Materials - VMI Preston Library EPDM roofing repairs. Job Name: VMI Preston Library - Leak Repairs… and 4 more items
State & local contract award Virginia Awarded
- Contract number
- PO05285281-V3
- Awardee
- SKYLINE ROOFING INC
- Contracting organization
- Virginia Military Institute
- Cumulative value
- $6,770
About this award
SKYLINE ROOFING INC has been awarded contract PO05285281-V3 by Virginia Military Institute in Virginia to perform Emergency Protective Membrane (EPDM) roofing repairs at the VMI Preston Library. The contract was awarded on August 7, 2026, with a cumulative value of $6,770.17. Work is being delivered to Don Hicklin at the Preston Library location.
The scope of work encompasses materials and labor for EPDM roofing leak repairs, with a primary completion date of March 19, 2026. Line items include general materials and labor for roofing repairs ($1,003 and $1,953 respectively), and specialized work involving the removal of an existing roof drain and installation of a new aluminum retrofit drain with a 60-mil EPDM target patch, flashing, and associated terminations ($1,256 materials and $1,176 labor). A change order issued on August 7, 2026, added $1,382.17 in scope to address additional active leaks in the EPDM roofing system located in the sixth-floor gallery area.
Line items
| Item | Total |
|---|---|
| Materials - VMI Preston Library EPDM roofing repairs. Job Name: VMI Preston Library - Leak Repairs Completion Date: 19 March 2026 | $1,003.00 |
| Labor - VMI Preston Library EPDM roofing repairs. Job Name: VMI Preston Library - Leak Repairs Completion Date: 19 March 2026 | $1,953.00 |
| Remove an existing roof drain and related basket and dispose off-site. Install (1) new aluminum retro fit drain into existing drainpipe. Install black 60mil EPDM target patch around newly installed drain, complete with flashing, details and terminations per manufacturer’s specifications. Clean in… | $1,176.00 |
| Remove an existing roof drain and related basket and dispose off-site. Install (1) new aluminum retro fit drain into existing drainpipe. Install black 60mil EPDM target patch around newly installed drain, complete with flashing, details and terminations per manufacturer’s specifications. Clean in… | $1,256.00 |
| CO #2 added 8/7/26. Repairs of active leaks in EPDM in 6th floor gallery area. | $1,382.17 |
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05285281-V3?
Contract PO05285281-V3 was awarded to SKYLINE ROOFING INC by Virginia Military Institute on August 7, 2026.
How much is contract PO05285281-V3 worth?
Its cumulative value is $6,770.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award