Richmond - Mobilization and Demobilization (excluding water truck) and 328 more items
State & local contract award Virginia Awarded
- Contract number
- PO05395154-V3
- Awardee
- DMY Engineering Consultants Inc
- Contracting organization
- Virginia Department of Transportation
- Cumulative value
- $437,270
About this award
DMY Engineering Consultants Inc. has been awarded contract PO05395154-V3 by the Virginia Department of Transportation with a cumulative value of $437,270.44, effective August 31, 2026. The contract encompasses geotechnical and pavement testing services to be performed across multiple Virginia regions, including Richmond, Northern Virginia (NoVA), Lynchburg, Hampton, Fredericksburg, Culpeper, Bristol, Salem, and Staunton. Services will be delivered to Veronica N. Hendricks at designated locations within each region.
The contract specifications include an extensive array of subsurface investigation and materials testing services. Geotechnical work encompasses soil boring operations using hollow-stem augers of varying diameters (2.25-inch, 3.25-inch, and 4.25-inch), standard penetration testing, undisturbed soil sampling, rock coring, piezometer installation, and laboratory soil classification and analysis per ASTM standards. Additionally, the contract covers pavement evaluation services including asphalt and concrete coring and patching, traffic control operations on primary, secondary, and interstate roadways at varying work hour rates, site restoration, and Virginia Texture Meter (VTM-1 and VTM-8) laboratory testing. Mobilization and demobilization costs, authorized standby time, and asbestos surveillance services are also included in the contract scope.
Line items
| Item | Total |
|---|---|
| Richmond - Mobilization and Demobilization (excluding water truck) | $3.12 |
| Richmond - Mobilization and Demobilization Water Truck | $3.12 |
| Richmond - Soil Boring Hollow Stem 2 1/4-inch ID | $41.52 |
| Richmond - Soil Boring Hollow Stem 3 1/4-inch ID | $4,152.00 |
| Richmond - Below Bridge Deck Drilling (footage from deck to ground) | $5.19 |
| Richmond - Soil Boring Hollow Stem 4 1/4-inch ID | $41.52 |
| Richmond - Mud Rotary Drilling | $41.52 |
| Richmond - Casing Advancement | $41.52 |
| Richmond - SPT Sampling 0 - 50 ft | $41.52 |
| Richmond - Undisturbed Sampling - Cohesive Soil | $155.70 |
| Richmond - SPT Sampling > 50 ft | $41.52 |
| Richmond - N-Sized Rock Coring | $155.70 |
| Richmond - Bulk Sampling - 75 lbs | $103.80 |
| Richmond - Bulk Sampling - 120 lbs | $103.80 |
| Richmond - Simple Piezometer - 10 ft | $155.70 |
| Richmond - Simple Piezometer - additional riser beyond 10 ft | $15.57 |
| Richmond - Piezometer Cover | $155.70 |
| Richmond - Water Content (ASTM D2216) | $31.14 |
| Richmond - Soil Classification (D2487) using D422 Mechanical Analysis only | $83.04 |
| Richmond - Atterberg Limits (D4318) | $83.04 |
| Richmond - Soil Classification (D2487) using Mechanical Analysis and Hydrometer (D422) | $103.80 |
| Richmond - Oven-Dried Liquid Limit (D4318) | $83.04 |
| Richmond - Asphalt Coring (per inch depth for 4-in diameter) | $6,067.11 |
| Richmond - Asphalt Patching (per location) | $1,245.60 |
| Richmond - Primary/Secondary Traffic Control: Regular Work Hours, 4-hr minimum | $10,380.00 |
| Richmond - Interstate Traffic Control: Regular Work Hours, 4-hr minimum | $10,380.00 |
| Richmond - Primary/Secondary Traffic Control: Regular Work Hours, Per Hour in Addition to 4-hr Minimum | $6,228.00 |
| Richmond - Interstate Traffic Control: Regular Work Hours, Per Hour in Addition to 4-hr minimum | $6,228.00 |
| Richmond - Primary/Secondary Traffic Control: Non-Regular Surcharge, per hour | $1,557.00 |
| Richmond - Interstate Traffic Control: Non-Regular Surcharge, Per Hour | $1,557.00 |
| Richmond - Concrete Patching (per location) | $62.28 |
| Richmond - Concrete Coring (per inch depth x per inch diameter) | $12.46 |
| Richmond - Site Restoration | $1,297.50 |
| VTM-1 Laboratory Testing | $155.70 |
| VTM-8 Laboratory Testing | $311.40 |
| Richmond - Authorized StandbyTime | $1,557.00 |
| NoVA - Mobilization and Demobilization (excluding water truck) | $5.20 |
| NoVA - Soil Boring Hollow Stem 2 1/4-inch ID | $29,064.00 |
| NoVA - Mobilization and Demobilization Water Truck | $5.20 |
| NoVA - Soil Boring Hollow Stem 3 1/4-inch ID | $29,064.00 |
| NoVA - Below Bridge Deck Drilling (footage from deck to ground) | $5.19 |
| NoVA - Soil Boring Hollow Stem 4 1/4-inch ID | $41.52 |
| NoVA - Mud Rotary Drilling | $41.52 |
| NoVA - Casing Advancement | $41.52 |
| NoVA - SPT Sampling 0 - 50 ft | $16,608.00 |
| NoVA - SPT Sampling > 50 ft | $1,245.60 |
| NoVA - N-Sized Rock Coring | $21,798.00 |
| NoVA - Undisturbed Sampling - Cohesive Soil | $155.70 |
| NoVA - Bulk Sampling - 120 lbs | $103.80 |
| NoVA - Bulk Sampling - 75 lbs | $2,076.00 |
Show 40 more
First 50 of 329 listed here. See the rest on GovTribe.
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05395154-V3?
Contract PO05395154-V3 was awarded to DMY Engineering Consultants Inc by Virginia Department of Transportation on August 31, 2026.
How much is contract PO05395154-V3 worth?
Its cumulative value is $437,270.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award