Shaw Air to Provide FDOT Deland Operations 1650 N Kepler Rd, DeLand, FL 32724 the following… and 3 more items
Ended State & local contract award Florida Awarded
- Contract number
- EP462733
- Awardee
- Not on record
- Contracting organization
- Department of Transportation
- Contract amount
- $21,546
Award facts
- Completion date
Award details come from facts.fldfs.com. Updated .
About this award
The Florida Department of Transportation (FDOT) awarded contract EP462733 to Shaw Air for HVAC equipment replacement and repair services at the Deland Operations facility located at 1650 N Kepler Road, DeLand, Florida. The contract, valued at $21,546.00, is scheduled for completion between August 25, 2025, and December 31, 2025, encompassing multiple distinct HVAC system interventions.
Specific service deliverables include: replacing a condenser coil, condenser fan, and start capacitor at one location; installing a 4-ton Trane straight cool split system in the Concrete Lab with horizontal suspended mounting; replacing run and start capacitors on multiple rooftop units (RTU #4, 7, 10, 13); and comprehensively replacing compressors, plugs, and filter dryers on RTU #9. The work involves specialized technical tasks such as system evacuation, refrigerant charging to factory specifications, and utilizing crane services for equipment positioning. Each line item represents a targeted mechanical intervention with varying parts lead times ranging from 2-3 days to 4-8 weeks.
Line items
| Item | Total |
|---|---|
| Shaw Air to Provide FDOT Deland Operations 1650 N Kepler Rd, DeLand, FL 32724 the following: Estimate # 379 # Replace condenser coil, replace condenser fan, replace start capacitor, replace lter dryers, brazing and evacuation supplies, charge system to factory specs. Crane lift for coil. (2-3 days… | $4,621.00 |
| Replace split system in Concrete Lab. Provide and install 4 ton straight cool Trane split system. Horizontal suspended install. Flush and reuse copper refrigeration lines and pvc drains. Connect to existing duct and electrical. Crane condenser unit to roof. (1 week lead time for parts) | $8,925.00 |
| Line items #3,5,6,7 Replace all run and start capacitors on RTU #4,7,10,13 | $800.00 |
| RTU#9 Replace both compressors, plugs, lter dryers. Evacuate system. Charge to factory specs. (4-8 week lead time on compressors) total Replacement cost approximately 18k. | $7,200.00 |
Quick answers
How much is contract EP462733 worth?
Its contract amount is $21,546.
Which organization awarded contract EP462733?
Department of Transportation in Florida awarded contract EP462733.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award