Proposal #1068460 Ernst Hall Investigate underground at FDC to see if ball drip at bottom that can… and 4 more items
Virginia Awarded
- Contract number
- PO05422056
- Awardee
- Siemens Industry Inc
- Contracting organization
- Richard Bland College
- Cumulative value
- $53,585
About this award
Richard Bland College in Virginia awarded a contract to Siemens Industry Inc. on July 28, 2026, with a cumulative value of $53,584.74. The contract encompasses facility maintenance and repair services across multiple campus buildings, including Ernst Hall, McNeer Hall, and Freedom/Patriot facilities. Specific deliverables include investigation and repair of underground drainage systems at fire department connections (FDC), replacement of duct detectors and smoke heads in McNeer Hall, and excavation and installation of accessible maintenance pits and manholes at FDC locations with associated hydrostatic testing and site restoration.
The contract period extends through June 30, 2027, with provisions for additional services during this timeframe. Line item services include hardware repairs, underground drainage investigation and remediation at Ernst Hall ($10,917.50), fire safety equipment replacement at McNeer Hall ($1,292.24), and comprehensive FDC pit and drainage infrastructure installation at Freedom/Patriot facilities ($21,375.00), with an additional $20,000 reserved for contingent services. The contract deliverables focus on addressing deferred maintenance issues related to drainage systems and fire safety equipment across the college's physical plant.
Line items
| Item | Total |
|---|---|
| Hardware and Related Repair Items | — |
| Proposal #1068460 Ernst Hall Investigate underground at FDC to see if ball drip at bottom that can be plugged capped. Reset to confirm leak if fixed. Contractor will replace and seed the area. | $10,917.50 |
| Proposal# 43372McNeerHallReplace1ductdetector&1smokeheadlabor$64544material$64680 | $1,292.24 |
| Proposal #10793358 Freedom/Patriot Excavate adjacent to each FDC and install accessible pits, manholes for ball pits maintenance. Investigate existing ball drips at each location. Repair or install new ball drip. Perform hydrostatic test, install two 36" access manholes, stone bottom for drainage,… | $21,375.00 |
| For additional services needed between the period of July 1, 2026 thru June 30 2027. | $20,000.00 |
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05422056?
Contract PO05422056 was awarded to Siemens Industry Inc by Richard Bland College in Virginia on July 28, 2026.
How much is contract PO05422056 worth?
Its cumulative value is $53,585.
Is contract PO05422056 an order under another contract?
Yes. It was placed under contract CTR051360.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award