Grounds supervisor with pickup truck and 49 more items
State & local contract award Virginia Awarded
- Contract number
- PO05287854-V4
- Awardee
- Gardner Inc.
- Contracting organization
- Virginia Department of Transportation
- Cumulative value
- $3,885,050
About this award
Gardner Inc. was awarded contract PO05287854-V4 by the Virginia Department of Transportation on September 22, 2026, with a cumulative contract value of $3,885,050.00. The contract encompasses the provision of labor services and equipment rental for transportation infrastructure projects, with all deliveries directed to Sean Snead. Labor categories include grounds supervisors, foremen, skilled laborers, and unskilled laborers, billed on an hourly basis at rates ranging from $48 to $65 per hour. The contract also includes an immediate response fee of $1,500 and a materials provision with an estimated cost allowance of $35,000.
Equipment provisions constitute the substantial majority of contract line items and include the rental of hired equipment such as water pumps, pickup trucks, dump trucks, water trucks, and crash cushions, as well as earth-moving equipment including backhoes, loaders, excavators, track dozers, graders, and vibratory rollers. Additional specialized equipment categories encompass tractors with trailers, tiltbed trucks, concrete mixers, soil tampers, trailer-mounted brush chippers, truck-mounted asphalt distributors, and related construction support equipment. Rental rates for equipment range from $20 to $300 per hour or per day, depending on equipment type and specifications established by the Virginia Department of Transportation. The contract structure indicates ongoing provision of services and equipment support for state transportation maintenance and construction operations.
Line items
| Item | Total |
|---|---|
| Grounds supervisor with pickup truck | $32,500.00 |
| Foreman with pickup truck | $168,000.00 |
| Unskilled laborer… | $403,200.00 |
| Skilled laborer | $280,000.00 |
| Hired equipment, per vadot specifications water pumps | $18,000.00 |
| Hired equipment, per vadot specifications water pumps | $16,000.00 |
| Hired equipment, per vadot specifications pick up truck | $90,000.00 |
| Hired equipment, per vadot specifications crash cushion | $30,000.00 |
| Hired equipment, per vadot specifications bucket truck | $30,000.00 |
| Hired equipment, per vadot specifications dump truck | $432,000.00 |
| Tractors, per vadot specs, with trailers | $50,000.00 |
| Hired equipment per vadot specifications pick up truck, type c arrow board | $19,500.00 |
| Hired equipment, per vadot specifications water truck | $12,750.00 |
| Hired equipment, per vadot specifications dump truck | $345,000.00 |
| Hired equipment, per vadot specifications dump truck | $412,500.00 |
| Hired equipment, per vadot specifications dump truck | $135,000.00 |
| Hired equipment, per vadot specifications enclosed emergency trailer | $7,500.00 |
| Earth moving equipment, per vadot specs backhoe | $125,000.00 |
| Earth moving equipment, per vadot specs loader | $175,000.00 |
| Earth moving equipment, per vadot specs, track dozer | $70,000.00 |
| Hired equipment, per vadot specifications, soil tamper / wacker | $6,500.00 |
| Earth moving equipment, per vadot specs, vibratory roller | $18,000.00 |
| Earth moving equipment, per vadot specs, compacting vibratory plate | $6,500.00 |
| Earth moving equipment, per vadot specs, vacuum truck | $45,000.00 |
| Loader/backhoe combination skid steer loader | $47,500.00 |
| Earth moving equipment, per vadot specs, skid steer loader | $50,000.00 |
| Earth moving equipment, per vadot specs, grader | $70,000.00 |
| Hired equipment, per vadot specifications, trailer mounted brush chipper | $15,000.00 |
| Earth moving equipment, per vadot specs, excavator track backhoe | $105,000.00 |
| Earth moving equipment, per vadot specs, excavator track backhoe | $49,500.00 |
| Earth moving equipment, per vadot specs excavator, track backhoe | $40,000.00 |
| Earth moving equipment, per vadot specs, track excavator | $100,000.00 |
| Earth moving equipment, per vadot specs, track excavator | $66,000.00 |
| Concrete mixer | $2,000.00 |
| Earth moving equipment, per vadot specs track excavator | $90,000.00 |
| Immediate response fee | $1,500.00 |
| Earth moving equipment, per vadot specs loader, force feed, athey or equal | $20,000.00 |
| Materials to be invoiced at cost | $35,000.00 |
| Tag-a-long Trailer without truck, minimum 7 ton | $2,000.00 |
| Flagger station overhead light source (balloon lights) | $15,000.00 |
| Contractor owned pre-cast traffic barrier Md-D | $11,600.00 |
| Self-Propelled Chip Spreader minimum 170 HP, 4x4 hydrostaticdrive, w/minimum 11 ft hopper | $15,000.00 |
| Earth moving equipment, per vadot specs excavator, track backhoe | $55,000.00 |
| Earth moving equipment, per vadot specs excavator | $52,500.00 |
| Boom AXE | $37,500.00 |
| Minimum 45CC chain saw | $7,000.00 |
| Tractors, per vadot specs | $15,000.00 |
| Tractors, per vadot specs | $15,000.00 |
| Trucks, hired equipment, per vadot specifications tiltbed | $25,000.00 |
| Truck mounted asphalt distributor, minimum 1,600 gallon, withminimum 12 foot tack bar w/handheld wand | $15,000.00 |
Show all 50
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05287854-V4?
Contract PO05287854-V4 was awarded to Gardner Inc. by Virginia Department of Transportation on September 22, 2026.
How much is contract PO05287854-V4 worth?
Its cumulative value is $3,885,050.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award