Concrete Bucket, minimum 1yd w/operator and 56 more items
State & local contract award Virginia Awarded
- Contract number
- PO05113833-V16
- Awardee
- C. R. Henderson Company
- Contracting organization
- Virginia Department of Transportation
- Cumulative value
- $896,935
About this award
C. R. Henderson Company was awarded contract PO05113833-V16 by the Virginia Department of Transportation on August 11, 2026, with a cumulative contract value of $896,935.00. Services are to be delivered to Carol Ann Doyle and encompass a comprehensive range of equipment rental and operator services for transportation maintenance and construction activities. The contract includes specialized heavy equipment such as excavators, dozers, motor graders, dump trucks, loaders, and compaction equipment, all provided with qualified operators. Additionally, the contract covers smaller equipment and tools including concrete buckets, air compressors, chainsaws, and hand-held power tools, as well as support vehicles such as pickup trucks, broom trucks, and street sweepers.
The contract further includes traffic management and road closure operation services across multiple configurations, ranging from mobile shoulder operations and lane closures to full freeway and ramp closures. Traffic control support services are specified through the provision of flaggers, arrow board trucks, queue management vehicles, and variable message boards. The contract also encompasses specialized services such as pothole patching, hydroseeding, sewer cleaning, and critical immediate response capabilities. Material and debris disposal services are included as standalone line items. Hourly rates for equipment and operators range from $15 to $180, while daily rates for traffic control operations and specialized services range from $20 to $3,000, reflecting the varying complexity and resource intensity of the services provided.
Line items
| Item | Total |
|---|---|
| Concrete Bucket, minimum 1yd w/operator | $60.00 |
| Bobcat w/ attachments, w/operator | $32,000.00 |
| Mini excavator w/ attachments w/operator | $12,000.00 |
| Air Compressor/ 30lb Jack hammer/or accessory w/operator | $320.00 |
| Skilled Laborer | $198,660.00 |
| Backhoe, rubber tire, 60hp, 18",24",36" bucket w/operator | $2,600.00 |
| Brush Chipper pull type w/operator | $4,000.00 |
| Gradall, G6-660 or equal w/operator | $1,120.00 |
| Rubber tire loader min. 110hp w/operator | $3,600.00 |
| Crawler excavator min 153hp 51000 operating w/operator | $1,760.00 |
| Motor grader min. 135hp w/operator | $28,000.00 |
| Tandem dump truck w/operator | $36,000.00 |
| Tractor/lowboy 35 ton min w/operator | $9,600.00 |
| Track loader min. 85hp w/operator | $520.00 |
| Broom truck 7.5 foot w/operator | $18,600.00 |
| Truck mounted street sweeper Left and Right operation w/operator | $2,400.00 |
| Trench/bulldog roller 20-25" width w/operator | $280.00 |
| Steel vibrator plate/ jumping jack w/operator | $1,725.00 |
| Trench box | $50.00 |
| Sewer cleaning machine min. 1000 gallon capacity w/operator | $1,440.00 |
| Crawler excavator min. 168 hp 70,000 op. weight w/operator | $1,200.00 |
| Bucket truck 25-50ft reach w/operator | $2,400.00 |
| Generator 350 watt W/ Light plant w/operator | $3,000.00 |
| Concrete mixer w/operator | $160.00 |
| Dry vac truck min tandem axle w/operator | $800.00 |
| Water pump 4"-6" w/operator | $40.00 |
| Hydroseeder w/operator | $360.00 |
| Hotbox- Minimum capacity 2 ton w/operator | $9,900.00 |
| Pickup truck for general matenance and debris w/operator | $66,440.00 |
| Single Axle Dump Truck 3 ton w/operator | $1,120.00 |
| Chainsaw, Weedeater, Hedge Trimers, Concrete Saw - hand power tools w/operator | $3,150.00 |
| Grapple Truck w/operator | $2,125.00 |
| Excavator w/ Forestery Mulching Head w/operator | $41,400.00 |
| Critical immediate response fee, per VI.9 | $15,000.00 |
| Excavator w/ rocker breaker min. 153hp w/operator | $1,600.00 |
| Supplies/Debris/Material Disposal, per IV.B | $6,065.00 |
| Wheel vibrator roller 3-5ton w/operator | $6,000.00 |
| Mobile or short duration shoulder ( TTC-3.0 ) | $17,980.00 |
| Moving/ mobile operation ( TTC-11 ) | $35,910.00 |
| TMA specific request w/operator | $29,400.00 |
| Straw blower w/operator | $1,200.00 |
| Variable message board, specific request w/operator | $2,850.00 |
| Pothole patcher spray injection w/operator | $1,440.00 |
| Flagger | $1,400.00 |
| 1 ton dump truck debris and maintenance work w/operator | $200,000.00 |
| Force feed belt loader w/operator | $520.00 |
| Arrow Board truck or trailer mounted w/operator | $16,440.00 |
| Pickup for Incident Management w/operator | $5,640.00 |
| Stationary Operation on Shoulder - Single Setup ( TTC-4.0, TTC-29.0 ) | $4,500.00 |
| D6 dozer w/operator | $560.00 |
Show 40 more
First 50 of 57 listed here. See the rest on GovTribe.
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05113833-V16?
Contract PO05113833-V16 was awarded to C. R. Henderson Company by Virginia Department of Transportation on August 11, 2026.
How much is contract PO05113833-V16 worth?
Its cumulative value is $896,935.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award