DUMP TRUCK, TANDEM, 50,000 minimum, W/OPERATOR and 62 more items

State & local contract award Virginia Awarded

Contract number
PO05162303-V7
Awardee
Ken Construction Co Inc
Contracting organization
Virginia Department of Transportation
Cumulative value
$2,609,001

About this award

Ken Construction Co Inc was awarded contract PO05162303-V7 by the Virginia Department of Transportation on July 17, 2026, with a cumulative contract value of $2.61 million. The contract requires delivery of services to Tiffany A. Canter and encompasses a comprehensive range of heavy equipment rental and labor services for transportation infrastructure projects throughout Virginia.

The contract line items include operator-staffed equipment such as dump trucks (tandem, single axle, and flatbed configurations), excavators (standard track backhoe, long-reach, and hydraulic breaker variants), asphalt pavers, concrete pumps, and specialized vehicles including boom trucks, lowboy trailers, and truck-mounted sweepers. Additional line items provide non-operator equipment rentals including generators, water pumps (3-inch through 12-inch capacity), concrete saws, jack hammers, air compressors, and bridge deck grooving machines. The contract also includes labor services for certified welders, flaggers, laborers/operators, foremen, and certified welder specialists, with quantities measured in hours or days depending on equipment classification. Materials to be invoiced at cost are included at a fixed allowance of $128,000. The pricing structure establishes hourly rates ranging from $9.06 to $453.23 for equipment and labor services, with daily rates up to $2,266.13 for specialized concrete pumping operations.

Line items

Item Total
DUMP TRUCK, TANDEM, 50,000 minimum, W/OPERATOR 500 Hour × $84.98 $42,490.00
Dump truck, 1 ton flat bed, w/operator 800 Hour × $54.39 $43,512.00
Dump truck, single axle, 1 ton minimum, w/operator 150 Hour × $67.98 $10,197.00
BOOM TRUCK, GMC C7500, GVW 31,000 lbs with F110A.22 FASSI Crane, or Equivalent, W/OPERATOR 100 Hour × $141.63 $14,163.00
PICKUP TRUCK, 1/2 or 3/4 ton, W/OPERATOR 5,000 Hour × $45.32 $226,600.00
Lowboy trailer with large truck, w/operator 200 Hour × $147.30 $29,460.00
LOADER, RUBBER TIRE,110 h.p. min., MIN 2 CY BUCKET, W/OPERATOR 50 Hour × $90.65 $4,532.50
Excavator, track backhoe, komatsu 200 or equivalent, w/operator 1,000 Hour × $130.30 $130,300.00
Excavator, track backhoe w/hydraulic breaker, min 35,000 LBS, komatsu or equivalent, w/operator 750 Hour × $169.96 $127,470.00
EXCAVATOR, TRACK BACKHOE W/THUMB for Brush and Limb pickup, KOMATSU 200 OR EQUIVALENT, W/OPERATOR 1,000 Hour × $141.63 $141,630.00
Trackhoe, long reach, 168HP minimum, 60' reach minimum, w/operator 40 Hour × $254.94 $10,197.60
MINI EXCAVATOR, JOHN DEERE 35G or equivalent, 7-8 FT DIGGING DEPTH W/HYDRAULIC THUMB, W/OPERATOR 500 Hour × $92.91 $46,455.00
SKIDSTEER LOADER (Bobcat type)W/ATTACHMENTS, MODEL 840 OR EQUIVALENT, W/OPERATOR 200 Hour × $82.71 $16,542.00
BACKHOE, RUBBER TIRE, 60 HP PLUS, w/18", 24" and 36" Buckets, W/OPERATOR 150 Hour × $77.05 $11,557.50
Concrete bucket, min 1 CY 50 Hour × $22.66 $1,133.00
Generator, 3,500 min watts 150 Day × $20.40 $3,060.00
Hammer drill, 2" diameter hole, without operator 60 Day × $13.60 $816.00
Saw, concrete/water cooled, diamond edge blade/abrasive wheel, without operator 250 Hour × $20.96 $5,240.00
Jack hammer, air operated, 30 LBS, for deck work, withoutair compressor, without operator 60 Day × $77.05 $4,623.00
Jack hammer, air operated, 90 LBS for substructure work, without air compressor, without operator 30 Day × $79.31 $2,379.30
Concrete mixer 6 cubic foot capacity minimum, without operator 30 Day × $198.29 $5,948.70
Water pump, 3", with suction hose and discharge hose, without operator 100 Day × $147.30 $14,730.00
Water pump, 4", with suction hose and discharge hose, without operator 100 Day × $158.63 $15,863.00
Water pump, 12", with suction hose and discharge hose, without operator 20 Day × $226.61 $4,532.20
Scaffold, hanging, 24 FT length 20 Day × $226.61 $4,532.20
Soil tamper/wacker, 11" shoe, without operator 80 Hour × $22.66 $1,812.80
Chain saw, min 16" to 20" blade, without operator 500 Hour × $17.00 $8,500.00
BRUSH CHIPPER, CAPACITY up to 6" LIMB DIAMETER, W/OPERATOR 40 Hour × $67.98 $2,719.20
Concrete forms, wooden 100 × $9.06 $906.00
LIGHT TOWER, TOWABLE, 4 1000 WATT,DIESEL PWR GEN, without Operator 100 Hour × $17.00 $1,700.00
Roller, steel wheel, 3/4 ton, w/water system, w/operator 1,000 Hour × $113.31 $113,310.00
Truck mounted asphalt distributor, 1000 GAL. Min, with operator 1,000 Hour × $73.65 $73,650.00
Truck mounted street sweeper, vacuum type, w/ dumping capability, w/operator 100 Hour × $73.65 $7,365.00
ARROW BOARD, TRAILER MOUNTED, PORTABLE, TYPE B OR C per VWAPM SPECIFICATIONS. 300 Hour × $20.40 $6,120.00
Foreman with pickup truck 1,800 Hour × $47.59 $85,662.00
CONCRETE BARRIER, 12 FT Lengths 100 Day × $45.32 $4,532.00
TRENCH ROLLER, 24INCH MINIMUM, RAMMEX or Equivalent w/operator 500 Hour × $58.92 $29,460.00
Air compressor, 180 PSI 300 Hour × $43.06 $12,918.00
Welder, certified structure and bridge 80 Hour × $186.96 $14,956.80
Pole saw, gasoline engine powered 200 Hour × $9.06 $1,812.00
Mini tracked skid steer loader, without operator, equal to bobcat MT85 40 Hour × $73.65 $2,946.00
Message Boards 500 Hour × $20.40 $10,200.00
Concrete pump with 100 LF of pump hose, with operator 15 Day × $2,266.13 $33,991.95
350 Excavator, Rental or Lease of Earth Moving Equipment, per VDOT Specs, w/Operator, Excavator - Maximum weight to be lifted is 18,000 lbs (pounds) with operator. 1,000 Hour × $249.27 $249,270.00
Bridge deck grooving machine without operator 50 Hour × $158.36 $7,918.00
SCAFFOLD, PLATFORM, 24 ft 20 Day × $226.61 $4,532.20
Flagger, certified 1,250 Hour × $31.16 $38,950.00
Truck mounted attenuator (TMA) w/arrowboard, w/operator 100 Hour × $56.65 $5,665.00
Laborer/operator 8,000 Hour × $33.99 $271,920.00
Materials to be invoiced at cost 1 Each × $128,000.00 $128,000.00
Show 40 more

First 50 of 63 listed here. See the rest on GovTribe.

Award details come from logi.cgieva.com. Updated .

Quick answers

Who was awarded contract PO05162303-V7?

Contract PO05162303-V7 was awarded to Ken Construction Co Inc by Virginia Department of Transportation on July 17, 2026.

How much is contract PO05162303-V7 worth?

Its cumulative value is $2,609,001.

On GovTribe

See this award's full record

  • Every line item and file
  • The contract it was ordered under and its other orders
  • Similar state and local awards and opportunities
  • Ask GovTribe AI about this award