Project Grant 693JF72344028

Award Date 7/31/24
Completion Date 7/31/29
Dollars Obligated $59M
Federal Grant Program
20.823
Assistance Type
Project Grant
Place of Performance
Aberdeen, WA, USA
Similar Awards
This federal Project Grant award, provided by the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823), will fund a $140,125,000 project by the Northwest Seaport Alliance (NWSA) in Aberdeen, WA. The project aims to reconfigure the Husky Terminal Yard to improve truck and yard tractor efficiency, install approximately 40 reefer racks with related power supplies, and relocate on-terminal structures. Key components...
This Project Grant award from the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823) provides $10,926,060 to the Port of Grays Harbor to support the development of a heavy lift marine terminal facility at the Redwood Marine Terminal (RMT) to support offshore wind farm projects. The key products and services to be delivered under this grant include completing site studies, design and engineering, permitting...
This federal Project Grant award from the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823) will provide $11.25M to the Port of Port Angeles, WA to fund the purchase of two reduced emissions modern log stackers, two hybrid material handlers, and a bulk cargo conveyor system. The activities to be performed under the grant include: 1) purchasing the log stackers and conveyor system to move timber, wood chips, and...
This federal Project Grant award from the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823) provides $10,760,000 to the Port of Port Angeles for structural repairs and improvements to an existing 112-year-old dock, as well as pavement improvements to increase the surface elevation and load capacity for approximately 10 acres of an existing 30-acre cargo yard. The project will rehabilitate and improve the...
This federal Project Grant award, valued at $3,932,359.60, was provided by the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823). The grant supports the reconstruction and rebuilding of a decades-old wooden bulkhead to enhance transportation operations at the Port of Ilwaco, located on the southwest coast of Washington State. The key products and services to be delivered through this funding include: Completing...
This federal Project Grant award from the U.S. Maritime Administration (CFDA 20.933 - National Infrastructure Investments) provides $72,379,275 to the Port of Longview to expand the capacity of the port's existing industrial railroad corridor. The key components of the project include: Acquiring right-of-way and property through appraisals, negotiations, and potential condemnation or long-term leasing. Completing 100% engineering design and project management for the rail improvements....
This Project Grant award from the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823) provides $5,835,370 to Tidewater Barge Lines Inc. to fund the purchase and installation of an electric dock crane at the recipient's terminal in Vancouver, WA, as well as a low-emissions mobile crawler crane at the recipient's terminal in Boardman, OR located at the Port of Morrow. The project consists of three main components: 1)...
The U.S. Department of Transportation Maritime Administration (MARAD) awarded the City of Aberdeen, MS, a $4,000,000 Project Grant under the Port Infrastructure Development Program (CFDA 20.823) to fund the construction of a 12,200-linear-foot rail spur. This rail spur will provide direct access between the Port of Aberdeen along the Tennessee-Tombigbee Waterway and the Kansas City Southern Railroad, enhancing freight movement and economic competitiveness in the region. The project includes site...
This $108,410,120 federal Project Grant award, issued on August 15, 2024 by the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823), will fund infrastructure improvements at the Port of Alaska in Anchorage. The key activities include demolishing an existing sheet pile wall, removing approximately 1.465 million cubic yards of material, and constructing a new shoreline revetment using armor rock. This project is part...
The Department of Transportation Maritime Administration awarded a $10.7 million Project Grant under the Port Infrastructure Development Program (CFDA 20.823) to the Northwest Seaport Alliance to support the final phase of modernizing and rehabilitating Terminal 5 at the Port of Seattle. The grant funds two key infrastructure improvement projects at the terminal to enhance container handling operations and increase refrigerated container capacity. Specifically, SSA Terminals (Seattle Terminals),...

This $59,010,000 Project Grant award from the U.S. Department of Transportation's Maritime Administration (MARAD), under the Port Infrastructure Development Program (CFDA 20.823), will fund a multi-faceted infrastructure improvement project at the Port of Grays Harbor in Aberdeen, Washington. The key components of the project include:

  1. Constructing approximately 40,000 feet of additional rail to enable more efficient unit train offloading, railcar storage, and unit train assembly at the port's Terminal 4. This will include new loop routes, ladder tracks, and rail upgrades.

  2. Repurposing a 50-acre brownfield site into a new cargo laydown area adjacent to the port's Terminal 4A breakbulk and Ro-Ro berth, to enhance cargo flow and handling capabilities.

  3. Improving site access and security through new roadways, storm drainage systems, fencing, and a new entrance gate with a guard station.

  4. Upgrading the existing marine terminal fendering system and stormwater collection/treatment at Terminal 4 to accommodate increased vessel traffic.

The project is expected to be completed by July 31, 2029, and aims to improve the safety, efficiency, and reliability of cargo movement through the Port of Grays Harbor's multimodal facilities.

Generated 5/13/25, 5:25 AM