14' TMA Flatbed, Ballasted, Full View Bulkhead, Non-skid Deck Coating, DOT Lighting, Weatherproof… and 5 more items

Active State & local contract award Florida Awarded

Contract number
EP583437
Awardee
Not on record
Contracting organization
Department of Transportation
Contract amount
$26,512

Award facts

Completion date

Award details come from facts.fldfs.com. Updated .

About this award

The Florida Department of Transportation awarded contract EP583437 on July 29, 2026, for a total value of $26,511.69. The contract is scheduled for completion by June 30, 2027. The contract encompasses the procurement and installation of traffic management and safety equipment on a new truck platform, including a 14-foot Traffic Management Area (TMA) flatbed with ballasted full-view bulkhead, non-skid deck coating, Department of Transportation lighting, and a weatherproof junction box mounted on the truck frame.

The deliverables include man baskets with deck opening lids featuring step lighting, diamond plate deck lids, and safety swing gates; 14-inch bed stake rails kits with powder-coated finish in buttercup yellow with 42-inch handrails; a complete TMA standard lighting and electrical package comprising multiple strobes, underbody lights, flood lights, and beacon lights; and a Scorpion mounting and installation kit with truck-side mounting plates and fast-trak components. Additionally, the contract includes 16 hours of traffic safety shop labor for installation of the existing TMA, message board, and hydraulic lift onto the new truck with driver-side supports. All procured equipment items are designated as non-returnable.

Line items

Item Total
14' TMA Flatbed, Ballasted, Full View Bulkhead, Non-skid Deck Coating, DOT Lighting, Weatherproof Junction Box Mounted on Truck Frame. Item Not Returnable 1 Each × $13,400.00 $13,400.00
Man Baskets with Deck Opening Lid, Standard, Pair. Includes: Step Lighting, Diamond Plate Deck Lid, and Safety Swing Gate. Item Not Returnable 1 Each × $3,095.00 $3,095.00
14; Bed Stake Rails Kit, Powder Coated, 42 Handrail. Color: Buttercup Yellow Item Not Returnable 1 Each × $3,956.42 $3,956.42
Install - TMA Standard Lighting/Electrical Package (2 Grill Strobes, 2 Rear Strobes, 2 Headache Strobes & 4 Underbody Lights). Item Not Returnable Includes: (Warning Lights) 2-5 Amber/White Strobes - Grill, 4 - 5 Amber/White Strobes - Rear (Perimeter Lighting) 4 - 4.5 Underbody LIghts (Bed Lighting)… 1 Each × $2,187.38 $2,187.38
Traffic Safety Shop Labor Charge. Installation of Existing TMA, Message Board, & Hydraulic Lift onto New Truck *DT Side Supports*. 16 Each × $150.00 $2,400.00
Nonstock Generic Product Item Not Returnable Scorpion Mounting / Installation Kit Includes: 1 EA - 11141-01 Mounting Plate, w/o Traks Truck Side, 22 X 42 X 5/8 A36 Steel, Plain, 1 EA - 11173R Mounting Trak, RH, Low Profile Fast Trak 18-3/4 Long, Power Coated Gray 1 EA - 11173L Mounting Trak, LH, Low… 1 Each × $1,472.89 $1,472.89

Quick answers

How much is contract EP583437 worth?

Its contract amount is $26,512.

Which organization awarded contract EP583437?

Department of Transportation in Florida awarded contract EP583437.

On GovTribe

See this award's full record

  • Every line item and file
  • The contract it was ordered under and its other orders
  • Similar state and local awards and opportunities
  • Ask GovTribe AI about this award