1 TON PICK UP w/OPERATOR and 21 more items

State & local contract award Virginia Awarded

Contract number
PO05377277
Awardee
Randy Hostetter Excavating LLC
Contracting organization
Virginia Department of Transportation
Cumulative value
$585,707

About this award

Randy Hostetter Excavating LLC was awarded contract PO05377277 by the Virginia Department of Transportation on July 13, 2026, with a cumulative contract value of $585,707.45. Performance is directed to Carroll, Devin Curtis. The contract encompasses the provision of equipment and labor services for excavation and site preparation work, including both skilled and unskilled labor resources at hourly rates ranging from $71.93 to $174.54 per hour.

The contract line items specify delivery of heavy equipment with experienced operators, including excavators (315 and 308/9 models), track dozers, motor graders, dump trucks (both tandem and standard configurations), skid steers, rollers, and specialized equipment such as straw blowers and water pumps. Labor services include skilled laborers, unskilled laborers, and foreman-supervised crews utilizing various pickup truck configurations. The contract also includes provisions for contractor-furnished materials and ancillary equipment such as trench boxes. Total billable hours encompass approximately 4,873 hours of equipment and labor services across the multiple line items, with quantities measured in both hours and days as appropriate to each service category.

Line items

Item Total
1 TON PICK UP w/OPERATOR 150 Hour × $84.62 $12,693.00
3/4 Ton Pick up W/OPERATOR 150 Hour × $84.62 $12,693.00
3/4 Ton Pick up wForeman. 400 Hour × $84.62 $33,848.00
Skilled Laborer 200 Hour × $79.34 $15,868.00
Unskilled Laborer 1,000 Hour × $71.93 $71,930.00
Tractor/lowboy trailer, 35 ton min w/experienced operator 40 Hour × $142.80 $5,712.00
Trench/bulldog roller, min 30 inch width w/experienced operator. 100 Hour × $74.05 $7,405.00
Chainsaw, min 16 inch to 20 inch blade with experience operator 20 Hour × $100.49 $2,009.80
Saw/concrete/metal/asphalt handheld w/ experienced operator 40 Hour × $74.05 $2,962.00
Dump truck, tandem, rock bed w/ experienced opertor, min 50000 LBS 300 Hour × $126.94 $38,082.00
Flatbed pull-behind trailer, min 10 ton capacity with tow vehicle 40 Hour × $142.80 $5,712.00
Straw blower Finn Model B70 or Equivalent W/operator 20 Hour × $158.67 $3,173.40
Dump truck, tandem, w/experienced operator, min 50000 LBS 1,000 Hour × $126.94 $126,940.00
80HP Skid Steer, 2500 LB OPERATOR CAPACITY, WITH BUCKET, BROOM, FORKLIFT AND MILLING ATTACHMENTS w/Experience Operator 250 Hour × $132.23 $33,057.50
WATER PUMP - 2in MIN 125 GPM W/ SUCTION AND DISCHARGE HOSES (DAY EQUALS UP TO 24 HOURS) 17 Day × $158.67 $2,697.39
Track dozer, min 85 HP w/experienced operator 250 Hour × $132.23 $33,057.50
Trench Box, size determined by work assignment (Day equals 24 hours) 6 Day × $211.56 $1,269.36
Cat CB-224E or Similar Smooth Drum Roller with experienced operator 250 Hour × $89.91 $22,477.50
Motorgrader, 135HP plus, w/scarifier, w/experienced operator 300 Hour × $132.23 $39,669.00
Excavator 315 - 32,590 lbs Min 94 HP or Equivalent W/Experienced operator 250 Hour × $174.54 $43,635.00
Excavator 308/9 w/Thumb, 20,000 lb, 69HP, High Flow 400 Hour × $174.54 $69,816.00
Contractor Furnished Materials per IV.B. 1 Each × $1,000.00 $1,000.00
Show all 22

Award details come from logi.cgieva.com. Updated .

Quick answers

Who was awarded contract PO05377277?

Contract PO05377277 was awarded to Randy Hostetter Excavating LLC by Virginia Department of Transportation on July 13, 2026.

How much is contract PO05377277 worth?

Its cumulative value is $585,707.

On GovTribe

See this award's full record

  • Every line item and file
  • The contract it was ordered under and its other orders
  • Similar state and local awards and opportunities
  • Ask GovTribe AI about this award