About this award
S Lewis Lionberger Construction Company was awarded contract PO05055904-V4 by Wytheville Community College in Virginia on June 22, 2026, with a cumulative contract value of $1,792,684.57. The primary scope of work encompasses a Level 2 alteration of interior space and a change of occupancy classification from Assembly (A-3) to Non-Separated Mixed Use Assembly and Business. The contractor is responsible for furnishing all labor, equipment, and materials necessary to execute the work in accordance with the contract documents.
The contract includes multiple change orders reflecting scope adjustments and unforeseen conditions encountered during performance. Change Order #2 addresses door slab and hardware replacement, suspended ceiling and grid replacement in Room 103, drain line cleaning due to clogs, and flooring replacement resulting from product discontinuation. Change Order #3 covers bulkhead extension modifications due to existing site conditions and includes a time extension request. Change Order #4 references an American Concrete Institute (ACI) No. 3 modification, and an additional change order addresses an increase in Virginia Department of Labor and Industry (DOLI) prevailing wage rates. Deliverables are designated to Joseph Collins and David Dickens as specified points of contact throughout contract execution.
Line items
| Item | Total |
|---|---|
| The project is generally described as a Level 2 alteration of interiors space and a change of occupancy from Assembly, A-3, to Non-Separated Mixed Use, Assembly and Business. The contractor shall furnish all labor, equipment, and materials and perform all work for the project is strict accordance… | $1,762,748.00 |
| Change Order # 2 RFC-2 Replacement of existing door slabs and hardware. RFC-3 Replacement of existing ACT and grid in room 103. RFC-4 Existing 2" drain line jetted due to clog/build up. RFC-5 Flooring replacement due to discontinuation of specified flooring products. | $18,930.00 |
| Change order # 3. RFC-6 Bulkhead extension due to existing conditions and RFC-7 Time extension request. | $2,171.00 |
| Change order #4- RFC-8 ACI No. 3 | $5,669.00 |
| Change order. RFC-1 Increase in Virginia DOLI prevailing wage rate. | $3,165.00 |
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05055904-V4?
Contract PO05055904-V4 was awarded to S Lewis Lionberger Construction Company by Wytheville Community College in Virginia on June 22, 2026.
How much is contract PO05055904-V4 worth?
Its cumulative value is $1,792,685.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award