Mobilization-Maximum limit of no greater than 5% of total base bid amount and 35 more items
Virginia Awarded
- Contract number
- PO05145264-V2
- Awardee
- Eckhart Construction Services Inc
- Contracting organization
- Virginia Department of Energy
- Cumulative value
- $726,617
About this award
Eckhart Construction Services Inc. was awarded a contract by the Virginia Department of Energy on June 16, 2026, with a cumulative contract value of $726,616.50. The contract encompasses a comprehensive site remediation and infrastructure project to be performed at the Department of Mines & Minerals and associated work areas under the direction of Jennifer Dillemuth. The scope of work includes substantial earthwork operations (2,610 cubic yards in Work Area A and site preparation across multiple acres), bridge replacement services (demolition and installation), and geological hazard mitigation through slide repair buttress installation and toe drain construction (160 linear feet).
The contract further encompasses drainage infrastructure installation including channels (905 linear feet), catch basins, and temporary cofferdam structures; erosion control measures via silt fence (275 linear feet), erosion control blankets (4,430 square yards), and chain link fencing (310 linear feet); materials supply and placement including multiple aggregate types and riprap totaling approximately 2,615 tons; structural work comprising subfooter concrete (85 cubic yards), rebar installation, and engineering services; site restoration through pavement placement (75 tons) and revegetation (6 acres); and mine portal closure services. Additional work includes culvert installation across multiple work areas (210 linear feet in Work Area A and two units in Work Area B) and tie wall demolition and disposal services.
Line items
| Item | Total |
|---|---|
| Mobilization-Maximum limit of no greater than 5% of total base bid amount | $24,000.00 |
| Site Preparation | $25,554.00 |
| Bridge Replacement - Demolition | $10,000.00 |
| Bridge Replacement - Installation | $120,000.00 |
| Earth Work - Work Area A | $26,100.00 |
| Earth Work - Work Area C | $30,000.00 |
| Slide Repair - Buttress Installation | — |
| Slide Repair - Toe Drain | $8,000.00 |
| VDOT Class II Riprap | $73,350.00 |
| VDOT Class I Riprap | $4,500.00 |
| VDOT No. 1 Aggregate | $20,475.00 |
| VDOT No. 57 Aggregate | $19,350.00 |
| Drainage Structure - Channels | $22,625.00 |
| Drainage Structure - Catch Basin | $2,000.00 |
| Paving | $30,000.00 |
| Revegetation | $24,000.00 |
| Subfooter Concrete | $32,087.50 |
| Tie Wall Demolition | $19,455.00 |
| Tie Wall Disposal Fee | $650.00 |
| Tie Wall Disposal Hauling | $1,500.00 |
| Regrading Slope | $19,455.00 |
| Mine Portal Closures | — |
| Subfooter Engineering | $4,500.00 |
| Subfooter Excavation | $19,455.00 |
| Concrete Pumping | $47,425.00 |
| Culvert Installation - Work Area B | $24,000.00 |
| Drainage Structure - Temp Cofferdam | $1,500.00 |
| VDOT No. 26 Crusher Run Aggregate | $15,750.00 |
| Culvert Installation - Work Area A | $6,300.00 |
| Silt Fence | $2,750.00 |
| Erosion Control Blanket | $39,870.00 |
| Subfooter Rebar | $1,600.00 |
| Chain Link Fence | $10,850.00 |
| Subfooter Exploration | $19,455.00 |
| Grout for Riprap Slope | $9,060.00 |
| Riprap Placement | $2,000.00 |
Show all 36
Award details come from logi.cgieva.com. Updated .
Quick answers
Who was awarded contract PO05145264-V2?
Contract PO05145264-V2 was awarded to Eckhart Construction Services Inc by Virginia Department of Energy on June 16, 2026.
How much is contract PO05145264-V2 worth?
Its cumulative value is $726,617.
Is contract PO05145264-V2 an order under another contract?
Yes. It was placed under contract CTR044219.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award