Project Grant 69A36525420150RASMO
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded $1,671,972.30 to the Missouri Department of Transportation (MoDOT) on June 5, 2025, under the Highway Planning and Construction program (CFDA 20.205). This formula grant funds the replacement of a bridge over Drywood Creek located 2.8 miles east of the Kansas state line on State Line Road in Barton, Missouri. The project deliverable is the complete replacement of the existing bridge infrastructure to improve...
- Federal Grant Award Summary The Missouri Department of Transportation (MoDOT) received a Formula Grant award of $294,368.80 from the Federal Highway Administration (FHWA) on June 16, 2025, under the Highway Planning and Construction program (CFDA 20.205). The grant funds the rehabilitation of a bridge over Mill Creek on Missouri Route 47 South in Washington, Missouri. This project represents a standard highway infrastructure improvement activity eligible under the Federal-aid Highway Program,...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded Missouri Department of Transportation (MoDOT) a formula grant totaling $1,311,131.38 under the Highway Planning and Construction program (CFDA 20.205) on July 1, 2025. This award funds bridge improvements over Hickory Creek located 1.7 miles west of Route W near Farber in Audrain County, Missouri. The project represents a targeted infrastructure preservation initiative within the FHWA's federal-aid highway program,...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded Missouri Department of Transportation (MoDOT) a Formula Grant totaling $1,109,475.00 on May 13, 2025, under the Highway Planning and Construction program (CFDA 20.205) to support bridge rehabilitation infrastructure. Specifically, the award funds rehabilitation work on the US 67 South bridge over Route 180 in St. Louis, Missouri. This project aligns with the Highway Planning and Construction program's primary objective...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded the Missouri Department of Transportation (MoDOT) $811,863.44 through a Formula Grant under the Highway Planning and Construction program (CFDA 20.205) on June 3, 2025. This award funds the rehabilitation of two bridges on US 54 East in Camden, Missouri: one spanning the Grand Glaize Arm and the other crossing the Niangua River. Bridge rehabilitation represents a core eligible activity under the Highway Planning and...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded $520,089.44 to the Missouri Department of Transportation (MoDOT) on June 5, 2025, under the Highway Planning and Construction federal grant program (CFDA 20.205). This formula grant funds bridge improvement infrastructure in Phelps, Missouri, specifically addressing the replacement and rehabilitation of a bridge crossing Little Piney Creek and the BNSF Railway corridor. The project represents a targeted investment in...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded $232,647.98 to the Missouri Department of Transportation on June 18, 2025, under the Highway Planning and Construction program (CFDA 20.205) to fund bridge infrastructure improvements on Twin River Bridge over Big River in Jefferson County, Missouri. The grant supports three primary project components: deck replacement, girder span replacement, and guardrail upgrades. These improvements are designed to enhance safety...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded Missouri Department of Transportation (MoDOT) a formula grant totaling $5,870,474.07 under the Highway Planning and Construction program (CFDA 20.205) on April 4, 2025. This award funds the replacement of a bridge structure on US Route 40 East in Howard, Missouri, spanning over the Katy Trail and Salt Creek. The project represents a critical infrastructure preservation initiative designed to maintain safe and...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded $226,703.36 to the Missouri Department of Transportation (MoDOT) on June 5, 2025, under the Highway Planning and Construction federal grant program (CFDA 20.205). This formula grant supports the replacement of Bridge #1460010 located on County Road 281 over Big Branch in Marion County, Missouri. The project involves the demolition of the existing bridge structure and construction of a new bridge to restore safe passage...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded Missouri Department of Transportation (MoDOT) a formula grant of $615,715.83 on May 12, 2025, under the Highway Planning and Construction program (CFDA 20.205). This award funds the replacement of a bridge over Drain Ditch 44 located on US Route 62 East in New Madrid, Missouri. Bridge replacement projects represent a core eligible activity under the Highway Planning and Construction program, which supports...
The Federal Railroad Administration (FRA) awarded Missouri Department of Transportation (MoDOT) a $34.5 million Project Grant on June 1, 2025, under the National Infrastructure Investments program (CFDA 20.933) to partially reconstruct Norfolk Southern's Grand River Bridge in Brunswick, Missouri. The project involves replacing the main channel crossing with a ballast-deck steel superstructure and removing substructure units to raise the low-chord elevation by approximately 5 feet or more. These modifications will significantly increase the hydraulic opening of the bridge, enabling improved water flow capacity and reducing infrastructure vulnerability to debris accumulation and structural damage. The reconstruction addresses persistent operational challenges posed by large timber drift accumulations transported by the river, which currently necessitate costly and dangerous removal efforts to mitigate lateral loading and fire hazards. In extreme events, unmanageable drift buildup has historically caused structural damage or failure. By enhancing the bridge's hydraulic capacity and clearance, the project will substantially reduce or eliminate these recurring issues, improving both operational safety and long-term infrastructure reliability. The work is scheduled for completion by March 31, 2028.Federal Grant Award Summary
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $17.3m | 7/28/25 |