The project is generally described as a Level 2 alteration of interiors space and a change… and 4 more items
State & local contract award Virginia Awarded
- Contract number
- PO05055904-V3
- Awardee
- S Lewis Lionberger Construction Company
- Contracting organization
- Wytheville Community College
- Cumulative value
- $1,792,685
About this award
S Lewis Lionberger Construction Company was awarded contract PO05055904-V3 by Wytheville Community College in Virginia on June 22, 2026, with a cumulative contract value of $1,792,684.57. The primary scope of work involves a Level 2 alteration of interior space and a change of occupancy classification from Assembly, A-3, to Non-Separated Mixed Use, Assembly and Business at an unspecified location. The contractor is responsible for furnishing all labor, equipment, and materials necessary to execute the work in strict accordance with the contract documents, with performance directed to Joseph Collins and David Dickens.
Four change orders have been issued throughout the contract period. Change Order No. 1 addresses an increase in Virginia Department of Labor and Industries prevailing wage rates. Change Order No. 2 encompasses multiple requests for changes including replacement of door slabs and hardware, acoustic ceiling tile and grid replacement in Room 103, drain line cleaning due to clogging, and flooring replacement necessitated by product discontinuation. Change Order No. 3 includes a bulkhead extension required due to existing site conditions and a time extension request. Change Order No. 4 addresses an American Concrete Institute item classified as ACI No. 3. The cumulative value reflects all original contract work and authorized change order modifications.
Line items
| Item | Total |
|---|---|
| The project is generally described as a Level 2 alteration of interiors space and a change of occupancy from Assembly, A-3, to Non-Separated Mixed Use, Assembly and Business. The contractor shall furnish all labor, equipment, and materials and perform all work for the project is strict accordance… | $1,762,748.00 |
| Change order. RFC-1 Increase in Virginia DOLI prevailing wage rate. | $3,165.00 |
| Change Order # 2 RFC-2 Replacement of existing door slabs and hardware. RFC-3 Replacement of existing ACT and grid in room 103. RFC-4 Existing 2" drain line jetted due to clog/build up. RFC-5 Flooring replacement due to discontinuation of specified flooring products. | $18,930.00 |
| Change order # 3. RFC-6 Bulkhead extension due to existing conditions and RFC-7 Time extension request. | $2,171.00 |
| Change order #4- RFC-8 ACI No. 3 | $5,669.00 |
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05055904-V3?
Contract PO05055904-V3 was awarded to S Lewis Lionberger Construction Company by Wytheville Community College in Virginia on June 22, 2026.
How much is contract PO05055904-V3 worth?
Its cumulative value is $1,792,685.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award