West Range (Hotel A) Sod Installation - Provide all tools, equipment, material, and labor to install… and 2 more items

State & local contract award Virginia Awarded

Contract number
A207_PO-0196659-V3
Awardee
RIDGELINE TURF LLC.
Contracting organization
University of Virginia
Cumulative value
$6,150

About this award

The University of Virginia has awarded contract A207_PO-0196659-V3 to Ridgeline Turf LLC, effective August 1, 2026, with a cumulative contract value of $6,150.00. The prime contractor will provide sod installation services across three distinct locations on the University of Virginia campus in Virginia. The scope of work encompasses West Range (Hotel A), the area adjacent to the Chemical Engineering building sidewalk, and Garden VII. All work is to be performed at these University of Virginia facilities in Charlottesville, Virginia.

Under this contract, Ridgeline Turf LLC shall furnish all tools, equipment, materials, and labor necessary to complete sod installation at each designated area. The work includes removal of existing turf and debris, light tilling, grading, installation of Fescue sod, and initial watering. The University of Virginia will provide all soil required for grading operations. The contract specifies two line items with defined quantities—2,700 units for West Range and 3,450 units for Chemical Engineering—with both priced at $1 per unit. A third line item for Garden VII sod installation is included without a specified quantity in the award documentation.

Line items

Item Total
West Range (Hotel A) Sod Installation - Provide all tools, equipment, material, and labor to install sod in the designated area on the north side of Hotel A. This includes: removal of existing turf and debris, light tilling, grading, installing Fescue sod, and watering once thoroughly. Any soil… 2,700 Each × $1.00 $2,700.00
Chemical Engineering Sidewalk Sod Installation - Provide all tools, equipment, material, and labor to install sod in the designated area along the sidewalk north of Chemical Engineering. This includes: removal of existing turf and debris, light tilling, grading, installing Fescue sod, and watering… 3,450 Each × $1.00 $3,450.00
Garden VII Sod Installation - Provide all tools, equipment, material, and labor to install sod in the designated area of Garden VII. This includes: removal of existing turf and debris, light tilling, grading, installing Fescue sod, and watering once thoroughly. Any soil required for grading will… $1.00 each —

Award details come from logi.cgieva.com. Updated .

Quick answers

Who was awarded contract A207_PO-0196659-V3?

Contract A207_PO-0196659-V3 was awarded to RIDGELINE TURF LLC. by University of Virginia on August 1, 2026.

How much is contract A207_PO-0196659-V3 worth?

Its cumulative value is $6,150.

On GovTribe

See this award's full record

  • Every line item and file
  • The contract it was ordered under and its other orders
  • Similar state and local awards and opportunities
  • Ask GovTribe AI about this award