Project Grant 693JF72344037
- This Project Grant award from the Maritime Administration under the National Infrastructure Investments (CFDA 20.933) program will provide $10,000,000.00 to the San Diego Unified Port District to fund the planning, design, and environmental permitting for on-terminal rail track replacement, realignment, and load capacity improvements. The project will also advance the planning of seismic upgrades, concrete resurfacing, water and utility reconfiguration and upgrades, as well as front gate...
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded $4.44 million in Project Grant funding to the Lowndes County Port Authority to construct 6,700 linear feet of new rail track at the port facility near Columbus, Mississippi. This infrastructure improvement project, obligated on October 1, 2025, with an expected completion date of November 1, 2029, addresses operational inefficiencies caused by the existing single-track spur configuration. The new dual-track system will...
- Federal Project Grant Award Summary The U.S. Department of Transportation's Maritime Administration awarded the San Diego Unified Port District (Port of San Diego) a $15.25 million Project Grant on August 1, 2025, under the Port Infrastructure Development Program (CFDA 20.823) to fund critical infrastructure upgrades at Berth 24-11. The project will support barge cargo movement between the Pacific Northwest and Southern California through comprehensive structural repairs scheduled for completion...
- This $106,630,200 federal Project Grant award from the U.S. Department of Transportation's Maritime Administration (CFDA 20.823 Port Infrastructure Development Program) will fund three main components of infrastructure improvements at the Port of Long Beach in California: East Rail Yard Expansion: Extending existing rail tracks, constructing new tracks, and upgrading support facilities to increase operational efficiency and safety for freight rail operations. New Locomotive Facility: Building...
- Federal Project Grant Award Summary The U.S. Maritime Administration (MARAD) awarded the Port of Oakland $47.3 million on October 28, 2025, under the Port Infrastructure Development Program (CFDA 20.823) to construct and modernize port infrastructure supporting container operations. The project delivers a comprehensive 25-acre off-dock container support facility featuring approximately 28 acres of asphalt concrete pavement replacement to support container stacking and structural stability,...
- Federal Grant Award Summary The U.S. Department of Transportation Maritime Administration awarded $14.3 million to Lowndes County Board of Supervisors on November 3, 2025, under the Port Infrastructure Development Program (CFDA 20.823) to design, engineer, construct, and inspect a new rail spur and transload infrastructure at the Lowndes County West Bank Port in Columbus, Mississippi. The project encompasses three primary components: (1) engineering, design, environmental reviews, and permitting...
- This federal Project Grant award from the Maritime Administration (CFDA 20.933 National Infrastructure Investments) provides $39,277,624 to the City of Los Angeles Harbor Department to construct a four-lane grade-separated roadway over the Port of Los Angeles mainline rail tracks. The project will eliminate a significant truck access impediment to an important container terminal support facility on Terminal Island, improving economic competitiveness and safety by eliminating automobile crossings...
- Federal Grant Award Summary The Maritime Administration awarded America's Central Port District a $550,000 Project Grant under the National Infrastructure Investments program (CFDA 20.933) on July 24, 2025, to conduct comprehensive planning and feasibility activities for an interconnect freight rail track linking Granite City Harbor and Madison Harbor along the Mississippi River in Illinois. The project, with an ultimate completion date of September 30, 2027, will deliver a detailed 30 percent...
- This $237.1 million Project Grant from the Department of Transportation's Federal Railroad Administration, under the National Infrastructure Investments (CFDA 20.933) program, will fund the design and construction of a grade separation in Stockton, California. Caltrans will deliver the project, which involves separating the two north-south Union Pacific Railroad mainline tracks from the two east-west BNSF Railway mainline tracks to reduce congestion. The project is scheduled for completion by...
- This federal Project Grant award from the U.S. Maritime Administration (CFDA 20.933 - National Infrastructure Investments) provides $72,379,275 to the Port of Longview to expand the capacity of the port's existing industrial railroad corridor. The key components of the project include: Acquiring right-of-way and property through appraisals, negotiations, and potential condemnation or long-term leasing. Completing 100% engineering design and project management for the rail improvements....
AWARD PURPOSE THE PROJECT IMPROVES THE PORT OF STOCKTONS LEAD TRACK BY THE REPLACEMENT OR UPGRADE OF APPROXIMATELY 13400 FEET OF EXISTING RAIL AND BALLAST REALIGNMENT OF CURVES AND RECONSTRUCTION OF ROUGHLY THIRTY TURNOUTS. THE PROJECT ALSO INCLUDES SITE CLEARING GRADING DRAINAGE AND UTILITY WORK. ACTIVITIES TO BE PERFORMED THE PROJECT CONSISTS OF THE FOLLOWING ACTIVITIES TO BOLSTER THE PORTS LEAD TRACK IN BOTH THE EAST COMPLEX AND THE WEST COMPLEX ENGINEERING PERMITTING INSPECTION. UPGRADING APPROXIMATELY 13400 TRACK FEET OF 112 LB YD RAIL WITH NEW 136LB PER YD CONTINUOUS WELDED RAIL ON ALL CURVES. IMPROVE TRACK DRAINAGE AT KEY LOCATIONS. REALIGN COMPOUND CURVE RAIL WITH SINGLE RADIUS CURVES. REGRADE APPROXIMATELY 3500 FEET OF TRACK TO PROVIDE BALLAST WALKWAY FOR MAINTENANCE ACCESS. INSTALL WOOD TIES ON CURVES VERSUS CONCRETE TIES TO REDUCE WEAR. TEST ALL TANGENT TRACKS FOR DEFICIENCIES TO DETERMINE IF VIABLE AS A SHORT-TERM SOLUTION AND REALIGN TO BE STRAIGHT. EVALUATE OPPORTUNITIES TO REALIGN PORT LEAD TRACK TO SOFTEN TIGHT CURVES. REPLACE OR UPGRADE APPROXIMATELY 30 TURNOUTS CONNECTING CUSTOMER SPUR TRACKS TO THE LEAD TRACK THAT DO NOT COMPLY WITH THE LATEST RAILROAD REQUIREMENTS. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM SCHEDULE G PAGE 11 OF THE GRANT AGREEMENT. FREIGHT MOVEMENTS NUMBER OF RAILCARS THAT ARE RECEIVED BY THE PORT QUARTERLY. GROSS TONS. THE GROSS TONNAGE OF MATERIAL THAT IS MOVED THROUGH THE PORT. QUARTERLY. INTENDED BENEFICIARY STOCKTON PORT DISTRICT. SUBRECIPIENT ACTIVITIES NONE.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $0 | 2/6/26 | ||
| Not listed | $9.6m | 3/15/24 |