PROTRO vehicle mileage (2026) and 53 more items

Virginia Awarded

Contract number
PO05458876
Awardee
Total Environmental Concepts Inc
Contracting organization
Department of Environmental Quality
Cumulative value
$102,929

About this award

Total Environmental Concepts Inc. was awarded contract PO05458876 by the Virginia Department of Environmental Quality on September 2, 2026, with a cumulative value of $102,928.65. The contract encompasses environmental remediation and investigation services related to petroleum contamination, including the treatment of 137 tons of petroleum-contaminated soil, site reconnaissance, soil sampling, and subsurface line location activities. The service delivery includes professional staffing across multiple levels—from laborers and technicians through mid-level and senior professionals—along with associated travel time and per diem expenses for work at various locations throughout Virginia.

The contract also encompasses analytical laboratory services for environmental testing, including analysis of volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs), total petroleum hydrocarbons (TPH), and benzene, toluene, ethylbenzene, xylene, and methyl naphthalene (BTEXMN) using Environmental Protection Agency reference methods. Equipment and materials supporting field operations include heavy equipment rental (excavators, skid steer loaders, dump trailers), soil hauling, sampling equipment, safety equipment, protective materials, and site restoration supplies such as topsoil, straw bales, and reseeding materials. The contract also includes specialized services such as domestic well sampling, report preparation, and site history research to support environmental assessment and remediation activities.

Line items

Item Total
PROTRO Permit Fee 1 Each × $81.60 $81.60
PROTRO vehicle mileage (2026) 7,126 × $0.73 $5,201.98
PROTRO Bulk Fill Material 1 Each × $10,070.80 $10,070.80
PROTRO Project Manager 58 Hour × $99.80 $5,788.40
PROTRO Jr. Level Professional 4 Hour × $79.10 $316.40
PROTRO Mid-Level Professional 36 Hour × $87.00 $3,132.00
PROTRO Senior Technician 11 Hour × $74.00 $814.00
PROTRO Technician 10 Hour × $67.00 $670.00
PROTRO Laborer 84 Hour × $66.00 $5,544.00
PROTRO Equipment Operator 133 Hour × $100.00 $13,300.00
PROTRO Project Manager Travel 6 Hour × $99.80 $598.80
PROTRO Mid-Level Professional Travel 22 Hour × $87.00 $1,914.00
PROTRO Junior Level Professional Travel 3 Hour × $79.10 $237.30
PROTRO Senior Technician Travel 16 Hour × $74.00 $1,184.00
PROTRO Per Diem for Locations not listed below 8 Day × $155.00 $1,240.00
PROTRO Ethylene Dibromide – Method 8011/504.1 11 Each × $71.00 $781.00
PROTRO TPH-GRO in water/wastewater Method 8015 8 Each × $45.00 $360.00
PROTRO TPH-DRO in water/wastewater Method 8015 4 Each × $63.00 $252.00
PROTRO TPH-GRO in solid waste/soil Method 8015 5 Each × $56.00 $280.00
PROTRO VOCs in water/wastewater Method 8021/8260/624 11 Each × $110.60 $1,216.60
PROTRO BTEXMN & oxygenates in water/wastewater Method 8021/8260/624 4 Each × $92.80 $371.20
PROTRO BTEXMN & oxygenates in solid waste/soil Method 8021/8260/624 5 Each × $100.60 $503.00
PROTRO Explosimeter 1 Week × $203.00 $203.00
PROTRO Topsoil (up to 10 units) 2 Each × $2.80 $5.60
Protro PID 2 Week × $287.30 $574.60
PROTRO Straw Bale 70 Each × $7.60 $532.00
PROTRO Road Safety Cone (each) 10 Week × $8.60 $86.00
PROTRO Safety Fence (4’ x 100’) 200 Each × $0.90 $180.00
PROTRO Concrete Saw with 14” blade 4 Day × $215.20 $860.80
PROTRO Concrete Mix 6 Each × $6.40 $38.40
PROTRO Plastic Sheeting (100’ x 10’) – 6-mil 3 Each × $82.70 $248.10
PROTRO Plastic Sheeting (100’ x 20’) – 6-mil 3 Each × $175.40 $526.20
PROTRO Excavator (50000-74999 lb) 1 Week × $4,125.60 $4,125.60
PROTRO Skid Steer Loader & Bucket (50-80 hp) 1 Day × $658.00 $658.00
PROTRO Skid Steer Loader & Bucket (50-80 hp) 2 Week × $1,724.00 $3,448.00
PROTRO SVOCs (Full Suite) by Method 8270/625 11 Each × $684.20 $7,526.20
PROTRO Site Reconnaissance & Initial Site Map: Complex 1 Each × $603.50 $603.50
PROTRO Heavy Equipment Mob/Demob 2 Each × $630.00 $1,260.00
PROTRO Grab Soil Sampling 5 Each × $17.30 $86.50
PROTRO Reseeding < 1 acre 50 × $0.20 $10.00
PROTRO Dump Trailer, 20 CY 2 Week × $1,236.20 $2,472.40
PROTRO Domestic Well Sampling 11 Each × $86.30 $949.30
PROTRO Treatment of Petroleum Contaminated Soil 137 Ton × $53.40 $7,315.80
PROTRO Report Preparation 29 Hour × $106.00 $3,074.00
PROTRO Site History Research 5 Hour × $102.50 $512.50
PROTRO Two-Inch, Bail and Purge 4 Each × $90.00 $360.00
PROTRO Subsurface Line Location, Site (SUE Quality Level B) 5 Hour × $250.00 $1,250.00
X002 X-Code Special Item 1 Each × $49.78 $49.78
X001 X-Code Special Item 1 Each × $1,720.00 $1,720.00
X003 X-Code Special Item 1 Each × $3,166.60 $3,166.60
Show 40 more

First 50 of 54 listed here. See the rest on GovTribe.

Award details come from logi.cgieva.com. Updated .

Quick answers

Who was awarded contract PO05458876?

Contract PO05458876 was awarded to Total Environmental Concepts Inc by Department of Environmental Quality in Virginia on September 2, 2026.

How much is contract PO05458876 worth?

Its cumulative value is $102,929.

Is contract PO05458876 an order under another contract?

Yes. It was placed under contract CTR047912.

On GovTribe

See this award's full record

  • Every line item and file
  • The contract it was ordered under and its other orders
  • Similar state and local awards and opportunities
  • Ask GovTribe AI about this award