Project Grant 693JF72444075

Award Date 12/20/24
Completion Date 11/15/29
Dollars Obligated $16M
Federal Grant Program
20.823
Assistance Type
Project Grant
Place of Performance
Milwaukee, WI 53202, USA
Similar Awards
This $5,250,000 Project Grant from the U.S. Department of Transportation Maritime Administration's United States Marine Highway Grants program (CFDA 20.816) will fund necessary equipment and infrastructure improvements for the Port of Harlingen Authority in Milwaukee, WI. The grant will support the purchase of 10 chassis, spreader bars, a lift truck, yard hostler, and bomb cart, as well as container yard surfacing, security fencing, and access road improvements. These investments are intended to...
This $40,199,768 federal Project Grant award from the Maritime Administration under the National Infrastructure Investments (CFDA 20.933) program will fund three components at PortMiami: A Design Criteria Package for an Expanded Intermodal Rail Capacity project, including preliminary design, technical specifications, and cost estimates. Design and construction of the Expanded Intermodal Rail Capacity project, which will build two new 3,200-foot rail tracks, install a railroad switch, replace...
The U.S. Department of Transportation's Maritime Administration awarded a $26,766,869 Project Grant to the Port of South Louisiana dba Globalplex Terminal under the Port Infrastructure Development Program (CFDA 20.823). The grant supports construction of four key infrastructure components to enhance the port's cargo handling capabilities: 1) A heavy load capacity floor in an existing 54,000 sq. ft. warehouse, 2) Conveyor system improvements to support agricultural exports, 3) A new 0.5-mile rail...
This $140,125,000 Project Grant award from the U.S. Department of Transportation's Maritime Administration (CFDA 20.823 Port Infrastructure Development Program) will fund the reconfiguration and modernization of the Husky Terminal at the Port of Seattle. The key components of the project include: Reconfiguring the container storage yard to improve truck and yard tractor efficiency through demolition, utility relocation, paving, and striping work. Installing approximately 40 new reefer racks...
The Paducah-McCracken County Riverport Authority received a $3,820,000 Project Grant from the U.S. Department of Transportation Maritime Administration's Port Infrastructure Development Program (CFDA 20.823) on August 18, 2023. The grant funds several related infrastructure improvements at the port, including: Modernizing the port's material handling equipment by replacing three cable mast radial stackers, a 90-foot conveyor and reclaim hopper, and procuring three ground conveyors and one...
This $10,000,000 federal Project Grant award, provided by the U.S. Maritime Administration under the National Infrastructure Investments (CFDA 20.933) program, will fund the planning, design, and environmental permitting for on-terminal rail track replacement, realignment, and load capacity improvements at the Port of San Diego. The project includes topographic surveying, rail track load testing, geotechnical exploration, hazardous materials assessment, and planning for seismic upgrades,...
The Toledo-Lucas County Port Authority Inc. Seaport Division received a $20 million project grant award from the Department of Transportation Maritime Administration under the Port Infrastructure Development Program (CFDA 20.823) to provide reconstruction and upgrade of the dock face and introduce a liquid transloading facility in Toledo, OH. The grant will support improvements to port facilities that enhance the safety, efficiency, and reliability of cargo movement through the port and...
This federal Project Grant award, provided by the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823), will fund the purchase of equipment to enhance cargo handling and freight movement capabilities at the Port of Port Angeles, WA. Specifically, the $11,250,000 grant will fund the acquisition of two reduced-emissions log stackers, two hybrid material handlers, and a bulk cargo conveyor system. These equipment...
The City of Marquette was awarded a $2,367,750 grant from the U.S. Department of Transportation's Maritime Administration under the Port Infrastructure Development Program (CFDA 20.823) to conduct dredging and coastal resiliency initiatives at the Port of Marquette. The grant funding will be used for two separate dredging components: The City of Marquette will complete design and dredge up to 54,100 cubic yards of material from the sediment plume at the outflow of the Dead River, placing the...
The $29.05 million Department of Transportation Maritime Administration project grant will fund multimodal infrastructure investments across three ports in Illinois and Missouri. At the America's Central Port District in Granite City, Illinois, the award will support approximately 2,050 linear feet of new railroad track, a new terminal access roadway, a new belt system, and barge loading system replacement. At the St. Louis Port Authority in Missouri, projects include around 7,300 linear feet of...

This $15,793,921 federal Project Grant award, provided by the U.S. Department of Transportation's Maritime Administration (CFDA 20.823 Port Infrastructure Development Program), will fund a multi-component project to expand the capacity and operational capabilities of the Port of Milwaukee. The key activities include:

  1. Constructing two new 9,000 metric ton grain storage silos, including excavation, foundations, and installation of a bin unloading system and aeration equipment.
  2. Purchasing and installing additional grain and cargo handling equipment, such as a bucket elevator, conveyors, fill conveyors, and unload conveyors, to enhance the port's receiving, storage, and loading capacity.
  3. Upgrading the port's electrical infrastructure, including a new motor control center, wiring for new motors, and integration with the existing programmable logic controller.
  4. Acquiring rolling equipment, including a railcar mover, wheel loader, and excavator, to support efficient cargo movement.

The award recipient is the City of Milwaukee, which will coordinate with sub-recipients to execute the project components by the November 2029 completion date. This investment aims to improve the safety, efficiency, and reliability of goods movement through the Port of Milwaukee, strengthening its role as a critical maritime commerce hub.