Recovery arra-1173B-arra-OM- splwy area-perimeter fence the contractor shall provide all labor, equipment and materials to install approximately 3200 (194 rods) of 54 high field fence along portions…
Ended Purchase Order Awarded Last action
- Contract number
- W912DQ09P0196
- Awardee
-
Eickholt Fencing & Excavating, Inc. UEI JN4MMSZHFS68
- Awarding agency
-
ENDIST Kansas City
US Army Corps of Engineers, Department of Defense
- Obligated
- $30,000
Award facts
- Opportunity
-
- W912DQ09T1035 Solicitation number
- RECOVERY--Y--RECOVERY: Field Fence around the Spillway Cycle Area at Tuttle Creek Lake. Award Notice · Posted Aug 17, 2009
- Contract value 100% obligated
- $30,000.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 238990 All Other Specialty Trade Contractors
- PSC
- Y291 Construct/Rec Non-Bldg Structs
- Set-aside
- Total Small Business
- Competition
- Full and Open Competition after exclusion of sources · 2 offers Negotiated Proposal / Quote
- Pricing
- Firm Fixed Price
- Place of performance
- Manhattan, KS 66502, USA
- Legislative mandates
-
- Davis-Bacon Act FAR subpart 22.4
Award details come from SAM.gov/FPDS.
About this award
This is a federal contract awarded by the U.S. Army Corps of Engineers (USACE) Kansas City District to Eickholt Fencing & Excavating, Inc., a small business contractor. The $30,000.00 firm fixed price contract requires the installation of approximately 3,200 feet of field fencing along the Tuttle Creek Lake Spillway Cycle Area in Manhattan, Kansas. The fencing is to be made of new materials per the detailed specifications provided. This contract is associated with the American Recovery and Reinvestment Act (ARRA) and must be completed by September 1, 2009.
Description
Recovery arra-1173B-arra-OM- splwy area-perimeter fence the contractor shall provide all labor, equipment and materials to install approximately 3200 (194 rods) of 54 high field fence along portions of the boundary shown on the attached map of the tuttle creek lake spillway cycle area located off dyer road below tuttle creek DAM. All distances are approximations and should be verified by a site visit. Materials all fence material shall be new. The fence shall be made of redbrand multi-use woven field fence, monarch style #1047-6-9 wire with a barbless barb wire six inches above the field fence. Line posts shall be 6 commercial standard 185-51, studded- t steel posts (1.33 LB/FT), with two coats of aluminum pigmented baked enamel set a maximum of 15 feet apart and set 2 in the ground. Line braces for continuous fence runs shall be spaced no further than 800 feet apart. The fence shall be braced wherever there is a change in fence direction or a change in elevation greater than 25 degrees. Brace posts shall be 8 tall; 6-8 round pressure treated or hedge and shall be set 3 6 in the ground. Brace wire should be #9 smooth galvanized. This contract includes clearing of vegetation along the fence alignment and all clearing shall be kept to the minimum necessary to construct the fence. The inspecting officer, mark krause, prior to that clearing activity being undertaken, shall approve any clearing in excess of 10 feet wide. All slash/vegetation 3 in diameter or less may be disposed of outside the fence at the spillway cycle area. All cut timber 3 or greater in diameter resulting from fence construction must be removed from the fence alignment area to an approved disposal area or salvaged by the contractor. Disposal of brush may be placed at the corps burn site near the spillway cycle area or removed and salvaged for firewood, chips or other uses by the contractor. The extent of clearing will be left to the bidder to make the most economical decision to construct the fence. Fence location the spillway cycle area is shown on the attached drawings. One portion of the fence (a) will go from an existing fence near the parking lot of the spillway cycle area along the top of the east side of the spillway, the west side of the cycle area, to an existing fence which runs along the road in the river pond state park that crosses the spillway. The other fence (b) will run from the southeast end of the existing fence along the road in the river pond state park that crosses the spillway, along dyer road until IT can make a 90 degree corner northwest to southeast corner of the existing fence around the storage area. Much of the area is very rocky, wooded and will require many corner and brace posts to complete fence construction. The tuttle creek corps of engineers must be notified one week before work begins. Work may not be done from 22 through 29 june. The contractor must be registered with the central contractor registration and the online representation and certification application. This can be done at https://WWW.BPN.GOV/CCR/scripts/index.html and https://WWW.BPN.GOV. A visit to both sites is strongly recommended prior to submittal of a bid. If you have any questions please call greg wurst at 785-359-8511 x 3171. This job must be completed by september 1, 2009.
Quick answers
Who was awarded contract W912DQ09P0196?
W912DQ09P0196 was awarded to Eickholt Fencing & Excavating, Inc. by ENDIST Kansas City (US Army Corps of Engineers) on August 11, 2009.
How much is contract W912DQ09P0196 worth?
The government has obligated $30,000 on W912DQ09P0196.
Was contract W912DQ09P0196 competed?
The extent of competition for W912DQ09P0196 was full and open competition after exclusion of sources. The government received 2 offers. It was set aside: Total Small Business.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award