Mobilization Maximum of no greater than 5% of total base bid amount and 19 more items
State & local contract award Virginia Awarded
- Contract number
- PO05407385-V2
- Awardee
- S&S CONTRACTORS INC
- Contracting organization
- Virginia Department of Energy
- Cumulative value
- $664,605
About this award
S&S Contractors Inc. has been awarded contract PO05407385-V2 by the Virginia Department of Energy on September 23, 2026, for a cumulative value of $664,605.00. The contract encompasses a comprehensive site remediation and restoration project to be performed in Virginia with deliverables directed to Jennifer Dillemuth. The scope of work includes mobilization and site preparation activities, installation of erosion control measures (silt fence), and significant earthwork operations comprising point cut-through backfill (17,000 cubic yards), pit backfill (10,000 cubic yards), and highwall miner area backfill (500 cubic yards).
The contract further encompasses water resource management and environmental restoration services, including construction and restoration work on multiple pond areas (Ponds 5, 6A, 7, 9, and 10), wetland restoration and revegetation activities across designated acreage, and general site reforestation totaling 30 acres. Ancillary services include surveying activities to determine material requirements for highwall elimination, pre-construction and post-construction surveys, procurement and delivery of stone materials (Virginia Department of Transportation No. 57 stone, No. 2 stone, and crusher run stone), and administrative support. The contract does not specify a defined period of performance or annual value separate from the cumulative contract amount.
Line items
| Item | Total |
|---|---|
| Mobilization Maximum of no greater than 5% of total base bid amount | $28,500.00 |
| Site Preparation | $15,600.00 |
| Silt Fence (Installed) | $16,075.00 |
| Point Cut-Through Backfill (17,000 Cubic Yards) | $193,500.00 |
| Highwall Miner Area Backfill (500 cubic yards) | $13,450.00 |
| VDOT No. 57 Stone | $21,600.00 |
| VDOT No. 2 Stone | $3,700.00 |
| Pond 7 | $24,700.00 |
| Pond 9 | $26,750.00 |
| Pond 10 | $66,375.00 |
| Wetland Restoration | — |
| Wetland Restoration Revegetation | — |
| Revegetation | $76,950.00 |
| Pit Backfill (10,000 cubic yards) | $127,250.00 |
| Survey to determine the quantity of material required for highwall elimination. | $6,500.00 |
| Pre-Construction and Post-Construction Survey | $3,000.00 |
| Administrative Time | $375.00 |
| VDOT Crusher Run Stone | $3,600.00 |
| Pond 5 Area Regrade | $3,800.00 |
| Pond 6A | $17,200.00 |
Show all 20
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05407385-V2?
Contract PO05407385-V2 was awarded to S&S CONTRACTORS INC by Virginia Department of Energy on September 23, 2026.
How much is contract PO05407385-V2 worth?
Its cumulative value is $664,605.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award