[[the goal of the project is to build a strong technical foundation regarding slag design for the development of the hertha green iron & steel production process

Ended Cooperative Agreement Awarded Last action

Award ID
DEEE0010870
Recipient
Awarding agency
Obligated
$2,064,145

Award facts

Assistance listing
81.086 Conservation Research and Development
Completion date
Originally
Funding
  • $1,651,316.00 Federal
  • $412,829.00 Non-federal
Place of performance
Brownsville, TX, USA

Award details come from USAspending.gov.

Description

Ensuring the optimal slag medium is fundamental to successful process implementation.]] 3.1 objectives [[the project has a number of objectives stemming from the role that the slag plays in ensuring an efficient and effective smelting process.]] 3.1.1 slag composition optimization [[the core objective is to optimize the composition of the slag bath for hydrogen reduction of iron oxide in a DC EAF. This requires attention to a number of specific sub-objectives:]] 3.1.1.1 iron oxide assimilation in the bath [[to design a slag with the ability to quickly assimilate the iron oxide feed through dispersion and dissolution.]] 3.1.1.2 iron oxide reduction rate [[to optimize the slag composition for rapid hydrogen-slag reaction kinetics to make most efficient use of the hydrogen reductant.]] 3.1.1.3 slag heat transfer [[to ensure the slag has appropriate properties to effectively transfer heat from the area of concentrated heat generation at the electric ARC to the iron oxide feed and hydrogen reductant.]] 3.1.1.4 slag bath containment [[to develop a slag composition that allows for a sustainable slag freeze lining compatible with the desired refractory furnace lining.]] 3.1.1.5 slag-metal separation [[to optimize conditions for the separation of metal and slag within the constraints of process fluid dynamics.]] 3.1.2 evaluation of refractory compatibility [[to understand the reaction mechanisms between different refractory materials and slag compositions. This work will be conducted by idaho national laboratory.]] 3.1.3 integrated slag-process model [[to construct a process model of the slag bath which integrates all critical features covered in this project to quantitatively predict the state of each as a function of slag composition and operating conditions.]] 3.1.4 pilot testing [[to demonstrate 300 KG per day scale operation of green iron production through the novel hydrogen-electric smelting reduction furnace. Success will be demonstrated by pilot tests which assess slag design for the integrated process where all phenomena are present.]]

Transactions

Action Federal Non-federal Date
Amendment $0 $0
Amendment $0 $0
Original award $1,651,316 $412,829

Quick answers

Who received award DEEE0010870?

DEEE0010870 was awarded to Hertha Metals, Inc. by Office of Energy Efficiency and Renewable Energy (Department of Energy) on October 1, 2023.

How much is award DEEE0010870 worth?

$2,064,145 has been obligated on DEEE0010870: $1,651,316 in federal funding and $412,829 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award