Mobilization No greater than 10% of total base bid amount and 29 more items
Virginia Awarded
- Contract number
- PO05432153
- Awardee
- C&S CONSTRUCTION & EXCAVATING
- Contracting organization
- Virginia Department of Energy
- Cumulative value
- $490,172
About this award
The Virginia Department of Energy awarded contract PO05432153 to C&S Construction & Excavating on August 7, 2026, with a cumulative contract value of $490,171.50. The contract encompasses site preparation and stabilization services, including mobilization, silt fence and straw bale installation, brush and tree removal across 2 acres, wooden safety fence installation, and access road grading totaling 2,900 linear feet. All deliverables are directed to Jennifer Dillemuth.
The contract further encompasses materials delivery and installation related to slide remediation and erosion control. Services include ditch excavation and cleanout, installation of various stone materials (VDOT No. 57, No. 2, No. 1, Crusher Run, and Gabion stone), riprap lining with grout application, geomembrane liner placement, 2-inch rolled asphalt installation (75 tons), permeable turf reinforcement mat installation, material disposal from slide removal (both on-site and off-site), surveying at designated project milestones, revegetation across 3 acres, and straw erosion control blanket installation. Specialty services include hammer operation with operator support.
Line items
| Item | Total |
|---|---|
| Mobilization No greater than 10% of total base bid amount | $25,000.00 |
| Site Preparation | $30,000.00 |
| Silt Fence Installed | $12,000.00 |
| Straw Bales Installed | $2,000.00 |
| Brush and Cut Trees Removal | $32,000.00 |
| Wooden Safety Fence Installed | $11,000.00 |
| Access Road Grading | $21,460.00 |
| VDOT No. 57 Stone | $16,800.00 |
| VDOT No. 2 Stone | $6,400.00 |
| 2 Inch Rolled Asphalt Installed | $26,250.00 |
| Ditch above Slide Excavation | $5,362.50 |
| VDOT No. 1 Stone Ditch Above Slide Geomembrane Liner - 20 MIL Installed | $11,562.00 |
| Ditch above Slide | $19,850.00 |
| Hammer(s) with Operator (If Necessary) | $6,000.00 |
| Ditch Cleanout | $4,800.00 |
| Ditch with Riprap Lining Excavation | $2,250.00 |
| VDOT Gabion Stone for Riprap Ditch | $1,000.00 |
| VDOT Class I Riprap for Ditch | $2,000.00 |
| PTRM Lined Ditch Excavation | $1,400.00 |
| Grout for Riprap Ditch | $2,000.00 |
| PTRM Installed | $16,250.00 |
| Natural Drain Cleanout Earthen Material Removal | $2,500.00 |
| On Site Disposal Earthen Material and Removal | $12,500.00 |
| Off Site Disposal Survey - After Clearing/Before Earthen | $81,675.00 |
| Crusher Run Stone | $4,000.00 |
| Material Removal from Slide | $3,000.00 |
| Survey - 75% Slide Removal Milestone | $3,000.00 |
| Revegetation | $6,000.00 |
| Survey - After Slide Removal | $4,500.00 |
| STRAW Erosion Control Blanket Installed | $117,612.00 |
Show all 30
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05432153?
Contract PO05432153 was awarded to C&S CONSTRUCTION & EXCAVATING by Virginia Department of Energy on August 7, 2026.
How much is contract PO05432153 worth?
Its cumulative value is $490,172.
Is contract PO05432153 an order under another contract?
Yes. It was placed under contract CTR055277.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award