Test - 1 Hour Disconnect at $174.00/hr Misc Description… | $1,369.00 |
| KOHLER-MODEL: 60REOZJD-S/N: SGM326RPG UNIT: GEN 8-SIZE: 60KW Labor Description Ext Price-EPG TECHNICIAN - NORMAL TIME 1,044.00-Total Time and Material Labor: 1,044.00 Labor Summary1 Hour Connect - 4 Hour LB Test - 1 Hour Disconnect at $174.00/hr Misc Description Ext Price LOAD BANK CHARGE @ $1.50/KW… | $1,234.00 |
| EN5 - environmental consmables charg | $270.00 |
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05424542?
Contract PO05424542 was awarded to Carter Machinery Company Inc by Lawrenceville Correctional Center in Virginia on July 30, 2026.
How much is contract PO05424542 worth?
Its cumulative value is $10,320.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award