Project Grant R22AP00195
Award Date 3/22/22
Completion Date 12/31/22
Dollars Obligated $763K
Federal Agency
Federal Grant Program
Assistance Type
Project Grant
Place of Performance
Texas, USA
Similar Awards
- The U.S. Bureau of Reclamation awarded a $5,918,760 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to the Hidalgo County Irrigation District No. 2 in Texas. The funding will be used to construct infrastructure and efficiency improvements to a feeder canal, discharge pipes, and a pumping plant. Key project activities include building reinforced isolation bays on the headwall and feeder canal, as well as replacing the pump discharge...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $894,676 Project Grant to the Cameron County Irrigation District #2 in Texas under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507). The funding will be used to convert 4,713 linear feet of unlined open canal in a segment of Lateral C-2 to a buried polyvinyl chloride pipeline. This project is expected to result in annual water savings of 280 acre-feet that is currently...
- The Harlingen Irrigation District Cameron County No. 1 in Texas received a $219,732.76 Project Grant award on July 11, 2023 from the U.S. Department of the Interior Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA #15.507). The grant funding will be used to upgrade the canal flow measurement instrumentation at the Adams Gardens River Pump Station with an acoustic Doppler flowmeter and Supervisory Control and Data Acquisition (SCADA)...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $1,133,442 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to the Cameron County Irrigation District C-15 in Texas. The grant will fund the conversion of 5,207 linear feet of unlined open canal in a segment of Lateral 15 to a buried polyvinyl chloride pipeline. This project is expected to result in annual water savings of 390 acre-feet that would have otherwise...
- The United Irrigation District, located in Hidalgo County, Texas, was awarded a $1,700,000 Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507). The funding will be used to install seven flow control and metering gates and four flow control gates on the Bryan Canal, which provides water to the cities of Mission and McAllen, Texas, and the Sharyland Water...
- The Hidalgo County Irrigation District (HCID) in Mission, Texas was awarded a $5,056,600 Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514). The grant will fund the construction of a new pump station to increase the reliability and flexibility of HCID's water diversion from the Rio Grande River during the current severe drought affecting the region. This project aims to address operational...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $5,149,141 WaterSMART (CFDA 15.507) project grant to the Malheur Watershed Council, in partnership with the Vale Oregon Irrigation District, to convert 10.4 miles of open-earthen irrigation canals to plastic irrigation pipe in eastern Oregon. This project is expected to result in annual water savings of 4,888 acre-feet, which will benefit the federally listed bull trout by helping to achieve a carryover pool in Beulah...
- The El Paso County Water Improvement District No. 1 received a $4,031,382 Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507). The grant will fund the lining of 11,000 feet of the Riverside Canal with steel-panel reinforced concrete, which is expected to result in annual water savings of 1,637 acre-feet by reducing seepage losses. This project aims to improve water...
- The Brownsville Public Utilities Board received a $4.55 million Project Grant from the Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507), awarded on September 16, 2025, with a completion date of March 31, 2027. The grant funds restoration and improvement projects for the Resaca de la Guerra, a former Rio Grande River distributary in Brownsville, Texas that serves as both a potable water supply...
- The U.S. Bureau of Reclamation awarded a $300,214.26 Project Grant on January 23, 2024 to the El Paso County Water Improvement District No 1 in Texas under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507). The grant funds will be used to line 3,465 linear feet of the earthen Montoya Main Lateral canal with reinforced shotcrete. This upgrade will reduce water loss due to evaporation and seepage, as well as decrease sediment loading in the canal, improving...
THE HARLINGEN IRRIGATION DISTRICT CAMERON COUNTY NO.1, LOCATED IN SOUTHERN TEXAS, WILL CONVERT3,750 FEET OF THE CONCRETE WYRICK CANAL TO 48-INCH AND 42-INCH PRESSURIZED POLYVINYL CHLORIDEPIPE. THE HARLINGEN AREA IS DEPENDENT ON SURFACE WATER FROM THE RIO GRANDE AND EXPERIENCESWATER CONFLICT AS A RESULT OF DROUGHT, OVER-APPROPRIATION OF WATER RIGHTS, AND POPULATION GROWTH.THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 68 ACRE-FEET CURRENTLY LOST TOSEEPAGE AND EVAPORATION, WHICH WILL REMAIN IN THE RIO GRANDE RIVER BASIN TO BENEFIT OTHER RIOGRANDE WATER USERS IN DOMESTIC, MUNICIPAL, INDUSTRIAL, AGRICULTURAL, ECOLOGICAL, AND RECREATIONALSECTORS.
Posted 3/22/22
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $0 | 9/4/24 | ||
| Not listed | $300.0k | 3/22/22 |