About this award

Six18 Construction LLC was awarded contract PO05368780-V2 by the Virginia Department of Energy on October 5, 2026, with a cumulative contract value of $409,496.00. The contract is to be performed at a location in Virginia, with deliverables directed to Jennifer Dillemuth. The contract encompasses a comprehensive set of site remediation and construction services related to mine closure and site stabilization activities.

The scope of work includes site preparation services such as mobilization (capped at 10 percent of base bid), clearing, grubbing, site cleanup, and excavation of an estimated 734 bank cubic yards. The contractor is responsible for installing drainage infrastructure, including subdrain systems with 6-inch perforated pipe and 10-inch diameter standard dimensional ratio (SDR)-17 drainage pipe. Additional deliverables include segmental retaining wall construction, safety fencing and bracing, backfilling operations (estimated 164 bank cubic yards), mine portal closures utilizing both dry seal and wet seal methodologies, chain link fencing, pavement installation, driveway upgrading with 21B stone, gabion stone aggregate supply, revegetation activities, silt fencing, and associated disposal and landfill fees for excavated materials.

Line items

Item Total
Mobilization - Maximum limit of no greater than 10% of base bid 1 Each × $30,000.00 $30,000.00
Clearing, Grubbing and Site Cleanup 5 Ton × $70.00 $350.00
Disposal 5 Ton × $70.00 $350.00
Silt Fence 197 linear feet × $3.00 $591.00
Revegetation 1 Acre × $2,000.00 $2,000.00
57 Behind Segmental Retaining Wall and for Subdrain 615 Ton × $35.00 $21,525.00
Subdrain - 6 Inch Perforated 324 linear feet × $15.00 $4,860.00
Excavation (Estimated 734 Bank Cubic Yards) 1 Each × $18,000.00 $18,000.00
Safety Fence and Bracing 77 linear feet × $150.00 $11,550.00
Backfilling (Estimated 164 Bank Cubic Yards) 1 Each × $8,400.00 $8,400.00
Driveway Upgrading (21B Stone) 18 Ton × $35.00 $630.00
Aggregate - Gabion Stone 160 Ton × $35.00 $5,600.00
Disposal Landfill Fee 5 Ton × $70.00 $350.00
8" SDR-17 Pipe 100 linear feet × $43.00 $4,300.00
Dry Seal Mine Portal Closure 1 Each × $7,000.00 $7,000.00
Chain Link Fence 168 linear feet × $30.00 $5,040.00
PVC Pipe 90 linear feet × $30.00 $2,700.00
Segmental Retaining Wall 2,505 × $100.00 $250,500.00
Paving 143 Ton × $250.00 $35,750.00
Drainage Pipe, 10 Inch Diameter SDR-17, including couplers $39.00 per linear feet —
2 Mine Portal Closures (Wet Seal) $7,000.00 each —
Show all 21

Award details come from logi.cgieva.com. Updated .

Quick answers

Who was awarded contract PO05368780-V2?

Contract PO05368780-V2 was awarded to Six18 Construction llc by Virginia Department of Energy on October 5, 2026.

How much is contract PO05368780-V2 worth?

Its cumulative value is $409,496.

On GovTribe

See this award's full record

  • Every line item and file
  • The contract it was ordered under and its other orders
  • Similar state and local awards and opportunities
  • Ask GovTribe AI about this award