Crawler excavator, 153 HP, 51000 operating weight, w/operator and 15 more items

State & local contract award Virginia Awarded

Contract number
PO05419915-V2
Awardee
F & B Contractors Ltd
Contracting organization
Virginia Department of Transportation
Cumulative value
$90,737

About this award

F & B Contractors Ltd has been awarded contract PO05419915-V2 by the Virginia Department of Transportation effective August 4, 2026. The cumulative contract value is $90,736.80, with all services to be delivered to Spangler, Renee Rorrer in Virginia. The contract encompasses the provision of heavy equipment and skilled labor services on an hourly and daily basis, including crawler excavators, loaders, tractor/lowboy trailers, soil tampers, and specialized machinery such as skid steer loaders and mid-size excavators, all with operators.

The scope of work further includes support equipment and ancillary services such as water pumps, air compressors, generators, and dump trucks with operators, as well as skilled laborer/operator services totaling 220 hours. Pricing is established on a per-hour basis for most line items, with select water pump services billed on a daily rate. The line items aggregate to reflect equipment utilization ranging from 10 to 220 hours or days, indicating a project-based service delivery model typical of transportation infrastructure work performed by the Virginia Department of Transportation.

Line items

Item Total
Crawler excavator, 153 HP, 51000 operating weight, w/operator 80 Hour × $136.32 $10,905.60
Loader, rubber tire, 110HP plus, w/2-YD bucket, w/operator 80 Hour × $98.15 $7,852.00
Tractor/lowboy trailer, 35 ton minimum, w/operator 10 Hour × $163.59 $1,635.90
Soil tamper w/11" shoe w/operator 20 Hour × $49.08 $981.60
Pick-up truck w/foreman, equipment w/amber light 80 Hour × $98.15 $7,852.00
Saw/concrete/metal, portable, w/operator 80 Hour × $49.08 $3,926.40
Air compressor, 150 CFM, shall operate 90 LB jack hammer and other air tools, w/operator 80 Hour × $59.98 $4,798.40
Water pump, 1 1/2 to 3", w/suction hose and discharge hose, each per day 10 Day × $81.79 $817.90
Skilled laborer/operator 220 Hour × $54.53 $11,996.60
Water pump, 6", w/suction hose and discharge 80 Hour × $109.06 $8,724.80
Trench/bulldog roller, min 20 inch width w/operator 120 Hour × $70.89 $8,506.80
Skid steer loader, bobcat S220 or equivalent, 75 HP min. Plus attachment to include milling head w/operator 80 Hour × $98.15 $7,852.00
Tandem/TRI-axle dump truck w/operator, 50,000 LB min. Capacity 40 Hour × $98.15 $3,926.00
Mid-size excavator, 55 HP min., 18,000 LB operating weight, w/hydraulic thumb, to include rock breaker w/operator 80 Hour × $109.06 $8,724.80
Generator, minmum 3500 watts 80 Hour × $10.91 $872.80
Water pump, 4", w/suction hose and discharge hose, each per day 10 Day × $136.32 $1,363.20
Show all 16

Award details come from logi.cgieva.com. Updated .

Quick answers

Who was awarded contract PO05419915-V2?

Contract PO05419915-V2 was awarded to F & B Contractors Ltd by Virginia Department of Transportation on August 4, 2026.

How much is contract PO05419915-V2 worth?

Its cumulative value is $90,737.

On GovTribe

See this award's full record

  • Every line item and file
  • The contract it was ordered under and its other orders
  • Similar state and local awards and opportunities
  • Ask GovTribe AI about this award